This Solicitation opportunity from California was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Public Safety Facility Boiler Replacements

Closed
CP 25-067State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a multi-building plumbing leak repair project at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing heat pipe sections in the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, OSHA regulations, and NFPA Standard No. 101. Contractors are responsible for providing new commercial-quality materials, performing all necessary cutting and patching, and removing all debris from the site daily. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a quote validity period of at least 60 days. Required administrative documentation includes a SAM.gov UEI number, active registration, Massachusetts business licenses, a signed W-9, and the ETR Vendor Acknowledgement form. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, the Service Contract Act, and FAR clauses regarding debarment and anti-lobbying. Depending on the final contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to remove and replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. This small business set-aside opportunity, under NAICS 238220, has an estimated price range of 0 to 25,000 dollars. The contractor is responsible for providing all labor, materials, equipment, and permits, including the provision of all required refrigerant and the removal of unused packaging. Key deliverables include two sets of operation and maintenance manuals, manufacturer and installer warranties, a detailed timeline of work, and a schedule of values using AIA Document G703 or an equivalent form. Bids will be awarded based on overall best value, and interested parties must complete a physical site visit and sign an attendance roster prior to submission. Required bid documentation includes a detailed cost breakout, proof of insurance, three references, and the MTC Supplier Packet containing a W-9 and self-certification forms. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price. Compliance with the Davis-Bacon Act, OSHA safety standards, and FAR regulations regarding first-tier subcontractor information and foreign purchase restrictions is mandatory. Payment applications must be submitted to the procurement department using AIA Document G702 or an equivalent, with certified payroll submitted weekly.
San Diego Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in about 7 hours
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes replacing motors for fans 1, 2, and 4, providing and installing a missing motor, blade, and guard for fan 5, and relocating the thermostat for fan 3. Additionally, the contractor must replace aged thermostats, relays, and louver actuators across the system and verify the proper operation of all units in accordance with building codes and manufacturer requirements. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to the responsible offeror who is technically acceptable and provides the lowest price. Proposals must be submitted electronically to [email hidden] by October 30, 2026, and must include a detailed scope of work, evidence of Kentucky state licensing and registration, a completed W-9, a New Vendor Profile, and proof of bonding capability. Contractors must comply with Davis-Bacon Act labor standards and FAR 22.403-1 wage rate requirements, with weekly certified payroll submissions required for invoice acceptance. Performance is subject to OSHA and EPA regulations, including the maintenance of Material Safety Data Sheets and chemical application logs. Final payment is contingent upon satisfactory performance and the delivery of lien releases from all subcontractors and material suppliers. Acceptance of work involves a substantial completion walk-through and a final inspection conducted by the center director or an authorized representative.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The City of Turlock is soliciting sealed proposals for the replacement of boilers at its Public Safety Facility under solicitation number CP 25-067, with responses due by 9:00 p.m. on May 26, 2026. The contract, issued by the Municipal Services-Engineering division, is a fixed-price arrangement requiring contractors to furnish all labor, materials, tools, and equipment to complete boiler replacements in strict compliance with City of Turlock and Caltrans standard specifications, the California Building Code, OSHA regulations, and ADA requirements. Work must begin within ten working days of the Notice to Proceed, achieve substantial completion within fifteen working days, and reach final completion within twenty-five working days. The place of performance is the Public Safety Facility in Turlock, California, with all submissions required electronically via the OpenGov Procurement Portal; physical proposals are not accepted. The contract includes mandatory provisions such as background checks for all personnel entering the facility, adherence to inspection protocols conducted by the City Engineer, and full compliance with documentation requirements including certified submittals, test reports, and as-built records. Payment is not tied to formal federal invoicing systems, and no remittance details or accounting codes are provided. The contract value remains TBD, as pricing fields in bid schedules are blank, and no estimated budget is disclosed. The solicitation requires offerors to submit a Bidder’s Form, Affidavit, Non-Collusion Affidavit, Bidder’s Bond, proof of licensing, and product data sheets, with documents submitted in PDF format as supported by the portal. Offerors must complete and upload specific forms if they claim Disadvantaged Business Enterprise (DBE) participation, use surety bonding through Surety2000, subcontract work, request material substitutions, or have changes in lobbying disclosures. While the contract references Exhibits A through E to supplement technical details, no formal attachment list is provided. No evaluation factors, weights, or award rationale are disclosed, and the procurement does not reference federal acquisition regulation clauses, instead using internally numbered contract sections such as Authority, Governing Law, and Severability. The sole point of contact for the procurement is Charlotte Calvario, Capital Projects Coordinator, who serves as the primary liaison for questions and contract administration, with no designated COR, COTR, or PCO identified. The contract does not include options, OCI provisions, or FOB terms, and all work must be performed in a workmanlike manner with materials inspected either at origin

General Info

City of Turlock seeks proposals for Public Safety Facility boiler replacements, deadline May 26, 2026.

Documents

16

Bidder's Bond for City of Turlock Project

PDF, High priority: read this firstbidder-bond
High

City of Turlock CP 25-067 Public Safety Facility Boiler Replacements

PDF, High priority: read this firstrfp
High

City of Turlock Project CP 25-067 Public Safety Facility Boiler Replacements

PDF, High priority: read this firstrfp
High

City of Turlock Project CP 25-067 Public Safety Facility Boiler Replacements

PDF, High priority: read this firstrfp
High

Exhibit 12-B Bidder’s List of Subcontractors

PDF, High priority: read this firstsow
High

Exhibit 15-H Proposer/Contractor Good Faith Efforts

PDF, High priority: read this firstsow
High

Public Improvement Agreement for CP 25-067 Boiler Replacements

PDF, High priority: read this firstcontract-document
High

Public Improvement Agreement for Public Safety Facility Boiler Replacements - City of Turlock CP 25-067

PDF, High priority: read this firstcontract-document
High

Subcontractors Listing Form for California Public Contract

PDF, High priority: read this first1 page · subcontractors-listing
High

Affidavit of Non-Collusion for Bid Submission

PDF, Low priority1 page · affidavit
Low

Disadvantaged Business Enterprises (DBE) Certification Status Change Instructions

PDF, Low priority2 pages · other
Low

Disclosure of Lobbying Activities SF-LLL

PDF, Low priority2 pages · disclosure-of-lobbying-activities
Low

Exhibit 15-G Construction Contract DBE Commitment

PDF, Low priorityform
Low

Exhibit 17-F Final DBE Utilization Report

PDF, Low priorityform
Low

Specifications Responsibility Notice - City Engineer William D. Morris

PDF, Low priorityspecifications
Low

Attachment_K_-_Aerial_View.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 2, 2026 to May 26, 2026.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Services-Engineering
Contacts1 person available
OfficeTurlock, CA, 95380, USA
Office AddressTurlock, CA, 95380, USA
Contacts
Charlotte CalvarioCapital Projects Coordinator

Interested Companies (20)

ConstructconnectCincinnati, OH
Dodge Construction NetworkGrand Prairie, TX

See All 20 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Sealed proposals will be received by the City Engineer of the City of Turlock, Engineering Division for Project Title . The work consists in general of Brief Description of Service(s)/Product(s) .

More opportunities from California → Municipal Services-Engineering

Same awarding agency

NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The City of Turlock is soliciting bids for Project No. 26-044, the Transit Area Asphalt Resurfacing project in Stanislaus County, California. With an engineer's estimate of $233,000.00, the scope of work includes cold milling, subgrade removal, and the installation of three inches of hot mix asphalt across approximately 28,400 square feet of pavement at the City's active Transit Corporation Yard. The project also requires the installation of temporary and permanent thermoplastic striping for bus parking stalls and the reinstallation of parking curb stops. Due to the yard's role in daily CNG bus fueling, all work must be phased within strict weekend-only windows to accommodate fueling schedules and asphalt cure times. The contract will be awarded to the lowest responsive and responsible bidder possessing either a General Engineering (A) or Earthwork and Paving (C-12) license. Bidders must submit proposals via the OpenGov portal by 1:00 pm on November 4, 2026, including a 10% bid bond and an affidavit of non-collusion. Awarded contractors are required to provide performance and payment bonds equal to 100% of the contract price and must comply with California prevailing wage laws. Performance is expected to begin within ten working days of the Notice to Proceed, with substantial completion required within three working days of the start of work. The project is subject to strict quality control standards, including the submission of a quality control plan and a Job Mix Formula for approval.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
SLED
Water Line Replacement on S Center Street and Crane Avenue
Solicitation # 24-022
The City of Turlock, California, is soliciting bids for Project No. 24-022, which involves the water line replacement on S Center Street and Crane Avenue. The scope of work includes the installation of approximately 1,677 lineal feet of new PVC water main pipe and new water service laterals, the removal of existing water main pipe, and the restoration of trenches. The Engineer's Estimate for the project is $1,100,000. Bidders must hold a General Engineering Contractor (A) or Pipeline Contractor (C-34) license and provide a bid bond equal to 10% of the total bid. The contract will be awarded to the lowest responsive and responsible bidder based on licensing, insurance compliance, and relevant experience. The project timeline requires work to commence within ten working days of the Notice to Proceed, with substantial completion due within 60 working days and final completion within 65 working days. Substantial delay damages are set at $2,800 per substantial working day and $700 per final working day. The contractor must provide performance and payment bonds each equal to 100% of the contract price and adhere to California prevailing wage rates. Payment will be made via monthly progress invoices, subject to a 5% retention released approximately 35 days after the Notice of Completion. Proposals are due by 11:30 am on November 4, 2026, via the OpenGov Procurement Portal.
Water and Sewer Line and Related Structures Construction

POSTED

about 22 hours ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS