Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

R-2025-002

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Cupertino is processing a residential design review permit application under project number R-2025-002 for the construction of a new 2,736 square foot two-story single-family residence located at 21858 Almaden Ave., Cupertino, CA 95014. The project includes a second-story side yard setback of less than 15 feet, which triggers the need for design review under local land use regulations. The application relies on a categorical exemption under the California Environmental Quality Act (CEQA) Section 15303 for minor residential construction, and a Notice of Exemption has been filed with the County Clerk’s Office in San Jose, with a required 30-day posting period prior to construction. The submission deadline for the environmental documentation was December 18, 2025, and the exemption notice is valid through January 17, 2026. The applicant, Tracy Hsu, is responsible for ensuring compliance with all local zoning and building standards, and the City of Cupertino’s Planning Division, represented by Senior Planner Emi Sugiyama, serves as the lead agency overseeing approval and environmental compliance. There is no indication this is a federal procurement contract; no Federal Acquisition Regulation (FAR) clauses, contracting officer details, payment or accounting data, evaluation factors, or solicitation terms appear in the documentation. The process is administrative and regulatory in nature, focused on environmental review and local design approvals rather than competitive bidding or contract award. There are no associated contract values, pricing structures, delivery schedules, or technical specifications related to goods or services beyond the permit itself. The required documents consist of a two-page environmental filing package, a certified exemption finding, and proof of NOE filing, all submitted on paper to the County Clerk. While contact information is provided for the applicant and planner, there are no formal roles designated for contract administration such as COR, COTR, or PCO. The project is governed solely by state environmental law and municipal code, with no federal contractual obligations, socioeconomic certifications, or procurement clauses applicable.

General Info

Cupertino approves 2,736 sq ft single-family home with design review and CEQA exemption.

Agency

California → City of Cupertino

NAICS

541340 - Drafting ServicesView NAICS

Place of Performance

Almaden Ave. & Orange Ave., Cupertino, CA, 95014

Set-Aside

NONE

Documents

(2)

R-2025-002 CEQA Filing Cover Sheet

PDFceqa-filing

R-2025-002 CEQA Notice of Exemption Filing

PDFceqa-noe

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Cupertino
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Cupertino
Office AddressN/A

Full Description

Show more
Residential Design Review Permit for a new 2,736 sq. ft. two-story, single-family residence with a second story side yard setback of less than 15 feet.

Similar Contracts

Same NAICS industry code

NAICS: 541340
New
SLED
Structural and Seismic Analysis for Water InfrastructureThe contract titled Structural and Seismic Analysis for Water Infrastructure requires the performance of comprehensive structural and seismic evaluations of water tanks, pump stations, and other essential water infrastructure assets located in San Diego. The work is aimed at ensuring full compliance with applicable safety standards and building codes, with a focus on identifying vulnerabilities and recommending necessary upgrades or remediations to maintain operational integrity under seismic events. This subcontract is open to qualified firms capable of delivering technical expertise in structural engineering and seismic analysis specific to water utility systems. The solicitation was posted on July 30, 2026, with a firm deadline for responses set for August 31, 2026. The North American Industry Classification System code for this contract is 541340, indicating it falls under engineering services. The performing location is explicitly designated as San Diego, and the awarding agency is San Diego County within the state of California. Interested parties must submit proposals through the provided external portal, as no point of contact or set-aside information is specified. The contract does not indicate any specific demographic or small business preferences, and all submissions must demonstrate technical capability to meet the performance requirements outlined.
San Diego County

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541340
New
SLED
RFP for Progressive Design Building Consultation & Facilitation Services
Solicitation # A&E-RFP/RFQ-2027-0128
The State of Montana has issued a solicitation for Progressive Design Building Consultation & Facilitation Services under RFP number StateOfMontana-A&E-RFP/RFQ-2027-0128, posted on July 30, 2026, with responses due by August 13, 2026. This procurement seeks qualified consultants to provide expert guidance and facilitation throughout the design and planning phases of state-owned building projects, focusing on collaborative, progressive design methodologies that enhance efficiency, stakeholder engagement, and project outcomes. The work is expected to support public infrastructure initiatives across the state, with performance location details to be determined based on project needs and vendor capabilities. All proposals must be submitted electronically via the designated portal at https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=StateOfMontana by the deadline. Bob Warfle is the primary point of contact, reachable at rwarfle@mt.gov, for inquiries regarding the solicitation. This is a solicitation under the State, Local, and Education (SLED) category with no set-aside specifications indicated, and it is open to all eligible firms capable of delivering the required services. No NAICS code is provided, and no specific physical location for performance has been designated, allowing flexibility in project assignment based on consultant selection and project scope.
Montana

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 541340
New
DIBBS
Quality Assurance and Compliance DocumentationThe contract pertains to the preparation and submission of Certificate of Quality Compliance and all associated inspection, test, and traceability records necessary to ensure adherence to stringent quality standards. This is a subcontract under a Total Small Business Set-Aside, specifically designated for small businesses as defined by the SBA, with the NAICS code 541340 indicating services related to engineering services. The requirement is tied to the Nuclear Reactor Program within the Department of Defense, and performance is to be executed at the specified location in New Cumberland, Pennsylvania, with a zip code of 17070-5002. All deliverables must meet compliance criteria defined by federal procurement regulations and the program's technical specifications, ensuring full traceability and documentation integrity for nuclear-related components or systems. The solicitation was posted on July 30, 2026, and responses are due by August 8, 2026, leaving a narrow window for qualified small businesses to submit proposals. The contract does not include a designated point of contact, and the place of performance is limited to a specific geographic location, implying that on-site presence or direct coordination with the designated facility may be required. This effort is critical to maintaining the integrity of quality assurance processes within a sensitive defense and nuclear operations context, where any failure in documentation or traceability could impact program safety, accountability, and regulatory compliance. Bidders must demonstrate proven capability in generating and certifying high-compliance documentation in regulated environments, particularly those involving defense or nuclear systems.
NUCLEAR REACTOR PROGRAM

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 541340
New
DIBBS
Inspection and Quality Assurance (Destination-Based)The contract requires comprehensive pre-shipment inspection and quality assurance services conducted in strict accordance with MIL-STD-1916, using acceptance quality levels of 0.1 for critical defects, 1.0 for major defects, and 4.0 for minor defects. All inspections must be completed prior to shipment, with final acceptance explicitly tied to government evaluation at the destination, meaning compliance is not confirmed until the goods reach their designated location. This destination-based acceptance imposes a high level of accountability on the contractor to ensure products meet the most stringent quality thresholds before transport, as any non-conformance discovered upon arrival could lead to rejection or corrective action at the contractor’s expense. The contract is a subcontract under the NAICS code 541340, issued by the Fluid Handling Division within the Department of Defense, with performance required in Tracy, California, at the zip code 95304-5000. The solicitation was posted on July 30, 2026, with responses due by August 10, 2026, indicating a narrow nine-day window for submission. The nature of the work emphasizes rigorous quality control aligned with military standards, demanding precision in sampling, documentation, and defect classification throughout the inspection process. Government oversight at the final destination reinforces a results-driven compliance model, where the contractor bears full responsibility for meeting performance standards without pre-arrival approval.
FLUID HANDLING DIVISION

POSTED

2 days ago

DEADLINE

in 9 days
View Details