Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Quartz Hill Water District Production Well #18

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Quartz Hill Water District Production Well 18 project involves the construction of a new groundwater well and a water line of approximately 100 feet located in Lancaster, California. The project is designed to improve water quality and ensure regulatory compliance with the Division of Drinking Water by blending the new source with two existing wells. The scope of work includes site preparation, mobilization of drilling equipment, and the installation of well casings and screened intervals based on site-specific hydrogeologic conditions. The water line will be installed within the existing road right of way to connect the new well to the existing district infrastructure. To minimize environmental and community impact, the project will utilize standard best management practices, including the installation of portable sound walls around drilling equipment to reduce noise transmission to nearby residential and office buildings. The project is located at APN 3110-040-909 and is classified as a forecast under NAICS code 237110. It has been granted a Notice of Exemption under CEQA because the work occurs within previously disturbed areas and the pipeline is less than one mile in length. The primary objective is to provide water to the community that meets current drinking water standards and alleviates public health issues.

General Info

Quartz Hill Water District will construct Production Well 18 and pipeline in Lancaster.

Agency

California → Quartz Hill Water District

Place of Performance

East side 40th Street West, North of Avenue L, Lancaster, CA, 93536

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Quartz Hill Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Quartz Hill Water District
Office AddressN/A
Contacts
Brach SmithAssistant General Manager

Full Description

Show more
The proposed project involves construction of a groundwater well and water line which will connect to existing QHWD infrastructure. The proposed water line will be approximately 100 feet long and will be constructed in the existing road right of way. The well will be constructed on a previously graded residential lot. Work will include site preparation, mobilization of drilling equipment, drilling, and installation of well casings and screened intervals at depths appropriate to site-specific hydrogeologic conditions. Portable sound walls will be installed around drilling equipment to reduce noise transmission toward nearby residential areas and office buildings across the street. The purpose of the project is to improve water quality and achieve Division of Drinking Water regulatory compliance by blending with two existing wells. There are no long-term safety concerns associated with the proposed action. Temporary construction-related effects will be minimized through standard best management practices.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is governed by EJCDC standard general and supplementary conditions. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide bid security equal to 5 percent of their maximum bid price and are required to furnish performance and payment bonds upon award. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the owner. Quality assurance is maintained through rigorous inspection standards, including compliance with AWS, SMACNA, NEMA, and ASTM specifications.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS