Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Purchase Swage Tooling

Closed
101-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333514
DIBBS
Supply of Diesel Engine Generator Repair KitThe contract pertains to the procurement, packaging, and delivery of a military-specification diesel generator repair kit designated by NSN 6115016287993 and part number A045Y128, intended for use at Prince Hassan Air Base in Jordan. The work is to be completed under FOB destination terms, meaning the supplier assumes responsibility for all costs and risks until the goods arrive at the specified destination. The contract is classified as a subcontract under the NAICS code 333514, which relates to the manufacture of industrial and commercial machinery and equipment. It is issued by the Defense Logistics Agency on behalf of the Department of Defense, reflecting its alignment with U.S. military supply chain requirements. The solicitation was posted on June 26, 2026, and is associated with contract number SPE7LX21D0007 and delivery order SPE7L126FAP2H. There is no set-aside designation, indicating the contract is open to all qualified vendors without preference for small businesses or other categories. The packaging and delivery must meet exacting military standards to ensure operational readiness, and all components must comply with the technical specifications of the NSN. Failure to deliver the kit in full and on time could impact critical power systems at the air base, making timely and precise execution essential. The point of contact and specific location details are not provided, but the delivery destination is clearly established as Prince Hassan Air Base, Jordan.
Defense Logistics Agency

POSTED

5 months ago

DEADLINE

N/A

AI Contract Overview

Show more

Lincoln Electric System is soliciting formal bids under solicitation number 101-26 for the purchase and delivery of a complete swage tooling system. The required equipment includes a battery-powered hydraulic pump compatible with Milwaukee M18 batteries, a 10-foot hydraulic hose with swivel and quick-disconnect fittings, head assemblies with removable dies for specific connectors, an inspection gauge, and carrying cases for all components. The tooling must be capable of performing uniform 360-degree compressions and must meet or exceed national standards including ANSI, NEMA, IEEE, and ASTM. The procurement is managed by the LES Procurement Department, with a bid due date of August 27, 2026, at 2:00 PM CT. All submissions must be uploaded as a single PDF or ZIP file via the LES Online Procurement System. Delivery is required FOB Lincoln, Nebraska, to the LES Operations Center. Payment terms are set at Net30. All inquiries must be submitted through the clarifications tab of the bid portal. Final acceptance of the equipment is contingent upon successful testing and verification of compliance with LES specifications at the destination.

General Info

Lincoln Electric System seeks bids for swage tooling by August 27, 2026.

Documents

3
DOCX, High priority: read this firstbidder-signature-page
High
DOCX, High priority: read this firstinstructions-to-bidders
High
PDF, High priority: read this firstspecifications
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Cold Patch and Specialized Patching Material SupplyOpen now, due in 36 days
  • Actuator Fitting Installation Tool Assembly, Swashplate Fitting Fixture, & Aerial Recover Sling for AH-1Z & UH-1Y AircraftOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Lincoln Electric System
Contacts1 person available
OfficeNE, USA
Office AddressNE, USA
Contacts
All questions must be submitted through this bid portal under the "Clarifications" tabLES Procurement Department

Full Description

Show more
Return to Bid List Bid NUMBER 101-26 TITLE Purchase Swage Tooling PROCESS Two Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 15 days: 2 hours: 52 minutes: 56 seconds DESCRIPTION BID DOCUMENTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.

More opportunities from Nebraska → Lincoln Electric System

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS