This Solicitation opportunity from Texas was posted on August 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PW 2022 Bond Year 3 Contract 17, City Project No. 104323
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
City Project No. 104323, titled PW 2022 Bond Year 3 Contract 17, is a solicitation issued by the City of Fort Worth, Texas, for comprehensive infrastructure improvements. The scope of work is divided into four primary units: water improvements involving 7,600 linear feet of PVC pipe and asphalt pavement; sewer improvements including 3,500 linear feet of sewer pipe and 26 manholes; paving improvements consisting of 17,500 square yards of concrete pavement, concrete driveways, and sidewalks; and stormwater improvements featuring curb inlets and reinforced concrete pipe. An alternate option for paving is also provided, which replaces concrete with 15,500 square yards of pavement pulverization and asphalt. Bids must be submitted electronically via the Bonfire Procurement Portal by September 4, 2025, at 2:00 PM CDT. The award will be based on the lowest price, qualifications, and competencies. Prospective bidders are required to undergo a mandatory prequalification process, providing audited financial statements, organizational documents, and five references of related work. Additionally, contractors must certify compliance with Texas Labor Code Section 406.096 regarding worker's compensation insurance. Technical specifications require adherence to City of Fort Worth Water Department and Transportation and Public Works standards, with final acceptance occurring at the project sites upon completion.
General Info
Contract Value
$8,428,697.5Place of Performance
Set-Aside
Awardee
Stabile & Winn, Inc.Award Issued Date
Documents
11AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 2 days
- North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 17 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Apr 22, 2025 to Sep 4, 2025. The notice title changed. NAICS code changed from 339950 to 237310. The notice description changed.
Contract was awarded
Organization & Contact Information
Interested Companies (2)
Full Description
**Unit 1: Water Improvements** 7,000 LF - 8” PVC Water Pipe 600 LF – 12” PVC Water Pipe 6,500 SY – 11” Pavement Pulverization 6,500 SY – 3” Asphalt Pavement Type D
**Unit 2: Sewer Improvements** 3,000 LF – 8” Sewer Pipe 500 LF – 10” DIP Sewer Pipe 26 EA – 4’ Manhole
**Unit 3: Paving Improvements** 17,500 SY – 6” Concrete Pavement 800 SY – 3” Asphalt Type D 18,000 SF – 6” Concrete Driveway 30,000 SF – 4” Concrete Sidewalk
**Unit 3: Paving Improvements (Alternate A)** 15,500 SY – 11” Pavement Pulverization 15,500 SY – 3” Asphalt Pavement Type D
**Unit 4: Stormwater Improvements** 2 EA – 10’ Curb Inlet 30 LF – 18” RCP, Class III 20 LF – 24” RCP, Class III 20 LF – 30” RCP, Class III
More opportunities from Texas → City Of Fort Worth
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
