Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW Exposition Way Slope Stabilization Project, City Project No. 105816

Closed
26-0292State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 8 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Exposition Way Slope Stabilization Project, City Project No. 105816, is a municipal construction effort managed by the City of Fort Worth, Texas. The scope of work focuses on site stabilization and infrastructure restoration from Heritage Trace Parkway to Sam Bass Trail. Key deliverables include the stabilization of 992 square yards of slope, installation of 1,363 linear feet of type 8 pipe subdrain, and the removal and replacement of 8,550 square yards of seven-inch concrete pavement. Additionally, the project involves 135 linear feet of stacked stone wall grout repair and 30 linear feet of masonry stone wall replacement. The estimated contract value is 190,000 dollars, which includes a 150,000 dollar construction allowance and a 5,000 dollar illumination electrical repair allowance. Bids for solicitation 26-0292 are due by 2:00 PM CST on September 17, 2026, via the Bonfire Procurement Portal. The award process is implied to follow a lowest price technically acceptable approach. Successful contractors must provide a bid bond, a conflict of interest statement, and certification of compliance with Texas worker's compensation laws. The project also emphasizes small business utilization, requiring certified documentation from approved agencies for any small business participants. Once the contract time commences, the work must be completed for final acceptance within 180 days. Performance is governed by specific technical standards for flexible base, concrete mow strips, and pavement marking.

General Info

Fort Worth slope stabilization and infrastructure project valued at $190,000, bidding due September 2026.

Documents

13

00 45 42 Small Business Utilization Form

XLSX, High priority: read this first7 pages · small-business-utilization-form
High

City Project No. 105816 - Addendum No. 1

XLSX, High priority: read this first9 pages · amendment
High

CPN 105816 Exposition Way Slope Stabilization Project Manual 100% Design

PDF, High priority: read this first320 pages · contract-document
High

Exposition Way Slope Stabilization Project - 100% Plans

PDF, High priority: read this firstsow
High

Exposition Way Slope Stabilization Project Bid Form and Conflict of Interest Statement

XLSX, High priority: read this first10 pages · bid-form
High

Invitation to Bidders - Exposition Way Slope Stabilization Project

DOCX, High priority: read this first2 pages · itb
High

Project No. 105816 - Exposition Way Slope Stabilization Project - Addendum No. 1

PDF, High priority: read this firstamendment
High

Submission Instructions - 26-0292

DOCX, High priority: read this first5 pages · submission-instructions
High

Submission Instructions for Suppliers - Solicitation 26-0292

DOCX, High priority: read this first5 pages · submission-instructions
High

00 45 26 Contractor Compliance with Workers Compensation Law

DOC, Low priority1 page · contractor-compliance
Low

City of Fort Worth Bid Documents Package Folder Contents Checklist

DOC, Low priority1 page · other
Low

CPN105816 Exposition Way Slope Stabilization Pre-Bid Conference

PPTX, Low priority8 pages · industry-day
Low

CPN 105816 Pre-Bid Meeting Sign-in Sheet

XLSX, Low priority2 pages · industry-day
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Interested Companies (5)

Stabile & Winn
No data available in table
HQS ConstructionPlano, TX

See All 5 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The major work will consist of the (approximate) following: • 992 SY Slope Stabilization • 1363 LF 6” Pipe Subdrain, Type 8 • 8550 SY 7” Concrete Pavement Removal and Replacement • 135 LF Stacked Stone Wall Grout Repair • 30 LF Stacked Masonry Stone Wall Removal and Replacement (4’ to 8’ Height)

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 238150
New
SLED
Meacham Airport Glazing Replacement CPN: 107016
Solicitation # 27-0020
The City of Fort Worth is soliciting competitive sealed proposals for the Meacham Airport Glazing Replacement project, located at 201 American Concourse, Fort Worth, Texas. The scope of work involves the renovation of the terminal building envelope, specifically the removal and replacement of all glazing, gaskets, sealants, and accessories from existing exterior aluminum storefront frames, curtain wall frames, and aluminum framed entrances. The estimated construction cost is approximately 2,705,670.00 dollars, and the project includes three optional alternates: the installation of new manual roller shades for the City of Fort Worth Aviation suite, similar shades for other tenant spaces, and the repainting of lobby gypsum board walls. Proposals must be submitted via the Bonfire portal by 2:00 PM on December 10, 2026. A pre-proposal conference is scheduled for November 12, 2026, and the deadline for inquiries is November 19, 2026. The City will select a contractor based on a best value evaluation, weighing references and experience (25 points) and previous work performed within the City of Fort Worth (5 points). A small business utilization goal of 30 percent is required, and proposers must submit a Small Business Utilization Plan to be considered responsive. Financial and legal requirements include a bid bond or cashier's check for 5 percent of the proposal amount, with payment and performance bonds required upon award for contracts exceeding 25,000 dollars. Proposers must also provide contractors general liability insurance and statutory workers compensation coverage. Proposals must include a separate 7.5 percent owner's contingency allowance, which remains under the sole control of the City. Technical compliance requires adherence to AAMA 501.2-25 testing standards for water penetration and strict adherence to manufacturer packaging and storage guidelines. Contractors are also required to pay prevailing wage rates and provide safety metrics, including OSHA TRIR and LTIR/EMR for the past three years.
Glass and Glazing Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS