This Solicitation opportunity from Texas was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Fort Worth is soliciting bids for PW 2022 Bond Year 3 Contract 13, City Project No. 104311, focusing on public works improvements on Kipling Street East. The scope of work includes the installation of approximately 4,000 linear feet of 8-inch water pipe and 5,500 linear feet of 8-inch sewer pipe, along with 9,000 square yards of pulverization and asphalt overlay, 20,800 square yards of concrete pavement, 30,000 square feet of concrete sidewalk, and 33,000 square feet of concrete driveways. Key deliverables include the management of traffic control in accordance with the Texas Manual of Uniform Traffic Control Devices and the adjustment of meter boxes.
The contract is governed by specific administrative and safety requirements, including the submission of trench safety plans, confined space entry standards, and payroll certifications. Bidders must provide a bid bond and certify worker's compensation insurance coverage for all employees and subcontractors per Texas Labor Code. Award decisions will be based on the contractor's qualifications and competencies. All submissions must be uploaded electronically via the Bonfire Procurement Portal by the deadline of November 12, 2026, and must include a comprehensive set of documents including a conflict of interest statement, prequalification statement, and a small business utilization form.
General Info
Fort Worth seeks bids for water, sewer, and road improvements on Kipling Street.
HighAI Summary for 2022 Bond Year 3 Contract 13 - Final Construction Plans: Final construction plans for the City of Fort Worth, Texas, Transportation & Public Works Department (Project #104311), dated August 2026. The document includes a detailed sheet index covering water, sewer, paving, and drainage improvements across multiple streets, including N/S Hampshire Blvd, Yeager St, and Milam St.
PDF
PDF, High priority: read this first5 pages · amendment
HighAI Summary for City of Fort Worth - 2022 Bond Year 3 Contract 13 - Addendum 1: Addendum No. 1 issued September 24, 2026, for City Project No. 104311. The primary purpose is to extend the bid opening date from October 1, 2026, to October 15, 2026, at 2:00 P.M. It includes a revised Invitation to Bidders and outlines general work including water/sewer pipe installation and concrete pavement/sidewalk work.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City of Fort Worth 2022 Bond Year 3 Contract 13 - Addendum 3: Addendum No. 3 for City Project No. 104311 (2022 Bond Year 3 – Contract 13), issued October 30, 2026. This document modifies the original specifications and contract documents, specifically replacing the Invitation to Bidders (Section 00-11-13) to extend the bid opening date from October 1, 2026, to November 12, 2026, at 2:00 P.M. CST. It includes a receipt acknowledgement form and updated electronic submission instructions via the Bonfire Procurement Portal.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City of Fort Worth 2022 Bond Year 3 - Contract 13 - Addendum 4: Issued November 5, 2026, for City Project No. 104311. This addendum modifies the original specifications and contract documents, including revisions to the Table of Contents, Proposal Form, Small Business Utilization Form, and various construction plan sheets. It also provides responses to 14 pre-bid conference questions regarding bid items, project scheduling, and technical specifications.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for City of Fort Worth - Bidders Prequalifications (Section 00 45 11): Revised August 13, 2021, this document outlines the mandatory prequalification requirements for bidders and subcontractors seeking to perform construction and maintenance work for the City of Fort Worth. It specifies the necessary documentation for submission, including audited financial statements, organizational documents, and a completed application, and defines the criteria for determining bidding capacity and eligibility for contract award.
XLSX
XLSX, High priority: read this first13 pages · amendment
HighAI Summary for City of Fort Worth - Bid Proposal Workbook - Addendum 4: An addendum to a bid proposal workbook for City of Fort Worth Project No. 104311 (2022 Bond Year 3 Contract 13). The document includes a Conflict of Interest Statement (Section 00 35 13) and a Bid Form (Section 00 41 00) covering water, sewer, paving, and stormwater units, including bidder certifications and prequalification requirements.
XLSX
XLSX, High priority: read this first13 pages · bid-form
HighAI Summary for City of Fort Worth - Bid Proposal Workbook (Project 104311): A bid proposal workbook for the City of Fort Worth, 2022 Bond Year 3 Contract 13 (Project No. 104311). The document includes a Conflict of Interest Statement (Section 00 35 13) and a formal Bid Form (Section 00 41 00) covering units for Water, Sewer, Paving, and Stormwater. It contains bidder certifications regarding non-collusion, insurance, and prequalification requirements.
PDF
PDF, High priority: read this first5 pages · amendment
HighAI Summary for City of Fort Worth Project 104311 - Addendum No. 2: Addendum No. 2 issued October 8, 2026, for City Project No. 104311 (2022 Bond Year 3 – Contract 13). This document modifies the original bid opening date to November 5, 2026, at 2:00 P.M. and replaces the Invitation to Bidders. It includes a receipt acknowledgement form and a general description of work involving water/sewer pipe installation and concrete pavement/sidewalk construction.
XLSX
XLSX, High priority: read this first7 pages · other
HighAI Summary for Small Business Utilization Form - 2022 Bond Year 3 Contract 13: A Small Business Utilization Form for the City of Fort Worth, Project 104311 (2022 Bond Year 3 Contract 13). The document requires prime bidders to list all subcontractors and suppliers, identify certified small businesses, and commit to meeting the City's small business goals.
DOCX
DOCX, High priority: read this first5 pages · submission-instructions
HighAI Summary for Submission Instructions - 26-0308: Submission instructions for procurement 26-0308 (rev. 100826) for the City of Fort Worth. The document details the required submission materials, including bid forms, bonds, and bid tables for excavation and road construction services. It specifies a submission deadline of November 05, 2026, at 2:00 PM CST via the Bonfire portal.
DOCX
DOCX, High priority: read this first5 pages · submission-instructions
HighAI Summary for Submission Instructions - 26-0308: Detailed submission instructions for project 26-0308 (rev. 110526) for the City of Fort Worth. The document specifies required files including bid forms, proposal forms, bid bonds, and specific BidTables for base and alternate units. It outlines the use of the Bonfire portal, lists relevant NIGP commodity codes for excavation and concrete services, and sets a submission deadline of November 12, 2026.
PDF
PDF, Low priority1 page · checklist
LowAI Summary for City of Fort Worth Bid Documents Package Folder Contents Checklist: A checklist from the City of Fort Worth (Rev. 6/17/2019) used to verify the inclusion of necessary documents in a bid package, such as the Invitation to Bidders, Bid Proposal Workbook, and technical specifications.
LowAI Summary for CPN 104311 Pre-Bid Meeting Sign in Sheet: Attendance record for the pre-bid meeting held on September 14, 2026, regarding the 2022 Bond Year 3 Contract 13 (CPN 104311) for Water, Sewer and Paving Improvements. The document lists attendees from TPW and various contracting firms.
PDF
PDF, Low priorityprequalification
LowAI Summary for Section 00 45 13 Prequalification Application: A prequalification application form for contractors seeking to qualify for work with the City of Fort Worth. The document collects business classification, financial information, and experience across various major work categories, including Water Department services (boring, tunneling, water/sewer distribution) and Transportation Public Works (asphalt and concrete paving, lighting).
PDF
PDF, Low priority1 page · contract-document
LowAI Summary for Section 00 45 26 Contractor Compliance with Worker's Compensation Law: A certification form for City Project No. 104311 requiring the contractor to certify compliance with Texas Labor Code Section 406.096 regarding worker's compensation insurance for themselves and their subcontractors.
The major work will consist of the (approximate) following:
*4,000 LF - 8” Water Pipe*
*5,500 LF - 8” Sewer Pipe*
*9,000 SY - Pulverization and asphalt overlay*
*20,800 SY – Concrete pavement*
*30,000 SF – Concrete sidewalk*
*33,000 SF – Concrete driveway*
More opportunities from Texas → City Of Fort Worth
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.