Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Quartz Hill Water District Production Well #18

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Quartz Hill Water District is forecasting the construction of Production Well 18 and a corresponding 100 foot water line in Lancaster, California. The project involves drilling and installing well casings and screened intervals on a previously graded residential lot, with the new line connecting to existing infrastructure within the road right of way. The primary objective is to enhance water quality and ensure compliance with Division of Drinking Water regulations by blending the new source with two existing wells. Operational activities include site preparation and the mobilization of drilling equipment, utilizing portable sound walls to mitigate noise impact on surrounding residential and office areas. While no long term safety concerns are anticipated, the district will employ standard best management practices to minimize temporary construction effects. Inquiries regarding this project are directed to Assistant General Manager Brach Smith.

General Info

Quartz Hill Water District will construct Production Well 18 and pipeline in Lancaster.

Agency

California → Quartz Hill Water District

NAICS

N/A

Place of Performance

East side 40th Street West, North of Avenue L, Lancaster, CA, 93536

Set-Aside

NONE

Documents

(1)

site 18 NOE appendix E signed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Quartz Hill Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Quartz Hill Water District
Office AddressN/A
Contacts
Brach SmithAssistant General Manager

Full Description

Show more
The proposed project involves construction of a groundwater well and water line which will connect to existing QHWD infrastructure. The proposed water line will be approximately 100 feet long and will be constructed in the existing road right of way. The well will be constructed on a previously graded residential lot. Work will include site preparation, mobilization of drilling equipment, drilling, and installation of well casings and screened intervals at depths appropriate to site-specific hydrogeologic conditions. Portable sound walls will be installed around drilling equipment to reduce noise transmission toward nearby residential areas and office buildings across the street. The purpose of the project is to improve water quality and achieve Division of Drinking Water regulatory compliance by blending with two existing wells. There are no long-term safety concerns associated with the proposed action. Temporary construction-related effects will be minimized through standard best management practices.