Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 20, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Provide and Install Fuel Dispensers

Awarded
Q1543100099Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333914
New
DIBBS
RING, WEARING
Solicitation # SPE7M1-27-T-1813
Solicitation SPE7M1-27-T-1813 is a fixed-price requirement issued by the DLA Weapons Support Maritime Supply Chain for the procurement of two wearing rings, identified by NSN 4320-01-54-43339 and Gorman-Rupp Company part number 38691-358. The contract specifies a delivery timeline of 20 days after the award, with an original required delivery date of October 27, 2026. Shipping is designated as FOB Destination, with delivery locations provided for both a parcel post address in the US and a freight shipping address for the Royal Jordanian Air Force in Jordan. Inspection and acceptance will occur at the destination. The contractor must adhere to strict packaging and marking standards, including ASTM D3951 and MIL-STD-129, while ensuring palletization complies with DLA requirement RP001. Technical and quality standards are governed by the DLA Master List (RA001), which takes precedence over ASTM standards. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment. The solicitation is not a small business set-aside, though it utilizes the HUBZone price evaluation preference. Compliance with various DFARS and FAR clauses is required, specifically regarding cybersecurity reporting, the Buy American Act, and prohibitions on covered defense telecommunications equipment. All quotations must be submitted via the DIBBS portal by November 9, 2026.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 7 hours ago

DEADLINE

in 11 days
NAICS: 333914
New
Federal
Hanscom Aero Club Automated Fuel Management System Replacement
Solicitation # 2027-PZI-1839
Solicitation 2027-PZI-1839 is a firm-fixed-price contract, estimated at 30,000 dollars, for the replacement of an obsolete fuel management terminal at the Hanscom Aero Club fueling facility at Hanscom Air Force Base, Massachusetts. This procurement is a 100 percent Total Small Business Set-Aside under NAICS 333914. The contractor is required to provide all labor, materials, and technical expertise to decommission and remove an existing QTPod M3000 terminal and pedestal, and subsequently furnish, install, and commission one new brand-name QTPod M4000 automated fuel management terminal. The system must integrate with JPMorgan Chase Paymentech and comply with Department of the Air Force IT and cybersecurity mandates. The total period of performance is 45 calendar days from the Notice to Proceed, with the physical on-site installation and commissioning limited to two consecutive business days. Key deliverables include an ATO technical package due within 10 days of award, a PCI Attestation of Compliance, and a final commissioning and checkout report. Award will be based on the Lowest Price Technically Acceptable (LPTA) method. Technical acceptability requires the use of certified fueling technicians, provision of QTPod M4000 cut sheets, and proof of active PCI compliance. All invoices must be submitted electronically via Wide Area WorkFlow.
FA2835 Aflcmc Hanscom Pzi

POSTED

about 12 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Department of the Interior, through the Dsc Contracting Services Division, issued an award notice for solicitation Q1543100099 regarding the provision and installation of fuel dispensers. The contract was posted on September 20, 2010, and falls under NAICS code 333914. The contracting office is located in Denver, Colorado. This procurement focused on the delivery and setup of fueling equipment to meet the specific operational requirements of the agency.

General Info

Department of the Interior contract for provision and installation of fuel dispensers.

Contract Value

$21,337

NAICS

333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
The Department of Interior, National Park Service is soliciting offers to provide and install fuel dispensers at Theodore Roosevelt National Park, North Dakota. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Far 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a separate, written solicitation will not be issued. This solicitation is issued as a Request for Quote (RFQ) in accordance with FAR Part 12 (Acquisition of Commercial Items). The solicitation number is Q1543100099. The solicitation document and incorporated provisions and clauses are those in effect through the current Federal Acquisition Regulation. The North American Industry classification (NAICS) code is 333913, and business size standard is 500 employees. This acquisition open to large and small businesses alike. All offerors must be registered in the Central Contractor Registration (CCR) and Online Representations and Certifications (ORCA) Systems. The government will award a firm fixed-price contract resulting from the solicitation to the responsible offeror whose offer, conforming to the solicitation, is the lowest price. A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. The government may elect to award without discussions. DESCRIPTION: 1. LOCATIONS a. South Unit of Theodore Roosevelt National Park: (315 2nd Avenue) Medora, ND 58645b. North Unit of Theodore Roosevelt National Park: (207 Maintenance Way) Watford City, ND 58854 2. PROJECT DESCRIPTION/SCOPE OF WORK a. The work of this project consists of furnishing and installing four new individual fleet fueling pumps, two suitable for diesel fuel and two for gasoline. Work includes connections to existing wiring and related components needed to properly operate the new pumps, new pulse outputs, meters, controls, and all required fittings, piping and connections to the existing fuel tanks and or existing supply lines. All hoses, breakaway fittings and nozzles for the vehicle dispensing side of the new pumps will also be replaced with new.b. All new pumps and related equipment must be compatible and work cohesively with the existing Syn-Tech Fuel Master Plus (FMU-2550) computerized fleet data collection system and Veeder Root TLS 300 Fuel Monitoring System.c. Provide all mounting materials, fasteners, connectors needed for new installation and dispose of existing replaced equipment and materials at approved landfill and or recycling facility. All materials that can be will be recycled. These two systems are a part of the fuel dispensing operations at the North and South Units of the park. 3. MATERIALS a. South Unit: i. Provide and install one each electronic gasoline pedestal suction /dispensing pump capable of delivering 22gpm or more per minute and be within a weather proof enclosure. Unit will be single product, single hose (3/4" or 1"), and 1 horsepower electric direct drive positive displacement rotary vane pump/motor with meter. Fluid dispensing pump shall be self priming. Enclosure structure must include exterior area light, display heater and pulser, gallons total meter and single fill meter. Body and frame of enclosure must be galvanized steel and enclosures must have fully removable doors for easy repair access. Access doors must lock with key for security purposes. (GASBOY Model 9853K or equivalent) Pump must incorporate an integrated air separator. Pump unit enclosure assembly must include one spin-on style internal filter.ii. Provide and install one each electronic diesel pedestal suction /dispensing pump capable of delivering 22gpm or more per minute and be within a weather proof enclosure. Unit will be single product, single hose (3/4" or 1"), and 1 horsepower electric direct drive positive displacement rotary vane pump/motor with meter. Fluid dispensing pump shall be self priming. Enclosure structure must include exterior area light, display heater and pulser, gallons total meter and single fill meter. Body and frame of enclosure must be galvanized steel and enclosures must have fully removable doors for easy repair access. Access doors must lock with key for security purposes. (GASBOY Model 9853K or equivalent) Pump must incorporate an integrated air separator. Pump unit enclosure assembly must include one spin-on style internal filter. b. North Unit: i. Provide and install one each electronic gasoline tank mounted explosion proof, suction style, direct drive, positive displacement motor /dispensing pumps combination unit capable of delivering 17gpm or more per minute. Unit will be single product, single hose (3/4" or 1"), 1/3 horsepower electric drive motor with total gallons pumped meter and single fill gallons total meter. Unit must include cabinet, totals meter, single fill meter and pulse output to interface with existing Fuel master and Veeder Root Monitoring systems. (Fill-rite Model FR702 Cabinet style (pump) or equivalent)ii. Provide and install one each electronic diesel tank mounted explosion proof, suction style, direct drive, positive displacement motor /dispensing pumps combination unit capable of delivering 17gpm or more per minute. Unit will be single product, single hose (3/4" or 1") , 1/3 horsepower electric drive motor with total gallons pumped meter and single fill gallons total meter. Unit must include cabinet, totals meter, single fill meter and pulse output to interface with existing Fuel master and Veeder Root Monitoring systems. (Fill-rite Model FR702 Cabinet style (pump) or equivalent) 4. CONNECTIONS Provide and install all appropriate equipment and materials for complete, functional and accurate systems. Provide and install necessary piping, fasteners, and sealants, wiring and related materials for a complete job at the conclusion of the project. Vendor must provide all work and equipment needed so new fuel pumps work accurately and seamlessly with existing Fuel Master fuel tracking/dispensing program and with existing Veeder Root tank monitoring systems. All work to be done shall be by capable trade's workers to include a licensed electrician for electrical work. All connections to the existing Veeder Root TLS 300 Monitoring Systems and Fuel Master Data Tracking Systems must be completed properly so as to protect these entire systems and their included components from damage and to ensure both work properly upon completion of the project. 5. INSTALLATION OF FOUR PUMPS, METERS, PULSERS, CABINETS, HOSES AND NOZZLES a. Provide sealants, gaskets and other required materials to make needed connections according to all included suppliers' specifications and work practices. b. All included equipment and materials to meet requirements of UL and NFPA and other applicable standards.c. Protect all equipment and materials from scratches or other damage during installation.d. Fuel Pump Accessories: Must work with Syn-Tech Fuel Master Plus Unit (FMU-2550) and Veeder Root TLS 300 Monitoring Systems. Contractor must install, program and calibrate new pump units and Interface to existing Fuel Master and Veeder Root systems.e. Install new equipment in same footprint location and ports as existing units.f. Verify pump operation and dispensing unit calibrations are accurate and no leaks exist at completion of project. Provide keys as needed for two required lockable cabinets. Pump meter accuracy must be +- 1%. 6. SUBMITTALS a. Dispensing Pumps, pump enclosures, fill hoses and break-away fittings and fuel auto shut-off nozzles. Submit manufacturer's literature and installation instructions for fuel dispensing pumps.b. As-built operation and maintenance data if wiring schematic or other changes are made.c. Manufacturer's operation and maintenance data for all fuel pumps and equipment upon close-out of project. 7. DEMONSTRATION AND PROJECT CLOSEOUT a. Provide operational instructions to COR and staff as designated by park Chief of Maintenance.b. Keep work areas clean during project and upon completion of required work, remove old equipment from NPS site. PROVISIONS AND CLAUSES: The following Federal Acquisition Regulation (FAR) provisions and clauses are available on the internet at: https://www.acquisition.gov/far/ and they will be incorporated into final contract award documents as appropriate. FAR 52.212-1 Instructions to Offerors Commercial Items; FAR 52.212-3 Offeror Representations and Certification Commercial Items; FAR 52.212-4 Contract Terms and Conditions Commercial Items; FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Items; FAR 52.233-3 Protest After Award; FAR 52.233-4 Applicable Law for Breach of Contract Claim; FAR 52.219-06 Notice Small Business Aside; FAR 52.222-3 Convict Labor; FAR 52.222.21 Prohibition of Segregated Facilities; 52.222-26 Equal Opportunity; FAR 52.225-1 Buy American Act; FAR 52.225.13 Restrictions on Certain Foreign Purchases; FAR 52.222-21 Prohibition of Segregated Facilities; FAR 52.232-33 Payment by Electronic Funds Transfer-Central Contractor Registration; FAR 52.222-36 Affirmative Action for Workers with Disabilities; FAR 52.222-26 Equal Opportunity; FAR 52.222-41 Service Contract Act of 1965; FAR 52.222-50 Combating Trafficking in Persons; FAR 52.222-43 Fair Labor Standards Act and Service Contract Act Price Adjustment; FAR 52.203-3 Gratuities; FAR 52.203-5 Covenant Against Contingent Fees; FAR 52.204-3 Taxpayer Identification; FAR 52.204-7 Central Contractor Registration; FAR 52.204-9 Personal Identity Verification of Contractor Personnel; FAR 52.237-1 Site Visit; FAR 52.237-2 Protection of Government Building, Equipment, and Vegetation; FAR 52.243-1 Changes-Fixed-Price; FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price); FAR 52.249-8 Default (Fixed-Price Supply and Service). North Dakota Wage Determination No.: ND100006 07/23/2010 ND6 is applicable to this solicitation and resulting award. The Wage Determination is available at http://www.wdol.gov/. Use the following format to submit quotes: Materials $_____________ Labor $_____________ Total $_____________ Submit quotes and questions via email or fax to Brian Peck, Purchasing Agent, National Park Service, Midwest Regional Office/NEKOTA MABO, email: contact@example.gov; fax: +1 (555) 000-0000; phone: +1 (555) 000-0000. All questions must be submitted in writing via email or fax. Questions must be received at least 3 days prior to the close date. This solicitation will close at 1:00 PM Mountain Time, on September 17, 2010.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in about 20 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS