This Subcontract opportunity from Georgia was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Protective Coating Application – Water Treatment Plant Infrastructure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves performing surface preparation and applying protective coatings to various metal equipment, including pipes, tanks, valves, and pumps, at three water treatment facilities located in Cobb County, Georgia. The work aims to maintain and protect critical infrastructure components at these facilities to ensure their longevity and operational efficiency. This subcontract is solicited by the Cobb County-Marietta Water Authority and falls under the NAICS code 238990, which covers specialized trades contractors. The solicitation was posted on May 29, 2026, with a response deadline set for July 8, 2026. Although specific details such as the exact locations within Cobb County and the point of contact are not provided, the contract focuses on essential maintenance services to preserve the water treatment plant infrastructure. Interested parties are directed to the Georgia procurement system for further information and submission procedures.
General Info
Place of Performance
GA, USASet-Aside
Documents
This scope was carved out of PE-66365-NONST-2026-000000033.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
2026 Coatings Program
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 4 days
- PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 5 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
