Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pump Station No. 2 Improvements and Modernization

Forecast
L-24000.2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Scott VurbeffSenior Planner

Full Description

Show more
City Council approval to allow the award of a construction contract for the Pump Station No. 2 Improvements and Modernization Project, which proposes to enhance the station’s reliability, operability, and overall condition through a comprehensive set of upgrades across architectural, structural, mechanical, electrical, and instrumentation systems. Key work includes replacing eight vertical non-clog sewage pumps—four in each of two wet wells—along with five pump motors for Pumps No. 1, 3, 6, 7, and 8. The influent channel will be cleaned and repaired and corroded top supports on Mechanical Screens 1 through 4 will be replaced. Structural repairs will be made to Wet Wells No. 1 and No. 2, involving concrete removal to reach sound layers and replacement of reinforcing steel where needed. The project will also upgrade five motor controllers, replacing Liquid Rheostat types with Reduced Voltage Soft Starters and Variable Frequency Drives, and updating existing RVSS controllers for Pumps No. 7 and 8. Valve replacements include eight hydraulically actuated cone valves, eight suction wedge-type gate valves, and eight discharge wedge-type gate valves. Additional enhancements involve replacing eight flywheels with standardized sizes based on surge analysis, installing new pump supports and discharge piping supports, and designing a new pump seal water supply system. Instrumentation upgrades will include new gauges, sensors, and transmitters for monitoring pressure and temperature remotely via the Distributed Control System (DCS). The project also encompasses miscellaneous architectural rehabilitations in the Mechanical Room and structural improvements throughout the Headworks, pump building, and Pipe Gallery. Any ground disturbance would be minimal and limited to previously developed and disturbed surface areas of the pump station facility during the repair and replacement activities. These efforts collectively aim to modernize the facility and ensure long-term operational efficiency.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational system, including mechanical and electrical components such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on compliance with prescribed requirements, bidder qualifications, and financial ability. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project is governed by EJCDC standard forms and requires the contractor to provide performance and payment bonds equal to the contract price, as well as insurance from companies with an A.M. Best rating of A-VII or better. Performance is monitored by Willis Engineers, and substantial completion is determined upon the Engineer's verification that the work can be utilized for its intended purpose. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

40 minutes ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project adheres to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with all new sidewalks and ramps required to meet current ADA standards. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, the provision of performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and EEO regulations. Subcontracts exceeding 10,000 dollars must include anti-discrimination and forced labor prohibition provisions.
WG Construction Co., Inc.

POSTED

40 minutes ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS