PW - 103497-2 Marine Creek Sanitary Sewer Parallel Interceptor M-279 & M-245B - Part II

Active
26-0332State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fort Worth is soliciting bids for the Marine Creek Sanitary Sewer Parallel Interceptor M-279 and M-245B Part II project, identified as Project No. 103497-2. The scope of work is divided into two primary units focusing on critical utility infrastructure. Unit I involves sanitary sewer improvements, including the installation of approximately 3,960 linear feet of 48 to 72-inch pipe via open cut, 570 linear feet of 72-inch pipe using open-shield pipejacking, and 2,430 linear feet of pipe within steel casing or tunnel liner plates. This unit also requires the construction of two siphon structures, two junction structures, and the implementation of bypass pumping for existing lines. Unit II covers water improvements, featuring the installation of approximately 2,200 linear feet of 36-inch pipe and 4,330 linear feet of 6 to 12-inch pipe via open cut, 280 linear feet of 36-inch pipe via non-open cut methods, and 425 linear feet of 24-inch AWWA C200 steel pipe on an existing bridge, along with cathodic protection for 24 to 36-inch pipes. The contract will be awarded to the lowest responsive and responsible bidder, with an engineer's estimate ranging between 45 million and 47 million dollars. Bids must be submitted electronically via the Bonfire Procurement Portal by November 5, 2026. Mandatory submission requirements include a bid bond for five percent of the maximum bid price, a Conflict of Interest Statement, and a Small Business Utilization Form to comply with City Ordinance No. 27832-08-25. The project mandates strict quality standards, including CCTV inspections for water mains 24 inches and larger, hydrostatic and bacteriological testing, and adherence to specific trench safety and grouting specifications. Performance, payment, and maintenance bonds are required upon award, and a preference is given to Texas resident bidders in accordance with state law.

General Info

Fort Worth solicits bids for sewer and water infrastructure improvements by November 5, 2026.

Documents

5

00 41 00 Bid Proposal Workbook - Marine Creek Sanitary Sewer Parallel Interceptor

XLSX, High priority: read this first13 pages · bid-form
High

00 45 42 Small Business Utilization Form

XLSX, High priority: read this first8 pages · small-business-utilization-form
High

Bid Proposal Workbook - Addendum No. 1 (Marine Creek Sanitary Sewer)

XLSX, High priority: read this first13 pages · amendment
High

City of Fort Worth - Marine Creek Sanitary Sewer Parallel Interceptor M-279 & M-245B - Addendum No. 1

PDF, High priority: read this firstamendment
High

Invitation to Bidders - Marine Creek Sanitary Sewer Parallel Interceptor M-279 & M-245B – Part II

DOCX, High priority: read this first3 pages · itb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 29, 2026 to Nov 5, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Interested Companies (3)

McKee Utility Contractors
Belt Construction of Texas
Mountain Cascade of Texas

Full Description

Show more
Unit I: Sanitary Sewer Improvements 1. Installation of approximately 3,960 LF of 48-inch thru 72-inch sanitary sewer pipe by open cut with all associated appurtenances and required testing. 2. Installation of approximately 570 LF of 72-inch sanitary sewer pipe with 90-inch steel casing pipe by other than open cut (Open-Shield Pipejacking) with all associated appurtenances and required testing. 3. Installation of approximately 2,430 LF of 48-inch thru 72-inch sanitary sewer pipe by other than open cut within 60-inch thru 90-icnh steel casing pipe or 60-inch thru 100-inch tunnel liner plate with all associated appurtenances and required testing. 4. Installation of approximately 1,470 LF of 6-inch thru 18-inch sanitary sewer pipe by open cut with all associated appurtenances and required testing. 5. Bypass Pumping of existing sanitary sewer lines. 6. Construction of (2) sanitary sewer siphon structures 7. Construction of (2) sanitary sewer junction structures
Unit II: Water Improvements 1. Installation of approximately 2,200 LF of 36-inch water pipe by open cut with all associated appurtenances and required testing. 2. Installation of approximately 280 LF of 36-inch water pipe with 48-inch steel casing pipe or 50-inch tunnel liner plate by other than open cut with all associated appurtenances and required testing. 3. Installation of approximately 425 LF of 24-inch AWWA C200 Steel water pipe on existing bridge with all associated appurtenances and required testing. 4. Installation of approximately 4,330 LF of 6-inch thru 12-inch water pipe by open cut with all associated appurtenances and required testing. 5. Cathodic Protection of 24-inch thru 36-inch water pipe with all associated appurtenances and required testing.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 23 hours
View Details

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 238150
New
SLED
Meacham Airport Glazing Replacement CPN: 107016
Solicitation # 27-0020
The City of Fort Worth is soliciting competitive sealed proposals for the Meacham Airport Glazing Replacement project, located at 201 American Concourse, Fort Worth, Texas. The scope of work involves the renovation of the terminal building envelope, specifically the removal and replacement of all glazing, gaskets, sealants, and accessories from existing exterior aluminum storefront frames, curtain wall frames, and aluminum framed entrances. The estimated construction cost is approximately 2,705,670.00 dollars, and the project includes three optional alternates: the installation of new manual roller shades for the City of Fort Worth Aviation suite, similar shades for other tenant spaces, and the repainting of lobby gypsum board walls. Proposals must be submitted via the Bonfire portal by 2:00 PM on December 10, 2026. A pre-proposal conference is scheduled for November 12, 2026, and the deadline for inquiries is November 19, 2026. The City will select a contractor based on a best value evaluation, weighing references and experience (25 points) and previous work performed within the City of Fort Worth (5 points). A small business utilization goal of 30 percent is required, and proposers must submit a Small Business Utilization Plan to be considered responsive. Financial and legal requirements include a bid bond or cashier's check for 5 percent of the proposal amount, with payment and performance bonds required upon award for contracts exceeding 25,000 dollars. Proposers must also provide contractors general liability insurance and statutory workers compensation coverage. Proposals must include a separate 7.5 percent owner's contingency allowance, which remains under the sole control of the City. Technical compliance requires adherence to AAMA 501.2-25 testing standards for water penetration and strict adherence to manufacturer packaging and storage guidelines. Contractors are also required to pay prevailing wage rates and provide safety metrics, including OSHA TRIR and LTIR/EMR for the past three years.
Glass and Glazing Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS