Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Purchase of Partial Discharge Monitoring System

Closed
RFB #P-25-07State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Placer County Water Agency (PCWA) is soliciting bids for the purchase and installation of three Partial Discharge Online Monitoring Systems to replace outdated systems at its Middle Fork and Ralston Powerhouses. Bidders must attend a mandatory pre-bid meeting and walk-through scheduled for October 21, 2025, where they will be briefed on the project scope, site conditions, and safety protocols, including completion of required Hazardous Energy Control Program training. Access to the powerhouses for inspection during the walk-through is strictly controlled and requires submission of a non-disclosure agreement. Bids are due by 3:00 p.m. PST on December 15, 2025, and must be submitted on Agency forms in accordance with the bid documents. The contract includes the supply of three fully functioning partial discharge monitoring systems, complete with coupler capacitors, necessary auxiliary hardware, and wiring to interface with the powerhouse SCADA system. Installation support by the Vendor is required, including commissioning, startup, field testing, and training for PCWA personnel. Work is expected to be performed during the annual maintenance outage in October 2026, with specified working hours and potential for approved overtime. Systems must operate on a 120 Vac – 60 Hz power source and provide data storage and user interface capabilities via Windows or web applications using industrial communication protocols. The agency reserves the right to accept or reject bids and intends to award the contract within 30 days of bid opening.

General Info

PCWA seeks bids for three Partial Discharge Monitoring Systems installation, mandatory pre-bid meeting October 2025.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Supply and Delivery of Hand Tools (Major & Minor Equipment) for the KTC Automotive Mechanics Department – UNRWA -local suppliers only [email hidden]Open now
  • Industrial Piping and Valve SupplyOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
PCWA Purchasing DepartmentPurchasing Department

Full Description

Show more
NOTICE – INVITATION FOR BIDS For the Purchase and installation of three Partial Discharge Online Monitoring Systems at PCWA’s Middle Fork and Ralston Powerhouses Deadline: Submission instructions are included in the Bid Contract Documents. Bids must be received before 3:00 p.m. PST on December 15, 2025. Following Bid Closing Time, the sealed Bid envelopes and Public Purchase Bids will be publicly opened and read at the Agency’s Business Center located at 144 Ferguson Rd. Auburn, CA 95603. Pre-Bid Meeting and Walk Thru: A mandatory pre-bid meeting and walk-through will be held on October 21, 2025, beginning at 07:30 a.m. at 5825 Sunset Drive, Foresthill CA 95631. Bidders are responsible for their own transportation to and from facilities. All Bidders must execute Appendix VI – Critical Energy Infrastructure Non-Disclosure Agreement and either submit a copy to Sign up to see this detail prior to the pre-bid meeting or submit it in person at the pre-bid meeting in order to gain access to the Middle Fork and Ralson Powerhouses. Any Bidder that fails to submit the required agreement will not be allowed to attend the walk through. Pre-Bid meeting and walk through schedule is as follows: 0730 – 0800 – Check In 0800 – 0900 – PCWA Introductions and Bid Document review and HECP verifications 0900 – 1000 – Travel to Middle Fork Powerhouse 1000 – 1030 – Clearance Walk and LOTO verification 1030 – 1200 – Equipment at Middle Fork Powerhouse available for inspection. 1200-1300 Travel to Ralston Powerhouse 1300-1330 – Clearance Walk and LOTO verification 1330-1500 Equipment at Ralson Powerhouse available for inspection Bidders may leave once they have completed their inspection of the equipment, obtained all the information they need and remove their locks from the clearance lockboxes. For the portion of the meeting held at 5825 Sunset Drive, representatives of Placer County Water Agency (“Agency” or “PCWA”) will discuss the bid documents, site constraints, order of work and other items specific to this project. A project walk-through located at the Middle Fork and Ralston Powerhouses will follow. Middle Fork Powerhouse is located at 35000 Mosquito Ridge Road, about 26 miles from Foresthill. Ralston Powerhouse is located at 9600 Blacksmith Flat Rd., about 12 miles from Foresthill. A sign-in sheet will be available up until 0745. After 0745 no more prospective bidders will be admitted nor permitted to sign the sign-in sheet. Attendance at the entire pre-bid meeting and walk-through is mandatory for bidding. The project walk through will entail accessing equipment isolated under the PCWA Hazardous Energy Control Program (HECP). The Agency requires Hazardous Energy Control Program (HECP) training to be completed by all bidders and bidder representatives prior to examining the installation sites, as the examination and inspection of the existing installation conditions are only accessible within an active HECP clearance at the two powerhouses. Click this link https://training.pcwa.net/ to access the training. Please note there are two training courses within this link, but only the HECP training needs to be completed prior to the start of the mandatory site walk. Any prospective bidders wishing to access the equipment must complete training prior to the pre-bid meeting. Completion of the training will be verified prior to locking onto the Agency clearance to access the equipment. Bids received from Bidders who did not sign the sign-in sheet and attend the meeting, and walk-through will be returned to the Bidder unopened. Should any questions be raised at the meeting or walk-through that the Agency considers to alter the Bid Contract Documents in any way, written Addenda shall be prepared and posted on Public Purchase. Oral statements not confirmed by Addenda may not be relied upon and are not binding or legally effective. Except for the mandatory walk-through, no other access to the project site will be granted prior to bid opening. During all site visits the Bidder must be accompanied full-time by an authorized representative of the Agency. There are no exceptions to this requirement. There is no expressed or implied obligation for the Agency to reimburse Bidders for any expenses incurred for attending the mandatory pre-bid meeting, walk-through and the preparation of a bid response. The Agency will receive sealed Bids for the purchase and delivery of three (3) partial discharge online monitoring systems and all necessary auxiliary equipment for the interconnection with the current equipment set up and installation. The new partial discharge online monitoring system will replace the existing inoperative and obsolete online partial discharge online monitoring. The existing partial discharge online monitoring systems were installed at the Middle Fork Powerhouse Unit 1 in 1998, Unit 2 in 2003 and at the Ralston Powerhouse Unit in 2007 when the generators were rewound. The new systems procured through this contract shall replace these existing systems. Each one of the new systems shall include coupler capacitors of sufficient quantity to result is a fully functioning system, replacing the existing six (6) epoxy mica couplers capacitors. The existing one (1) flux sensor and one (1) synch sensor installed inside each generator windings shall remain but will be repurposed to interface with the generating unit’s new vibration monitoring systems. The vibration monitoring systems and its associated sensors are not included in this contract. The new partial discharge online monitoring system shall include all ancillary hardware for installation and provide miscellaneous wiring from new equipment to terminal blocks in theexisting setup for customer connection to the powerhouse Supervisory Control and Data Acquisition (SCADA) system. The equipment should include detailed installation instructions for Agency personnel to complete the demolition of the existing equipment and in support the Vendor’s installation of all new equipment. The Bids shall provide up to ten (10) days of a Vendor representative to be on-site to perform and support the installation, commissioning, startup, site acceptance and field testing of the new partial discharge online monitoring system. The bid shall include a training session for Agency Operators and Maintenance personnel in the operation and maintenance of the partial discharge online monitoring system. Agency standard working hours during the installation, which will be performed during the month of October 2026 during the annual maintenance outage, are a 60-hour work week from 0600 – 1630 Monday thru Saturday. Additional overtime will be approved on an as-needed basis. The new partial discharge online monitoring system shall be supplied by a 120 Vac – 60 Hz source. Each partial discharge online monitoring system shall be able to store data and provide a user interface through a Windows or webpage application to update settings file and download data. The partial discharge online monitoring system shall communicate through industrial protocols. Additional retrofit modifications are likely necessary to the bus bar and wiring needed to complete the work. See Section 6.0 – 6.9 Specifications of this bid for specific requirements. All Bids shall meet the provisions, requirements and specifications listed in this Bid Contract Document, #P-25-07. All Bids must be submitted on Agency bid forms in accordance with the Bid Contract Documents. The Bid Contract Documents may be obtained from the Public Purchase website at http://www.publicpurchase.com/gems/pcwa,ca/buyer/public/home. Registration is required. No Bid received and read may be withdrawn for a period of sixty (60) calendar days after the date fixed for opening of Bids. The Agency intends to award the contract within thirty (30) calendar days of Bid opening. The Agency reserves the right to award the contract, to reject any and all Bids, to waive informalities, and to reject non-conforming, non-responsive or conditional Bids. Bidder’s attention is called to the fact that the Placer County Water Agency is a public agency formed and existing under the laws of the State of California. The successful Bidder will be required to satisfy all current legal requirements applicable to this work. /s/ Todd Deacon Procurement and Risk Manager September 22, 2025

More opportunities from California → Placer County Water Agency

Same awarding agency

NAICS: 237990
SLED
On-Call Canal Gunite Installation
Solicitation # 2026-07
Solicitation 2026-07 is an on-call contract issued by the Placer County Water Agency for the installation of canal gunite throughout Placer County, specifically within Zones 1 and 3. The scope of work requires the contractor to provide all labor, materials, equipment, and services to furnish, mix, and place gunite using a dry-mix process in accordance with ASTM C33 standards. The contract has an estimated maximum value of 2,000,000 dollars and a performance period running through December 31, 2027, with a sole option for the agency to extend the term through December 2028. Payment is based on the cubic yardage of gunite measured in place, with undisputed progress payments issued within 30 days of receipt. The contract will be awarded to the lowest responsive and responsible bidder. To qualify, bidders must provide evidence of a valid California Contractor's License and DIR registration, as well as a record of integrity and successful project completion. Mandatory experience requirements include listing three to six qualifying dry-mix process gunite projects completed since 2020, at least two of which must be public works projects contracted directly with a public entity. Bidders must also submit a non-collusion affidavit, a drug-free workplace certification, and compliance documentation for the California Air Resources Board. Successful awardees are required to provide faithful performance and payment bonds, each for 100 percent of the contract price. The project is subject to prevailing wage requirements per California Senate Bill 854 and must comply with the Americans with Disabilities Act. Bids must be submitted in sealed envelopes to the Placer County Water Agency Engineering Division in Auburn, California, by 3:30 P.M. local time on November 5, 2026.
Other Heavy and Civil Engineering Construction

POSTED

26 days ago

DEADLINE

in about 5 hours
View Details
NAICS: 237990
SLED
Indian Bar River Access Project (Lake and Streambed Alteration Agreement EPIMS Notification No. PLA-18568-R2)
Solicitation # PLA-65968-R2
The California Department of Fish and Wildlife has executed Lake Alteration Agreement EPIMS Notification Number PLA-64574-R2, pursuant to section 1602 of the Fish and Game Code, for the Indian Bar River Access Project. Located at Hell Hole Reservoir in Placer County, California, the project is managed by the Placer County Water Agency and project proponent Ben Ransom. The scope of work is limited to replacing the existing concrete boat ramp using a similar alignment and constructing a new concrete extension approximately 262 feet long and 20 feet wide. This extension will reach an elevation of 4,505 feet, which is 25 vertical feet lower than the current ramp bottom elevation of 4,530 feet. To ensure environmental protection and regulatory compliance, all construction activities must be performed in dry conditions when water surface elevations are at or below 4,500 feet. The project has undergone review under the California Environmental Quality Act, and the California Department of Fish and Wildlife has determined that the work will not have significant environmental effects within its jurisdiction. Approval was granted contingent upon the adoption of specific mitigation measures and a monitoring plan to ensure environmental safeguards are maintained throughout the project's execution.
Other Heavy and Civil Engineering Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS