Preston School District 201 is soliciting a comprehensive infrastructure refresh for the 2026-27 period, focusing on network hardware, cabling, and server upgrades. The procurement includes a significant amount of physical housing with 24 network cabinets of varying sizes, 10 UPS units, and a high-specification Dell R760 caching server. Network connectivity will be enhanced through the installation of Sophos firewall modules, 80 Ruckus SFP+ modules, and a wide array of Ruckus wireless access points tailored for classrooms, large common areas, and external use. The project involves extensive cabling and termination work, including the installation of 44 patch panels, hundreds of color-coded keystones and patch cables, and specific single-mode fiber runs across multiple locations including PHS, PJH, and OAK facilities. These fiber connections range from short office runs to long-distance links between labs and MDF/IDF locations. All procurement must adhere to Idaho Code 67-2806, which mandates a formal RFP process for purchases between 75,000 and 150,000 dollars.
General Info
Place of Performance
Preston, ID, 83263, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
4300XGS Sophos Firewall Modules 4port SFP+ Module x2
Ruckus SFP x80 SFP+ LR 10gb
Single Mode Patch Cables and Splicing for LAG Connections x120 3m Single mode fiber patch cables + Splicing where needed in trays to terminate to create lag connections to all cabinets
Fiber connections IT Office Desk to IT MDF 50ft IT Office West Workbench to IT MDF 50ft IT Center Workbench to IT MDF 50ft
PHS LAB 1 50ft run to PHS NOC PHS LAB 2 50ft run to PHS NOC PHS LAB 3 200ft run to PHS NOC PHS LAB 4 10ft run to IDF 4 patch tray then it is ran 5ft to relay splice enclousure to PHS NOC PHS IDF 3 100ft run to IDF 4 relay splice enclouse to PHS NOC PHS IDF 2 300ft run to IDF 4 relay splice enclouser to PHS NOC
PJH LAB 250ft run to PJH MDF
OAK LAB 50ft run to OAK MDF OAK IDF2 200ft run to OAK MDF PIO LAB 100ft run to OAKPIO IDF2 OAKPIO IDF 1 100ft to OAKPIO IDF2
Patch Panels x44 24P ethernet Patch panels for keystones Cable Matters 180013
Replacement Keystones 100 Red CAT6 Keystones 40 Green CAT6 Keystones 200 White CAT6 Keystones 200 Black CAT6 Keystones 100 Orange CAT6 Keystones 200 Blue CAT6 Keystones
Replacement Patch Cables 100 Black .5 CAT6 Patch Cables 40 Green .5 CAT6 Patch Cables 200 White .5 CAT6 Patch Cables 200 Yellow .5 CAT6 Patch Cables 100 Orange .5 CAT6 Patch Cables 200 Blue .5 CAT6 Patch Cables
PHS, District Office, and FCHS AP Refresh x4 Ruckus AP Large area x2 GYM, Cafeteria, Lunch Room x60 Ruckus AP Classroom x4 External AP
Additional UPS x10 UPS 2U
Caching Server Refresh x1 Dell Server R760 (20+ Core CPU, 128gb Memory, 10 4tb+ Storage Drives with 8 bay 3.5 Harddrives)
Requested services (38 line items): - Category 2 — Internal Connections — Caching And Necessary Software And Licenses - Category 2 — Internal Connections — Cabling - Category 2 — Internal Connections — Racks - Category 2 — Internal Connections — Wireless Access Points And Necessary Software And Licenses - Category 2 — Internal Connections — Antennas, Connectors, And Related Components - Category 2 — Internal Connections — Firewall Service, Components, And Necessary Software And Licenses - Category 2 — Internal Connections — Uninterruptable Power Supply/Battery Backup And Necessary Software And Licenses
State/local procurement requirements: Idaho Code 67-2806 Any purchase over 75k - 150k requires RFP.
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260018750/142602/21069324-USAC_FCC_FORM_470_APPLICATION_260018750_CERTIFIED.pdf
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS