Quinley Avenue Bridge Replacement Project

Forecast
EPIMS-MER-57015-R4State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Quinley Avenue Bridge Replacement Project, identified by Lake and Streambed Alteration Agreement EPIMS-MER-57015-R4, is an infrastructure initiative led by the Merced County Department of Public Works. Located at the Quinley Avenue crossing of Black Rascal Creek in Atwater, California, the project involves the demolition of the existing bridge and the construction of a new three-span structure. The new bridge superstructure will be 5.5 feet wider and 16 feet longer than the original, while remaining within the same footprint to improve overall safety and operations. Additional scope of work includes grading and the installation of rock slope protection. The project was approved by the California Department of Fish and Wildlife on August 15, 2025, pursuant to Fish and Game Code section 1602. This approval was granted based on a Negative Declaration indicating no significant environmental effects within the agency's jurisdiction, provided that specific mitigation measures and a Mitigation Reporting or Monitoring Plan are implemented. The project is classified under NAICS code 237310, and primary coordination is managed through the Merced County Planning Division and the California Department of Fish and Wildlife.

General Info

Replace Quinley Avenue Bridge with wider, longer structure; environmental compliance under CDFW oversight.

Agency

California → Merced County

Place of Performance

Quinley Ave, Atwater, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Merced County
Contacts2 people available
OfficeN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS-MER-57015-R4, pursuant to Fish and Game Code section 1602, to the project Applicant, Merced County Department of Public Works. The Project involves activities related to the demolition of the existing Quinley Avenue Bridge over Black Rascal Creek and replacement with a three-span bridge structure to provide improved safety and operations. The new bridge superstructure will be 5.5 feet wider and 16 feet longer the existing bridge and be constructed within the same footprint as the existing bridge. Project activities also include grading and installation of rock slope protection.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS