Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Quality Inspection and Compliance Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Florida → PurchasingView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 25/26-099.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Continuing Services for Sidewalk, Driveway & Concrete Improvements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Purchasing
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Purchasing
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Third-party inspection of concrete pours, formwork, curing, and ADA compliance. May include material testing (slump, compressive strength).

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details
NAICS: 541330
New
Federal
C1DA--A/E Services Renovate Outpatient Clinics to PACT Project Number: 662-25-105
Solicitation # 36C26126R0065_1
The Department of Veterans Affairs San Francisco Healthcare System is seeking Architectural and Engineering firms for Project 662-25-105 to renovate 13,750 square feet of existing outpatient space in Building 203 Ground Floor A-Wing into a modern Hemodialysis Clinic, Women's Clinic, and updated police and specialty care areas. This project, with an estimated construction cost of 15.7 million dollars, requires a comprehensive design effort including a two-day on-site charrette, site investigations, and full design deliverables at 35, 65, 95, 100, and final production stages. The design period is 400 days, followed by five years of construction period services including RFI responses, submittal reviews, and site inspections. The award will be a single firm-fixed price contract set aside for Service-Disabled Veteran-Owned Small Businesses. Qualified firms must provide a multi-disciplinary team covering architectural, civil, structural, HVAC, plumbing, electrical, fire protection, geotechnical, landscaping, and signage services. Selection is based on a descending order of precedence focusing on past healthcare design experience, technical competence in active healthcare environments with California seismic requirements, workload capacity, and local knowledge of San Francisco architectural and environmental standards. The prime firm must be able to be on-site within a four-hour window. Submissions must be made via SF 330, not exceeding 80 pages, and include the VAAR 852.219-77 Certificate of Compliance. All proposals are due to Alex Arter by 12:00 PM PST on September 7, 2026.
261-NETWORK Contract Office 21 (36C261)

POSTED

about 15 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Florida → Purchasing

Same awarding agency

NAICS: 541330
SLED
CDBG-DR HS019 Construction-Alger Rd Bridge Replacement and Jefferson Ave Pipe Culvert Rehab
Solicitation # PD 25-26.084
This solicitation, identified as PD 25-26.084 and Commerce Agreement HS019, provides for construction engineering, inspection, and project management services for the Alger Rd bridge replacement and the Jefferson Ave Culvert Rehabilitation projects in Florida. Funded through the Community Development Block Grant Disaster Recovery (CDBG-DR) program following Hurricane Sally, the project aims to address long-term recovery needs. The selected consultant will be granted authority similar to Escambia County in administering the construction contracts, though the County retains final decision-making power. The total project cost ceiling is estimated at 10,015,000 dollars, with a federal funding commitment of 2,862,137 dollars. The period of performance extends through June 30, 2027. The scope of work includes site preparation, demolition, foundation construction, stormwater management, utility relocation, and final paving, adhering to FDOT and ASTM technical standards. Administrative requirements include electronic invoicing via the Commerce Subrecipient Enterprise Resource Application (SERA) system and compliance with 2 CFR 200 cost principles. Key regulatory mandates include the Contract Work Hours and Safety Standards Act, requiring a 40-hour workweek and overtime pay, as well as Section 3 and Fair Housing regulations. Award decisions will be based on a trade-off of price, quality, and technical expertise. All proposals must be submitted electronically through the Escambia County e-procurement portal by the September 14, 2026, deadline.
Engineering Services

POSTED

7 days ago

DEADLINE

in 24 days
View Details