This Solicitation opportunity from Utah was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Provo City School District - Pyramid Skylight Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves procuring and installing multiple pyramid skylights of various standard and custom sizes for the Provo City School District, specifically at Amelia Earhart Elementary. The project requires installation of two 7' x 7', one 10' x 10', three 14' x 14' standard pyramid skylights, and two custom 17'4" x 17'4" pyramids, all featuring a 33-1/3° slope. These skylights will be constructed with 2 3/4" Kalwall translucent panels incorporating a 12" x 24" Shoji grid pattern, along with specific crystal and white face sheets. The design includes premium color epoxy-coated aluminum components to ensure corrosion resistance, and the structures must meet specified live, snow, wind, and drift load requirements for durability and safety. The procurement process will result in a single contract awarded to the vendor deemed most responsive and responsible, based on a scoring methodology in accordance with the procurement code. A mandatory walkthrough is scheduled for May 20, 2026, at the school site, and all proposals must be submitted by May 27, 2026, at 2:00 PM Mountain Time. The contractor will be responsible for the complete project until satisfactory completion as agreed upon by both parties. Pricing must be fully guaranteed for the project duration, ensuring budget certainty for the school district throughout the installation and completion phases.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The purpose of this RFP is to enter into a contract to provide and install: (2) Standard Pyramids 7'-0" x 7'-0" OCD flat, (33-1/3° slope). (1) Standard Pyramid 10'-0" x 10'-0" OCD flat, (33-1/3° slope). (3) Standard Pyramids 14'-0" x 14'-0" OCD flat, (33-1/3° slope). (2) Custom Pyramids 17'-4" x 17'-4" OCD flat, (33-1/3° slope).
Details - 2 3/4" Kalwall translucent panels - 12" x 24" Shoji grid pattern- .070" Crystal face sheet & .045 White interior sheet - .23TB "U" factor - All exposed aluminum to be premium color (Coro Blue #48-C) Kalwall Corrosion Resistant Finish. - Roofs are designed for 35 PSF live load, 0 PSF snow load, 25 PSF (ASD) wind load, and 0 PSF drift load with L/60 deflection.
It is anticipated that this RFP will result in a single contract award to the responsive and responsible vendor with the highest score justified by the procurement code.
The closing date and time for this sourcing event is Wednesday, May 27th, 2026 @ 2:00 PM Mountain Time. It is your responsibility to make sure you submit your response by the date and time indicated above. There will be a mandatory walkthrough on May 20th, 2026 @ 1:30 PM Mountain Time at Amelia Earhart Elementary, located at 2585 W 200 S St, Provo, UT 84601.
The contract resulting from this RFP will be for the entirety of the project. The contract will end after the District and the contractor agree that the project is completed satisfactorily. All pricing must be guaranteed for the entirety of the project.
