Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Purchase and Installation of Variable Frequency Drive for Selective Catalyst Reduction Tempering Air Fan

Closed
2026-Informal-0453State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333613
New
Federal
3HD 3040 017330673 D5, SHAFT
Solicitation # N00104-26-Q-FD63
Solicitation N00104-26-Q-FD63 is a request for quotations issued by the Navsup Weapon Systems Support Mech office in Mechanicsburg, Pennsylvania, for the procurement of six shafts, identified by NSN 3HD 3040-01-733-0673 D5. This material is designated as Special Emphasis material due to its critical role in shipboard systems, requiring a Certificate of Compliance per CDRL DI-MISC-80678 and strict adherence to higher-level quality standards. The contract is a small business set-aside under NAICS code 333613. Final delivery of the material is required within 200 days, with all certification data due 20 days prior to delivery. Inspection and acceptance will occur at the origin, and the shipping terms are FOB Destination with transportation costs prepaid. The government intends to make a single award based on a best-value determination, prioritizing past performance as the primary evaluation factor and price as the secondary factor. Past performance will be assessed using the DoD Supplier Performance Risk System ratings. Packaging must comply with MIL-STD-2073 and MIL-STD-129, with specific requirements for domestic and overseas shipments. Invoicing and payment are to be processed electronically through the Wide Area WorkFlow system. Offerors must provide safety data sheets for any hazardous materials and ensure compliance with the Buy American Act and various DFARS regulations, including item unique identification and restrictions on ball and roller bearings.
Navsup Weapon Systems Support Mech

POSTED

1 day ago

DEADLINE

in 30 days

AI Contract Overview

Show more

The City of Pasadena Water and Power Department is soliciting proposals for the purchase and installation of a new ABB ACS580 Variable Frequency Drive (VFD) for the Selective Catalyst Reduction Tempering Air Fan at the Glenarm Power Plant. The project involves replacing an existing Teco Sinus Penta 350 HP unit with a 460V, 300 HP, Heavy Duty, NEMA 1 drive, including a remote-mount keypad kit and supplemental components such as fuses and wiring. The scope of work requires the contractor to furnish, deliver, install, program, test, and commission the equipment, as well as remove and dispose of the old VFD. The contract period is scheduled from September 8, 2026, to December 31, 2026, with the VFD delivery required within 30 days of the contract award. The solicitation is an informal process with a submission deadline of September 7, 2026, at 3:00 pm via the City's eProcurement Portal. Award selection is based on the lowest grand total price from responsive and responsible bidders. Required submission documents include a Relevant Experience Form detailing two similar projects, a Unique Entity Identifier (UEI), and various vendor questionnaires regarding legal status and workforce utilization. The contract is subject to Net 30 payment terms, and the successful vendor must provide a Pasadena Business License and proof of insurance prior to the award. Additionally, the procurement incorporates FEMA supplemental terms and federal lobbying certifications.

General Info

Pasadena seeks VFD purchase and installation for Glenarm Power Plant by September 7, 2026.

Documents

11

16001-1-GA Dilution Air Fan General Arrangement Drawing

PDF, High priority: read this first1 page · specifications
High

2026 Informal0453 - Purchase and Installation of VFD

PDF, High priority: read this first28 pages · rfq
High

2026-Informal-0453 Variable Frequency Drive Procurement

PDF, High priority: read this first28 pages · rfq
High

DoIT Technical Assessment Questionnaire Rev 20210806

XLSX, High priority: read this first5 pages · technical-questionnaire
High

Relevant Experience Form for Bid Submission

PDF, High priority: read this first5 pages · past-performance
High

Supplemental FEMA Terms & Conditions v2 (Oct 1, 2024)

PDF, Medium priorityguidance
Medium

Certification Regarding Lobbying - Federal Required Certification

PDF, Low priority1 page · certification
Low

City of Pasadena Unique Entity Identifier Submission Form

PDF, Low priority1 page · other
Low

Field Report - Glenarm Power Plant VFD Package

PDF, Low priorityother
Low

REQUIRED_FORMS - Vendor Questionnaire and Legal Status

PDF, Low priority5 pages · other
Low

Standard Form-LLL Disclosure of Lobbying Activities

PDF, Low priority3 pages · disclosure-of-lobbying-activities
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Water & Power Department, Power Supply
Contacts2 people available
OfficePasadena, CA, 91101, USA
Office AddressPasadena, CA, 91101, USA
Contacts
Gregory StewartPower Plant Shift Supervisor
Alma MurilloPurchasing Specialist

Interested Companies (17)

South Coast ControlsAnaheim, CA
Dodge Construction NetworkGrand Prairie, TX
Metro Builders & Engineers GroupNewport Beach, CA

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
PWP's Glenarm Power Plant consists of five (5) natural gas-fired combustion turbine units (GTs). GT-1, GT-2, GT-3, and GT-4 are simple cycle units and GT-5 is a combined cycle unit. GT-1 and GT2 are 1970's-era Curtiss-Wright simple cycle gas turbines each rated at 26 MW. GT-3 and GT-4 are GE LM6000 simple cycle gas turbines with a capacity of 47 MW each. GT-5 is a combined cycle unit with a GE LM6000 gas turbine and Shin Nippon Steam Turbine with a total combined capacity of 71 MW. These units are mainly used to provide power generation during peak periods.

More opportunities from California → Water & Power Department, Power Supply

Same awarding agency

NAICS: 334516
New
SLED
Replacement Analyzers for Gas Turbines
Solicitation # 2026-IFB-MS-0440
The City of Pasadena Water and Power Department is soliciting bids under solicitation 2026-IFB-MS-0440 for the procurement and delivery of replacement emissions analyzers for gas turbines at the Glenarm Power Plant. This project aims to replace end-of-life components of the Continuous Emissions Monitoring System for one 1970s-era Curtiss-Wright simple cycle gas turbine and two General Electric Model LM6000 simple cycle gas turbines. The required equipment includes Teledyne API Model N200M mid-range chemiluminescence analyzers, internal moly converters with O3 killers, long-life sample filter holders, and rack mounts, along with necessary supplemental components such as filters and pumps. All items must be new, of the latest model, and accompanied by a Certification of Conformance. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest grand total price, with evaluations considering material quality, bidder capability, financial resources, and past performance. Bids must be submitted electronically via the City's eProcurement Portal by November 13, 2026, at 4:30 PM PT. Required submissions include a Unique Entity Identifier from SAM.gov, a Declaration of Non-Collusion, and various vendor certifications regarding equal opportunity and lobbying. Once awarded, the vendor must complete delivery to the Glenarm Power Plant within 60 days, providing all necessary personnel and equipment for unloading and installation assistance. The agreement is governed by California law and includes standard terms regarding indemnity, insurance, and invoicing through the City's Vendor Invoice Portal.
Analytical Laboratory Instrument Manufacturing

POSTED

7 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS