Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PRV Station 1 Rehabilitation Project, City of Renton, WA #CAG-26-096

Closed
CAG-26-096State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The PRV Station 1 Rehabilitation Project for the City of Renton, Washington, involves the full installation and replacement of water facilities as specified in the construction plans. The primary scope of work includes replacing PRV 1 with a new unit located in the unimproved right-of-way at Taylor Place SW, connecting the station to existing ductile iron and cast iron mains, and abandoning the old PRV and associated piping. The project also requires the installation of a 3-inch pressure relief valve with an above-ground discharge pipe, a concrete energy dissipation pad, and the extension and grading of the existing surface water ditch. Additional requirements include comprehensive site work such as construction surveying, trench excavation, shoring, dewatering, and the removal and replacement of asphalt pavement, concrete curbs, gutters, and sidewalks. The contractor is responsible for furnishing and installing approximately 80 linear feet of 8-inch and 110 linear feet of 10-inch ductile iron water pipe, along with a tapping tee and valve assembly. The project mandates strict adherence to TESC measures, temporary traffic control standards, water main disinfection, and the protection and potholing of existing utilities to resolve potential conflicts.

General Info

Renton project to replace PRV Station 1 water facilities and install new piping.

Documents

324

Bid Results - Page 1.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Plans - Page 10.jpg

JPG

Plans - Page 1.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 3.jpg

JPG

Plans - Page 4.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 6.jpg

JPG

Plans - Page 7.jpg

JPG

Plans - Page 8.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 134.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Renton
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Renton
Office AddressN/A

Interested Companies (13)

CeccantiTacoma, WA
Northwest BarricadeEverett, WA
Kar-Vel ConstructionRenton, WA

See All 13 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to:
- Construction surveying, staking, and production of as-built drawings.
- Replace PRV 1 with the proposed PRV, located outside the traveled roadway and shoulder. The new PRV will be located in the unimproved ROW, south of the existing PRV 1, at the west shoulder of Taylor Place SW adjacent to 564 Stevens Ave NW.
- Connect the station inlet to the 12” DI on Taylor PL NW and the outlet to the 10” CI on Taylor PL NW.
- Abandon the existing PRV and 10” Cl between the point of connection of the replacement PRV and connection to the 12” DI at S 124th St.
- Install new PRV, piping, and appurtenances.
- Install 3-inch pressure relief valve and piping, with an above ground discharge pipe that discharges water to the existing surface water ditch along the south side of Taylor Pl NW.
o Installation of a concrete pad for energy dissipation from discharge pipe.
o Extension and grading of the existing surface water ditch as indicated and/or directed.
- Trench excavation, including removal of existing unsuitable material, removal and abandonment of existing utilities, disposal of excavated material, shoring, and dewatering.
- Removal and replacement of asphalt concrete pavement, asphalt overlay, concrete curbs, gutters, sidewalks and driveways.
- ROW Surface and other restoration.
- Furnish and install approximately 80 LF ductile iron Class 52 8-inch diameter restrained joint water pipe and restrained joint fittings with polywrap.
- Furnish and install approximately 110 LF ductile iron Class 52 10-inch diameter restrained joint water pipe and restrained joint fittings with polywrap.
- Furnish and install a 12-inch x 10-inch tapping tee and valve assembly.
- Installing and maintaining adequate TESC measures and restoring all disturbed areas.
- Temporary traffic control measures following the contract documents and applicable City of Renton, King County, and MUTCD standards.
- Testing and disinfecting of water mains.
- Protecting existing utilities, utility potholing and resolution of utility conflicts.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS