PWSA ABC Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Mascaro Construction Company, L.P. is preparing to bid on the PWSA ABC Project, with a solicitation deadline of February 12, 2025. The project involves comprehensive construction work across three adjacent sites, including the rehabilitation and replacement of equipment at the Aspinwall Pump Station, the construction of a new Bruecken Pump Station, and the development of a new Clearwell Bypass. The scope encompasses process-mechanical, structural, architectural, civil, and site work, along with associated piping and appurtenances. Specifically, the Aspinwall Pump Station upgrade involves installing four new horizontal split case pumps, demolishing existing fluoride and orthophosphate systems, and constructing a new chemical building to house treatment systems, all while maintaining continuous chemical injection. The project also includes converting part of the existing facility into office space. The new Bruecken Pump Station will feature a three-story structure with six vertical turbine pumps, large-diameter piping, and related infrastructure, replacing the existing garage. The Clearwell Bypass construction entails building large bypass conduits, overflow structures, vaults, and connecting to existing gatehouses, ensuring seamless integration with the current water system. The contract, valued between five and fifteen million dollars, is managed by the Urban Redevelopment Authority of Pennsylvania, with Gretchen Mummert serving as the primary contact. The project’s complexity involves multiple phases, coordination of demolition and construction activities, and adherence to strict operational and safety standards. The detailed scope and technical requirements highlight the project's significance in upgrading and expanding critical water infrastructure in the region.
General Info
Place of Performance
PA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work includes work at three (3) adjacent locations: - The "rehabilitation and replacement" of equipment in the Aspinwall Pump Station - Construction of a "new" Bruecken Pump Station. - Construction of the "new" Clearwell Bypass
Project Description: The scope of work generally includes construction to rehabilitate the Aspinwall Pump Station, construction of the Clearwell Bypass, and construction of the new Bruecken Pump Station and all phases of process-mechanical, structural, architectural, civil and site work, site piping, and all associated work not specifically assigned to another contract. The rehabilitation of the Aspinwall Pump Station includes, but is not limited to, installing four new horizonal split case pumps in generally the same location as the existing pumps, demolition of the existing fluoride building, garage, and orthophosphate system, construction of the new chemical building which would house the new orthophosphate and fluoride treatment system, stormwater system improvements with its associated yard piping system, and all associated piping and appurtenances associated with the work to rehab the Aspinwall Pump Station. The pumps would be replaced sequentially to maximize the station’s available capacity during construction. The demolition of the existing orthophosphate and fluoride system will be executed in such a sequence without any outage of the chemicals injection to the filtered water. The improvement work of the Aspinwall Pump Station also includes converting the trade shop area to two-story open office space. The construction of the new Clearwell Bypass includes, but is not limited to, construction of a 144-inch bypass and an 84-inch bypass along the south embankment of the existing Clearwell, construction of an overflow structure and three bypass vaults, construction of connections to the existing inlet and outlet gatehouse, and all ancillary work associated with the construction of the Clearwell Bypass. The construction of the new Bruecken Pump Station includes, but is not limited to, demolition of the existing garage, construction of the new three-story pump station which would house six new vertical turbine pumping units with an integral wet well, construction of new orthophosphate building, construction of large diameter piping, valves, vaults, and all ancillary work associated with the construction of the new pump station.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS