Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from North Carolina was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pump Station Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Cedar Creek Section 2 Phase 2 Pipeline Replacement
Solicitation # 26-170
The Tarrant Regional Water District (TRWD) is soliciting proposals for the Cedar Creek Section 2 Phase 2 Pipeline Replacement Project, identified as solicitation 26-170. The project involves replacing approximately 4.4 miles of 72-inch prestressed concrete cylinder pipe with new welded steel raw water transmission pipelines ranging from 72 to 102 inches in diameter. The work extends from Mouser Way to the Kennedale Balancing Reservoir in southeast Tarrant County, Texas, and will be executed within a 130-foot-wide easement. The scope includes the use of open-cut and trenchless construction methods, including two new tunnel installations and the reuse of an existing casing for TxDOT and Union Pacific Railroad crossings. Additional requirements include the installation of air release, blow-off, and butterfly valves, as well as the abandonment or removal of existing facilities. The contract will be awarded based on best value, with evaluation criteria weighted across proposed price and timeline (40 points), project approach (20 points), offeror experience (20 points), and key personnel qualifications (20 points). Bidders must provide a bid bond and comply with Texas Government Code requirements, including the payment of prevailing wages and the provision of performance and payment bonds. Proposals are due by December 10, 2026, via the OpenGov electronic bidding system. The selected contractor will be required to implement a comprehensive Quality Control Plan and utilize a designated online project management information system for all documentation and communications with the TRWD project team.
Infrastructure Engineering

POSTED

about 2 hours ago

DEADLINE

in 27 days
NAICS: 237110
New
SLED
San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Solicitation # 26-NIIB-052
The West County Wastewater District is soliciting bids for the San Pablo Dam Road 24 inch ACP CIPP Trunk Line Rehabilitation project, solicitation number 26-NIIB-052. The project involves the rehabilitation of a 24 inch ACP Class 5000 trunk sewer between manholes MHM17105 and MHM17106, where a previous liner has failed. The selected contractor will install approximately 420 linear feet of Cured-in-Place Pipe (CIPP) liner. To minimize impacts on traffic and sewage flow, construction must be performed during nighttime hours. Key deliverables include the liner installation, post-installation CCTV inspection videos, as-built drawings, and the acquisition of a Contra Costa County Encroachment Permit. The project is expected to be completed within 30 to 45 calendar days of the Notice to Proceed. The contract will be awarded to the lowest responsible bidder based on the total bid price and satisfactory qualifications. Bidders must submit a comprehensive package by November 13, 2026, including a bid form, a 5 percent bid security, a non-collusion declaration, a disqualification questionnaire, and a CARB In-Use Off-Road Diesel-Fueled Fleet Rules certification. Additionally, contractors must provide a statement of qualifications, a designation of subcontractors for work exceeding 0.5 percent of the total, and proof of DIR registration and CSLB licensing. The successful contractor is required to provide payment and performance bonds, adhere to California prevailing wage rates, and employ a project manager, on-site superintendent, and a designated safety representative.
Infrastructure and Planning

POSTED

about 3 hours ago

DEADLINE

in about 2 hours

AI Contract Overview

Show more

The contract entails comprehensive site preparation and construction of pump stations including wet well construction, concrete work, and full integration of mechanical and electrical systems for lift stations. The scope involves all necessary groundwork, structural concrete installations, and the installation of pumps and associated equipment required for proper stormwater or wastewater flow management. All work must align with engineering specifications to ensure operational reliability and compliance with municipal infrastructure standards. The solicitation is categorized as a subcontract under NAICS code 237110 for Water and Sewer Line and Related Structures Construction, with a response deadline of August 25, 2026. It is associated with the North Carolina-based Engineering agency, though specific location details for performance or contact points are not provided. Interested parties must submit proposals by the deadline through the designated procurement portal to be considered for award, with no set-aside provisions indicated for small or disadvantaged businesses.

General Info

Site preparation and construction of pump stations with mechanical, electrical, and concrete systems for stormwater/wastewater management.

Documents

This scope was carved out of 2026-RFB-007.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Camp Davis Wastewater System Expansion Contract 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyNorth Carolina → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Site preparation, concrete work, mechanical and electrical installation for lift stations, including wet well construction and pump integration.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS