Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Quality Control and Coating Inspection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Jurupa Community Services DistrictView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Eastvale, CA, 92880, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260721005.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Harada Heritage Park Basin Fence Repainting

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Jurupa Community Services District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Jurupa Community Services District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Independent quality assurance including adhesion testing, film thickness measurement, defect identification, and mockup review for painted fencing.

Similar Contracts

Same NAICS industry code

More opportunities from California → Jurupa Community Services District

Same awarding agency

NAICS: 237110
SLED
Jurupa Valley High School Well Bypass Project
Solicitation # C265150
The Jurupa Valley High School Well Bypass Project involves the complete demolition, installation, and commissioning of water and sewer infrastructure to support a bypass system, including approximately 50 linear feet of new 6-inch PVC C-909 water main and 140 linear feet of new 4-inch PVC SDR-35 sewer main. The scope encompasses the installation of a water meter, chlorine analyzer, flow meter, reduced pressure backflow device, swing check valve, gate valves, and an enclosure structure, along with connections to existing utility mains. All work requires trenching, bedding, backfilling, compaction, paving, surface restoration, electrical integration, and instrumentation setup, with strict adherence to ASTM, AWWA, NSF 60/61, and California Title 22 standards. Materials must be new, meet manufacturer specifications, and be properly marked with manufacturer name, material type, class, and wall thickness; HDPE pipe and gaskets require specific storage conditions to prevent damage, UV degradation, and corrosion, with steel fittings needing sacrificial zinc anode caps. Work must comply with the District’s approved material list and most stringent requirement when conflicts arise. The project is being procured under a Lowest Price Technically Acceptable (LPTA) basis by the Jurupa Community Services District in California, with bids due by 9:00 p.m. on August 13, 2026. All proposals must be submitted as a single PDF file via the PlanetBids portal, excluding email or fax submissions. Contractors must have a valid Department of Industrial Relations (DIR) registration, submit a bid bond if exceeding $150,000, and provide certifications confirming non-collusion and compliance with the Iran Contracting Act. The Contractor is required to complete all work within 100 calendar days after the Notice to Proceed and maintain a field superintendent on-site at all times, along with a 24-hour emergency contact. Certified payrolls, as-built drawings, and material certifications must accompany payment requests submitted electronically through the CIPO system. Inspections are solely conducted by the District, with failure to allow access or corrective non-compliant work at the Contractor’s expense resulting in rejection. Special requirements include potholing existing utilities, phasing and temporary bypass planning, protection of adjacent utilities and structures, and compliance with state storm water permits, with violations considered material breaches of contract. No UEI, CAGE code, size certification, or socioeconomic status is
Water and Sewer Line and Related Structures Construction

POSTED

19 days ago

DEADLINE

in 2 days
View Details