Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on October 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pump Station 43 Replacement

Closed
27-014-2230State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Cedar Creek Section 2 Phase 2 Pipeline Replacement
Solicitation # 26-170
The Tarrant Regional Water District (TRWD) is soliciting proposals for the Cedar Creek Section 2 Phase 2 Pipeline Replacement Project, identified as solicitation 26-170. The project involves replacing approximately 4.4 miles of 72-inch prestressed concrete cylinder pipe with new welded steel raw water transmission pipelines ranging from 72 to 102 inches in diameter. The work extends from Mouser Way to the Kennedale Balancing Reservoir in southeast Tarrant County, Texas, and will be executed within a 130-foot-wide easement. The scope includes the use of open-cut and trenchless construction methods, including two new tunnel installations and the reuse of an existing casing for TxDOT and Union Pacific Railroad crossings. Additional requirements include the installation of air release, blow-off, and butterfly valves, as well as the abandonment or removal of existing facilities. The contract will be awarded based on best value, with evaluation criteria weighted across proposed price and timeline (40 points), project approach (20 points), offeror experience (20 points), and key personnel qualifications (20 points). Bidders must provide a bid bond and comply with Texas Government Code requirements, including the payment of prevailing wages and the provision of performance and payment bonds. Proposals are due by December 10, 2026, via the OpenGov electronic bidding system. The selected contractor will be required to implement a comprehensive Quality Control Plan and utilize a designated online project management information system for all documentation and communications with the TRWD project team.
Infrastructure Engineering

POSTED

about 2 hours ago

DEADLINE

in 27 days
NAICS: 237110
New
SLED
San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Solicitation # 26-NIIB-052
The West County Wastewater District is soliciting bids for the San Pablo Dam Road 24 inch ACP CIPP Trunk Line Rehabilitation project, solicitation number 26-NIIB-052. The project involves the rehabilitation of a 24 inch ACP Class 5000 trunk sewer between manholes MHM17105 and MHM17106, where a previous liner has failed. The selected contractor will install approximately 420 linear feet of Cured-in-Place Pipe (CIPP) liner. To minimize impacts on traffic and sewage flow, construction must be performed during nighttime hours. Key deliverables include the liner installation, post-installation CCTV inspection videos, as-built drawings, and the acquisition of a Contra Costa County Encroachment Permit. The project is expected to be completed within 30 to 45 calendar days of the Notice to Proceed. The contract will be awarded to the lowest responsible bidder based on the total bid price and satisfactory qualifications. Bidders must submit a comprehensive package by November 13, 2026, including a bid form, a 5 percent bid security, a non-collusion declaration, a disqualification questionnaire, and a CARB In-Use Off-Road Diesel-Fueled Fleet Rules certification. Additionally, contractors must provide a statement of qualifications, a designation of subcontractors for work exceeding 0.5 percent of the total, and proof of DIR registration and CSLB licensing. The successful contractor is required to provide payment and performance bonds, adhere to California prevailing wage rates, and employ a project manager, on-site superintendent, and a designated safety representative.
Infrastructure and Planning

POSTED

about 3 hours ago

DEADLINE

in about 3 hours

AI Contract Overview

Show more

The Pump Station 43 Replacement project, issued by the City of Chesapeake Department of Public Utilities under solicitation IFB 27-014-2230, involves the comprehensive construction and installation of critical sewer infrastructure. The scope of work includes installing approximately 2200 linear feet of 6-inch discharge pipe and 30 linear feet of 8-inch influent force main sewer, along with new rail-mounted submersible pumps, pump wells, separate valve vaults, and associated improvements. Technical requirements include the implementation of Schneider M340 PLCs and Harmony HMIs for control logic, adherence to HRPDC Regional Construction Standards Sixth Edition, and compliance with VDOT specifications. The project also necessitates extensive site work, including pavement demolition, asphalt and concrete restoration, and strict utility coordination via Virginia 811. The contract will be awarded to the lowest responsive and responsible bidder based on a total computed price derived from unit prices and lump sum bids. Awardees must provide 100 percent performance and payment bonds and execute the agreement within ten days of the Notice of Award. Performance must commence within ten days of the Notice to Proceed, with work conducted in accordance with OSHA excavation standards and various federal and state non-discrimination and immigration laws. Final acceptance is contingent upon a successful final inspection by the Owner and Engineer, with a Certificate of Substantial Completion issued within fourteen working days of the completion and inspection date.

General Info

City of Chesapeake contract for Pump Station 43 sewer infrastructure construction and installation.

Documents

13
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstamendment
High
PDF, Low priorityindustry-day
Low
PDF, Low priorityindustry-day
Low
PPTX, Low priority15 pages · industry-day
Low
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Public Utilities
Contacts2 people available
OfficeChesapeake, VA, 23322, USA

Interested Companies (38)

American Contracting & Environmental ServicesMarriottsville, MD
Arcadis, U.SVirginia Beach, VA

See All 38 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Work under this Project consists of the installation of approximately 2200 LF of 6-inch discharge pipe and approximately 30 LF of 8-inch influent force main sewer. This project will also include the installation of new rail-mounted submersible pumps and pump wells, pump well connections, separate valve vaults, and other associated improvements.
Official Notice #1: Reminder of Mandatory Pre-Bid today, Friday October 2nd at 2:00pm : October 2, 2026, 2:00pm Human Resources Training Room, located on the 4th Floor, City Hall Building, 306 Cedar Road, Chesapeake, VA 23320 and via video-conference at 2:00 PM, local time on Friday, October 2, 2026, by visiting www.zoom.us , https://us06web.zoom.us/j/85020749440 If you are attending virtually, please join 10 minutes early so we can take attendance.
Addendum #1: Addendum #1- IFB 27-014-2230 PUMP STATION 43 REPLACEMENT This addendum includes items from the mandatory Pre-Bid meeting held October 2, 2026 at 2:00pm: Pre-Bid Attendance lists, questions received and responses given, updated drawing sheets, and a revised bid form. Attachments: PREBID_SIGN-IN_SHEETS.pdf, CoC_Pump_Station_43_PREBID_Meeting.pptx, IFB_27-014-2230_PUMP_STATION_#43_REPLACEMENT_PRE-BID_MEETING_NOTES.pdf, C-100.pdf, C-106.pdf, G-101.pdf, C-502.pdf, OPTION_B-_UNIT_PRICE_BID_-ADDENDUM_#1-posted.pdf, Addendum_#1_-_IFB_27-014-2230-_Pump_Station_43_Replacement_.pdf

More opportunities from Virginia → Public Utilities

Same awarding agency

NAICS: 541330
SLED
Annual Engineering Services for Water and Sanitary Sewer Projects
Solicitation # 27-009-5717
The City of Chesapeake Department of Public Utilities is seeking professional engineering, project management, inspection, and business analysis services for the improvement of water production, water distribution, and sanitary sewer systems. The scope of work includes hydraulic and water quality modeling, strategic planning for water resource identification, and the delivery of technical documentation such as construction plans, specifications, and permits. All projects must adhere to the City of Chesapeake Public Facilities Manual, Hampton Roads Regional Construction Standards, and Department of Public Utilities policies. The City reserves the right to perform work in-house or award large projects through separate procurement actions. This is an as-needed, one-year limited services term contract with options for three additional one-year renewals. The maximum value per contract term is 6,000,000 dollars, with individual project fees capped at 2,500,000 dollars. Selection is based on a points-based evaluation focusing on qualifications and experience (35%), plan and methodology (35%), resources (20%), and past performance (10%). Awardees must be licensed under the City's Business, Professional, and Occupational Licensing Tax ordinance and comply with non-discrimination and safety standards. Invoices are submitted monthly and paid within 30 days. Proposals must be submitted as a single electronic PDF via the OpenGov portal, following a specific tabbed-section format.
Engineering Services

POSTED

7 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS