This Solicitation opportunity from Texas was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PSE, Waco District, Hamilton Relief Route - US 281/SH 36
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Texas Department of Transportation is soliciting Preliminary Survey and Engineering services for the Hamilton Relief Route project within the Waco District, spanning US 281 from the Leon River to County Road 506 and SH 36 from US 281 to SH 36, with the goal of constructing a new relief route to alleviate traffic congestion. The solicitation, identified as 601CT0000006465 and posted on June 4, 2026, requires responses by June 25, 2026, and is classified under NAICS code 541360 for engineering services. Performance will occur entirely within the State of Texas, specifically along the designated roadway corridors, and all deliverables must align with TxDOT’s engineering standards and practices, though specific technical specifications are not detailed in the available information. The point of contact for questions and submissions is Allison Kurwitz, reachable via email or phone, and all proposals must be submitted electronically through the TxDOT Bonfire portal. The contract does not include disclosed pricing, estimated value, or payment details, and no contracting officer, COR, or COTR is formally identified, with oversight likely handled through the provided contact. There is no information on the evaluation criteria, award basis, or specific scoring factors, and no special requirements such as key personnel designations, security clearances, or organizational conflict of interest provisions are listed. The solicitation does not reference packaging, marking, invoicing methods, or accounting codes beyond the agency's AAC number, and no representations or certifications from offerors are available since the response period has not yet opened. While the performance period and delivery schedule are undefined, the nature of PS&E services suggests a project timeline tied to design maturity and construction readiness, with final acceptance expected at the project site by TxDOT officials. Offerors must ensure compliance with state transportation design standards and submit proposals through the designated portal without any additional documentation specified.
General Info
Agency
NAICS
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
