Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on October 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW - RFP Group 2025A

Closed
26-0014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 12 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Engineering and Traffic Surveys Supporting the Town's Speed Limits to Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 13 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Fort Worth Water Department is seeking qualified engineering consulting firms through a comprehensive solicitation process to support multiple infrastructure projects aimed at enhancing water and sewer systems within the city. The primary focus includes a Request for Proposals (RFP) for the West Fork Influent Pump Station project, which involves preliminary and final design, hydraulic modeling, site evaluation, permit acquisition, and construction support for a new lift station capable of handling 220 MGD, with future expansion to 400 MGD. This project aims to resolve hydraulic surcharging and grit accumulation issues, ensuring efficient flow management at the Village Creek Water Reclamation Facility. Additionally, an open list of qualified firms is being established via a Request for Qualifications (RFQ) to undertake various water and sanitary sewer extension, rehabilitation, and relocation projects. These projects encompass design work for replacing and rehabilitating mains, managing traffic control, stormwater pollution prevention, and preparing detailed contract documents, with an emphasis on proven project management capabilities and relevant experience. The scope of work also includes technical evaluations such as influent flow management studies and hydraulic analyses to optimize grit removal processes at the wastewater treatment facilities. Supporting documents detail the technical and procedural aspects of these projects, including process flow diagrams and memoranda on influent flow projections, which inform the design basis for infrastructure improvements. The contracts are valued between 5 million and 15 million dollars, with the selection process emphasizing technical expertise, project approach, and the ability to coordinate effectively with city staff and regulatory agencies. The overall initiative aims to improve the reliability, capacity, and environmental compliance of Fort Worth’s water and sewer systems through strategic planning, innovative design, and efficient project execution.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

16

Central Laboratory Expansion (Addendum #1) - Fort Worth Water Department

PDF, High priority: read this firstamendment
High

Fort Worth Water Department RFP Group 2025A Presentation

PDF, High priority: read this firstindustry-day
High

Fort Worth Water Department RFQ - Water and Sanitary Sewer Projects (Open List)

PDF, High priority: read this firstrfq
High

RFP Group 2025A Addendum #1

PDF, High priority: read this firstamendment
High

RFP Group 2025A Addendum #2

PDF, High priority: read this firstamendment
High

RFP Group 2025A Cover Letter

PDF, High priority: read this firstrfp
High

RFP Group 2025A Cover Letter Draft - City of Fort Worth Water Department

PDF, High priority: read this firstrfp
High

RFP West Fork Influent Lift Station (Addendum #2)

PDF, High priority: read this firstamendment
High

RFP West Fork Influent Lift Station City Project 106329

PDF, High priority: read this first4 pages · rfp
High

RFQ Water and Sanitary Sewer Projects (Open List)

PDF, High priority: read this first1 page · rfq
High

Rolling Hills WTP Centralized Testing Laboratory - Finish Schedule

PDF, High priority: read this firstspecifications
High

TM#1: Influent Flow Management - Village Creek WRF Grit Removal

PDF, High priority: read this firsttechnical-memorandum
High

VCWRF South Flow Pump Station - Process Flow Diagram (G-8)

PDF, High priority: read this first1 page · specifications
High

FWWD RFP Group 2025A Engineering Briefing Attendee List (Addendum #2)

PDF, Low priorityamendment
Low

TM#1 Influent Flow Management for Village Creek WRF Grit Removal

PDF, Low priority88 pages · other
Low

VCWRF South Flow Pump Station - Process Flow Diagram Sheet G-8

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Oct 15, 2025 to Nov 21, 2025. The notice title changed. NAICS code changed from 423860 to 561320. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
The City of Fort Worth Water Department (FWWD) is requesting qualifications from interested and qualified engineering consulting firms (or other qualified firms) to perform engineering, design, permitting and professional services necessary for the following projects: RFP - West Fork Influent Pump Station RFQ - Water & Sewer Extensions/Rehabilitations/Relocations/Replacements (Open List)

More opportunities from Texas → City of Fort Worth

Same awarding agency

NAICS: 238150
New
SLED
Meacham Airport Glazing Replacement CPN: 107016
Solicitation # 27-0020
The City of Fort Worth is soliciting competitive sealed proposals for the Meacham Airport Glazing Replacement project, located at 201 American Concourse, Fort Worth, Texas. The scope of work involves the renovation of the terminal building envelope, specifically the removal and replacement of all glazing, gaskets, sealants, and accessories from existing exterior aluminum storefront frames, curtain wall frames, and aluminum framed entrances. The estimated construction cost is approximately 2,705,670.00 dollars, and the project includes three optional alternates: the installation of new manual roller shades for the City of Fort Worth Aviation suite, similar shades for other tenant spaces, and the repainting of lobby gypsum board walls. Proposals must be submitted via the Bonfire portal by 2:00 PM on December 10, 2026. A pre-proposal conference is scheduled for November 12, 2026, and the deadline for inquiries is November 19, 2026. The City will select a contractor based on a best value evaluation, weighing references and experience (25 points) and previous work performed within the City of Fort Worth (5 points). A small business utilization goal of 30 percent is required, and proposers must submit a Small Business Utilization Plan to be considered responsive. Financial and legal requirements include a bid bond or cashier's check for 5 percent of the proposal amount, with payment and performance bonds required upon award for contracts exceeding 25,000 dollars. Proposers must also provide contractors general liability insurance and statutory workers compensation coverage. Proposals must include a separate 7.5 percent owner's contingency allowance, which remains under the sole control of the City. Technical compliance requires adherence to AAMA 501.2-25 testing standards for water penetration and strict adherence to manufacturer packaging and storage guidelines. Contractors are also required to pay prevailing wage rates and provide safety metrics, including OSHA TRIR and LTIR/EMR for the past three years.
Glass and Glazing Contractors

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS