Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on May 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Purchase 15kV Padmount Switchgear

Closed
064-24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335313
New
SLED
Disconnect Switches 35kV
Solicitation # 2026-IFB-MS-0484
The City of Pasadena Water and Power Department is soliciting bids under solicitation number 2026-IFB-MS-0484 to establish a multi-year contract for the purchase of 35 kV disconnect switches. The procurement specifically requires 20 circuit breaker disconnect switches and 7 bus tie disconnect switches, both meeting 34.5 kV, 2000A, three-pole technical specifications. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total price, with evaluations considering material quality, bidder capability, financial resources, and past performance. All equipment must be delivered to the Pasadena City Yards Water and Power Warehouse during off-peak hours, specifically Monday through Thursday between 8:30 a.m. and 2:00 p.m. Bidders must submit all proposals electronically via the City's eProcurement Portal by 3:00 p.m. on November 27, 2026. Required documentation includes Form AA-1, Form AA-2 for labor exceeding $25,000, a Declaration of Non-Collusion, a 12-character Unique Entity Identifier from SAM.gov, and relevant experience forms. Technical compliance is governed by IEEE C37.30.1 standards, and the City reserves the right to conduct factory acceptance testing and inspections at production hold points before shipping. The contract also mandates adherence to the Build America, Buy America Act, ADA accessibility requirements, and California Division of Industrial Relations safety orders. Invoicing is managed through the City's Vendor Invoice Portal, with payments processed on Tuesdays and Thursdays.
Water & Power Department, Power Delivery

POSTED

about 15 hours ago

DEADLINE

in 29 days
NAICS: 335313
New
SLED
Grounding Switches 35kV
Solicitation # 2026-IFB-MS-0454
The City of Pasadena Water and Power department is soliciting bids under solicitation number 2026-IFB-MS-0454 to establish a multi-year contract for the purchase of ten 35 kV three-pole grounding switches. These switches must feature interphase mechanical linkage, vertical drive linkage, pivot arms, guides, and a manual operator, with insulators made of solid core porcelain or composite polymer. All equipment must be designed, constructed, and tested according to IEEE, ASNI, NEMA, and ASTM standards, specifically NEMA SG6 and NFPA 70. The contract will be awarded to the lowest responsive and responsible bidder based on the Grand Total Price. Bids must be submitted electronically via the City of Pasadena eProcurement portal by 3:00 pm on November 30, 2026, and must remain valid for at least 180 calendar days. Required documentation includes a 12-character alphanumeric Unique Entity Identifier from SAM.gov, Form AA-1, a Declaration of Non-Collusion for solicitations over 75,000 dollars, and a relevant experience form. The contractor must adhere to strict packaging and marking requirements, including the use of desiccants and fungicides for sea shipments and specific tagging corresponding to the 3PGRD Bill of Materials. Deliveries are restricted to Monday through Thursday between 8:30 a.m. and 2:00 p.m. at the Pasadena City Yards Water and Power Warehouse. Administrative requirements include compliance with Title VII Equal Employment Opportunity practices and a preference for recruiting Pasadena residents. Payment is contingent upon the submission of a W-9 form and the City's final inspection and acceptance of materials. The City may conduct inspections at production hold points, and suppliers must submit an Inspection and Test Procedure Outline at least three weeks before testing begins. Additionally, the contract requires adherence to the Americans with Disabilities Act, the Rehabilitation Act of 1973, and California's prevailing wage laws under Labor Code Section 1781.
Water & Power Department, Power Delivery

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 335313
New
SLED
JD Cope / DC UPS System
Solicitation # PE-75553-NONST-2027-000000066
Dalton Utilities is soliciting bids for the engineering, manufacture, testing, documentation, delivery, and field services of a complete DC/UPS system for the J.D. Cope Energy Facility in Georgia. The scope of work includes the design and fabrication of a 125 VDC station battery with racks and spill containment, a NERC PRC-005-06 compliant battery monitoring system, redundant paralleling battery chargers, an inverter with a static transfer switch, a manual bypass switch, and an isolation transformer/voltage regulator. Additionally, the project requires a 125 VDC nominal switchboard and various 120VAC and 125 VDC panelboards. The system must adhere to IEEE 450, OSHA, and International Building Code standards. The contract is a Delivered Duty Paid (DDP) agreement with the point of delivery located at 1232 V.D. Parrot Jr Pkwy, Dalton, GA. Bids must be submitted to David Keaton by the deadline of November 11, 2026. Selected suppliers will be responsible for providing a detailed manufacturing and delivery schedule, as well as comprehensive equipment data books and submittals via the Hexagon SDx system. Quality assurance involves a mandatory Inspection and Test Plan, with the possibility of source inspection shop visits by the Engineer. Final acceptance is contingent upon successful post-installation acceptance testing. All submittals must be provided in native Adobe PDF format, and scanned documents are not acceptable.
Dalton Utilities

POSTED

about 17 hours ago

DEADLINE

in 13 days
NAICS: 335313
New
SLED
Double-Sided Padmount Solid Dielectric Switchgear with Integrated Automation - Purchase Order
Solicitation # SY270000491-LR
Anaheim Public Utilities is soliciting proposals under solicitation number SY270000491-LR for the procurement of double-sided padmount solid dielectric switchgear featuring integrated automation cabinets. This requirement supports research and development for a rollout of retrofits within Anaheim's service territory. The scope includes the delivery of three initial units for expedited testing and evaluation, with remaining units subject to written authorization to proceed. All equipment must comply with City of Anaheim Specification E-153 and adhere to the latest ANSI, IEEE, and NEMA standards. Deliveries are quoted FOB Destination to Anaheim, California, with a requirement that goods be offloaded within 21 calendar days of manufacturing completion. The selection process consists of a two-phase evaluation. Phase one is a pass/fail assessment of minimum qualifications, and only successful respondents proceed to phase two, where proposals are scored based on price and cost effectiveness. The City will negotiate with the highest-ranked respondent for each stock code. Suppliers must maintain a valid Taxpayer Identification Number to receive payment and comply with California prevailing wage laws and safety regulations from CAL/OSHA and FED/OSHA. Proposals must be submitted electronically via the portal by the December 4, 2026, deadline, including a completed proposal checklist and detailed rating information for each SKU.
Anaheim Public Utilities

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 335313
New
SLED
JD Cope / 480V Low Voltage Motor Control Centers
Solicitation # 5.5330
Dalton Utilities is soliciting firm bids for the engineering, manufacture, testing, documentation, delivery, and field services for seven indoor 480V motor control centers to be installed at the J.D. Cope Energy Facility in Georgia. The project is part of a new electrical power generation plant utilizing three 18.522MW reciprocating engines. The selected supplier must design, fabricate, and deliver the equipment DDP to the point of delivery in Chatsworth, Georgia. All equipment must comply with UL 845, NEMA ICS 1, ICS 2, and NEMA 1 standards, as well as the National Electric Code, OSHA, and International Building Code. Additionally, materials cannot be procured from China or India, and designs must have a proven domestic service history of at least three years. The contract requires comprehensive documentation, including submittals via the Hexagon SDx project website and the provision of spare parts, tools, and consumables for the first two years of operation. Quality assurance involves potential source inspections at the supplier's facility, with a five-day notice required for hold or witness points. Delivery schedules must be agreed upon within 30 days of the effective date, with specific notification timelines for shipping plans and material lists. Bids must be submitted electronically to David Keaton by the deadline of November 11, 2026.
Dalton Utilities

POSTED

about 17 hours ago

DEADLINE

in 13 days

Documents

2

LES Bid # 064-24 Instructions to Bidders - 15KV Padmount Switchgear

DOCX, High priority: read this firstrfb
High

Lincoln Electric System Bid #064-24 Bid Reply

DOC, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Lincoln Electric System
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
LES Procurement Department; contact@example.gov; All questions must be submitted through this bid portal under the "Clarifications" tab.

More opportunities from Nebraska → Lincoln Electric System

Same awarding agency

NAICS: 332312
New
SLED
Purchase Tubular Structures
Solicitation # 148-26
Lincoln Electric System is soliciting formal bids for the design, detailing, manufacturing, and delivery of S-26-22 tubular steel pole structures and associated hardware for the 70th and Bluff and 128th and Adams substations. The scope includes one A-Frame deadend structure, two H-Frame deadend structures, and two static wire support structures (42ft and 52ft), along with their respective anchor bolt assemblies. All manufacturers must be AISC certified and provide evidence of certification, basic preliminary drawings, PLS-Pole files, and design calculations at the time of bidding. Technical standards require adherence to ASCE 48 for structural design, AWS D1.1 for welding, and various ASTM standards for materials and galvanizing. The contract will be awarded based on the lowest total bid price, delivery date, and any noted exceptions. Key delivery milestones include anchor bolt assemblies for H-Frames by October 1, 2027, and all other structures and bolts by September 1, 2028. Deliveries are FOB Lincoln, Nebraska, with transportation charges paid by the vendor. Payment terms are Net30, following successful testing by LES. Bidders must submit their proposals through the LES Procurement Portal by November 10, 2026, at 2:00 PM CT, and are required to complete an Equal Employment Opportunity Compliance Request Form upon winning the bid.
Fabricated Structural Metal Manufacturing

POSTED

7 days ago

DEADLINE

in 12 days
View Details
NAICS: 423430
New
SLED
CISCO ACI Software Support Renewal
Solicitation # 147-26
Solicitation 147-26 is a two-step unsealing procurement process issued by the Lincoln Electric System (LES) in Nebraska for the renewal of Cisco ACI software and hardware support services. The primary scope involves providing 12-month support terms from November 12, 2026, to November 11, 2027, with some specific items having a shorter 8-month term ending July 31, 2027. Deliverables include SMARTnet Solution Support 8x5xNBD for various N9K and APIC hardware, software application solution support with upgrades for ACI-AD products, and SmartNet support for C9500 devices. To maintain warranty terms, only authorized new Cisco products from authorized partners or distributors are acceptable. Bids must be submitted electronically via the LES Online Procurement System by November 10, 2026, at 2:00 PM CT, as paper copies will not be accepted. Awardees must comply with the laws of the United States and the State of Nebraska, including fair employment practices and the Foreign Adversary Contracting Prohibition Act (LB 1300), which requires certification that the bidder is not a scrutinized company. Payment will be made in full within thirty days following successful testing and acceptance by LES. All transportation charges are to be paid by the vendor, and the delivery date specified in the bid is considered an essential element of the contract.
Computer and Computer Peripheral Equipment and Software Merchant Wholesalers

POSTED

7 days ago

DEADLINE

in 12 days
View Details
NAICS: 541512
SLED
RFP - IT Asset Discovery & Dependency Mapping Solution
Solicitation # 146-26
Lincoln Electric System (LES) is soliciting proposals for an enterprise IT Asset Discovery and Dependency Mapping Solution to improve the visibility, accuracy, and governance of technology assets across its on-premises, cloud, hybrid, endpoint, network, virtual, and remote environments. The selected vendor will provide subscription-based licensing and implementation services, including software, training, documentation, and technical support. A critical technical requirement is the solution's ability to support automated asset discovery and integrate with the Freshservice Asset Module, which serves as the authoritative system of record. Additionally, the solution must support standards-based Single Sign-On with Microsoft Entra ID. The contract is intended for an initial three-year term with two optional one-year extensions. Proposals are due by November 3, 2026, at 2:00 PM Central Time via the LES Procurement Portal. Evaluation will be based on a scoring process considering mandatory requirements, functional capabilities, staff qualifications, the proposed project plan, and the total cost of ownership. Successful bidders must adhere to strict compliance mandates, including the Foreign Adversary Contracting Prohibition Act (LB 1300) certification, Equal Employment Opportunity compliance, and the execution of a Confidentiality and Security Agreement. Payment for approved itemized invoices will be made within 30 days of receipt.
Computer Systems Design Services

POSTED

15 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS