R--Contracting Consultant for CRLA 198641

Awarded
140P2024F0069Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Yucca Trail Widening Project – Palomar Avenue To La Contenta Road
Solicitation # 7074
The Town of Yucca Valley is soliciting professional civil engineering design services for the Yucca Trail Widening Project, located between Palomar/Avalon Avenue and La Contenta Road in Yucca Valley, California. The selected contractor will be responsible for creating a comprehensive Plans, Specifications, and Engineer's Estimates package, which includes street improvement, signing, striping, and streetlight plans, as well as final cost estimates and record drawings. The scope requires the consultant to evaluate the project for safety, constructability, utility conflicts, right-of-way constraints, and ADA compliance, utilizing the latest version of AutoCAD and adhering to the Standard Specifications for Public Works Construction and Town driveway standards. The agreement is for an initial term of two years, with a possible two-year extension upon mutual consent. Proposals must be submitted in two separate sealed envelopes by December 3, 2026, with the technical proposal limited to ten pages. Evaluation criteria include the service approach, company qualifications, past performance, proximity of the contractor's office, and the ability to commence work immediately. Compensation will be negotiated after the contractor is selected, and the Town aims to process undisputed monthly invoices within forty-five days. While the contractor must provide worker's compensation and indemnity insurance, it is noted that California prevailing wage laws do not apply to this specific agreement.
Town of Yucca Valley

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study under solicitation C265256. The primary objective of this firm-fixed price contract is to evaluate existing, planned, and potential managed lane facilities in Orange County to identify segments most ready to advance into the Project Initiation Document phase. The study is estimated to take 18 months and is divided into four key tasks: project management and coordination, segment inventory and priority selection, priority segment advancement assessment, and the delivery of a final study report with supporting technical files. Proposals are evaluated on a points-based system focusing on the work plan (30 percent), firm qualifications (25 percent), price (25 percent), and staffing and project organization (20 percent). The selected consultant must adhere to strict safety and industry standards, including Cal/OSHA and ANSI Z-87.1, and is required to maintain comprehensive insurance coverage. Administrative requirements include monthly invoicing with a 10 percent retention fee, a 30-day payment term, and the submission of weekly certified payroll where applicable. The contract emphasizes the avoidance of organizational conflicts of interest and requires compliance with California state and federal managed lanes policies.
Orange County Transportation Authority

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Engineering And Traffic Surveys Supporting The Town's Speed Limits To Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 8 hours ago

DEADLINE

in 29 days
NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 17 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

CO

Set-Aside

NONE

Documents

1

A16_JOFOC_Under_SAT__GSA_REQD-signed_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Justification (J&A)

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA

Full Description

Show more
Perform a forensic critical path method (CPM) schedule delay analysis to identify and measure the project delays using the projects contemporaneously submitted project schedule and available project documentation, make a determination of the parties responsible for delaying each of the critical path work items, development of a detailed narrative report that consists of a detailed explanation of the documents reviewed, the forensic schedule delay analysis method used, and the findings that will identify the project delay caused by each party from July 2021 to Present.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS