Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW - RFP Group 2026B

Closed
26-0255State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Fort Worth Water Department is soliciting qualified engineering consulting firms to provide comprehensive engineering, design, permitting, and professional services for the replacement of the aging SGO switchgear building at the Rolling Hills Water Treatment Plant. The project involves designing a new 50’x33’x20’ facility to house critical switchgear, with the ultimate goal of decommissioning and demolishing the existing SG1 building and relocating its equipment. The scope includes preliminary and final design development, electrical system analysis, civil site design, construction administration, shop drawing reviews, and support during equipment procurement and construction bidding. The contract requires full compliance with applicable local and industry standards for public utility infrastructure, with deliverables including a Preliminary Design Report, Final Design Report, construction plans and specifications, and record drawings. The entire project must be completed within nine months of contract award. Proposals must be submitted electronically via the City’s Bonfire Procurement Portal by 2:00 PM on August 6, 2026, and are limited to ten pages excluding appendices, with resumes permitted as supplemental material up to two pages per individual. Only written addenda issued through the portal are binding, and late submissions will be rejected without exception. Evaluation will consider understanding of the project scope, proposed approach, team qualifications with resumes, relevant project experience including at least five similar projects within the past decade, and project schedule—though no weighting or scoring methodology is specified, suggesting a potential trade-off evaluation rather than lowest-price selection. All firms must submit a Conflict of Interest Disclosure Form to the Fort Worth City Secretary within seven days of proposal submission, as mandated by Texas Local Government Code Chapter 176, with failure to comply being a Class C misdemeanor. No Small Business Enterprise or Minority Business Enterprise goals are set, and neither UEI/CAGE code nor socioeconomic certifications are required. The City reserves the right to request additional resources to accelerate the timeline. All performance occurs at the facility located at 2500 Southeast Loop 820, Fort Worth, TX, and the primary point of contact for inquiries is Suzanne Abbe, P.E.

General Info

Fort Worth seeks engineering firm to design and replace SGO switchgear building within nine months.

Agency

Texas → City Of Fort WorthView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(13)

Addendum 1 for RFP Group 2026B - RHWTP SGO Building and Switchgear Replacement

PDFamendment

RFP Rolling Hills WTP Switchgear Building SGO Replacement

PDFrfp

RFP Group 2026B Addendum 2.pdf

PDF

2.2 Figure 1-2 Main Power Distribution One Line Diagram for Switchgear Building SGO.pdf

PDF

1.0 2026B RFP - RHWTP SGO Replacement Cover Letter.pdf

PDF

2.2 Figure 1-2 Main Power Distribution One Line Diagram for Switchgear Building SGO.pdf

PDF

2.0 RFP - Rolling Hills WTP Switchgear Building SGO Replacment Final.pdf

PDF

2.3 Figure 1-3 Main Power Distribution One Line Diagram for Switchgear Building SG1.pdf

PDF

2.1 Figure 1-1 Site Plan.pdf

PDF

RFP Group 2026B - Rolling Hills Water Treatment Plant SGO Replacement

PDFrfp

1.1 2026B RFP - RHWTP SGO Addendum 1.pdf

PDF

Figure 1-1 Site Plan

PDFspecifications

2.3 Figure 1-3 Main Power Distribution One Line Diagram for Switchgear Building SG1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / Agency
Texas → City Of Fort Worth
View Agency Profile
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
The City of Fort Worth Water Department (FWWD) is requesting qualifications from interested and qualified engineering consulting firms (or other qualified firms) to perform engineering, design, permitting and professional services necessary for the following project:
RFP - Rolling Hills Water Treatment Plan SGO Building and Switchgear Replacement

More opportunities from Texas → City Of Fort Worth

Same awarding agency