Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Réfection après sinistre du logement 512 des Habitations Albert I et II,

Closed
20126807International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236118
New
Federal
Kitchen RenovationThe U.S. Embassy in Paris is soliciting bids for the renovation of a single kitchen within a U.S. government building located at 2 Avenue Gabriel, Paris, under solicitation number 19FR6326Q0097. The contract will be awarded on a lowest price technically acceptable basis to a responsible contractor who submits a responsive offer by the August 20, 2026 deadline. All offers must be submitted electronically via email to ParisContracting@state.gov and require prior registration in the System for Award Management (SAM), including submission of the UEI number. The contract will be fixed price, with performance to commence within 15 working days of the Notice to Proceed and must be completed within 45 working days thereafter. Work must comply with French and U.S. standards, including NF DTU 60.1 for plumbing, EM 385-1-1 for safety, and the French Labor Code, while also adhering to specific contractual clauses covering whistleblower rights, trafficking in persons, subcontractor debarment, and labor dispute notification. The scope includes demolition, installation of kitchen furniture and appliances, plumbing and electrical rough-ins, tiling, ventilation systems, and final cleanup, with deliverables requiring submission of a bar chart schedule, health and safety plan compliant with French PPSP requirements, a subcontracting plan, proof of insurance, and CONSUEL certification for electrical work. Subcontractors must meet the same compliance obligations, and all personnel on-site must have authorization under U.S. Department of State policies. A bilingual English-French supervisor must be present at all times, and a security clearance process mandates submission of worker identification details within ten days of award. Proposals must be structured into four volumes covering standard forms, pricing breakdowns, performance schedules, and technical and administrative documentation including product data sheets, quality assurance plans, and evidence of past performance. Contract execution is subject to the Government’s right to terminate for convenience, inspection under FAR 52.246-12 and 52.246-21, reporting of nonconforming items, and warranty coverage for construction. Invoicing must be emailed to ParisFMCDBO1@state.gov, with no electronic invoicing systems like WAWF or IPP used. Compliance with foreign labor, tax, licensing, and environmental regulations is mandatory, and offers must demonstrate capability to meet all specifications in Attachment 1 and drawings in Attachment 2, with no deviations permitted without prior
US Embassy Paris

POSTED

2 days ago

DEADLINE

in 25 days
NAICS: 236118
New
SLED
General Contracting / Construction ManagementThe contract entails the full-scale construction of a three-unit residential condominium in Hermosa Beach, California, with the contractor responsible for comprehensive project oversight including trade coordination, scheduling, permitting, and strict adherence to all applicable building codes and regulations. This is a subcontract under the City of Hermosa Beach, requiring diligent management of all phases from groundbreaking to final completion, ensuring alignment with local ordinances and industry-standard practices in a high-compliance environment. The project is classified under NAICS code 236118 for residential construction and is scheduled to take place in zip code 90254, with all deliverables expected to meet the city’s structural, safety, and zoning requirements. The work demands precise coordination among multiple trades, timely acquisition of permits, and continuous communication with local authorities to maintain regulatory compliance. While the contract does not specify a funding source or set-aside designation, it underscores the need for a qualified contractor with proven experience in residential condominium developments within the Hermosa Beach jurisdiction. The project’s success hinges on adherence to a strict timeline, quality control measures, and seamless integration of architectural and engineering specifications, all while operating within the constraints of a densely populated coastal community with elevated environmental and aesthetic standards.
City of Hermosa Beach

POSTED

3 days ago

DEADLINE

N/A
NAICS: 236118
New
SLED
Urban County Live Well San Diego Home Repair ProgramThe Urban County Live Well San Diego Home Repair Program provides financial assistance in the form of loans to low-income homeowners in unincorporated San Diego County and included cities such as Coronado, Del Mar, Imperial Beach, Lemon Grove, Poway, and Solana Beach to make critical health and safety repairs, ADA and accessibility modifications, and aging-in-place improvements. Eligible repairs include replacing single-pane windows with double-pane, repairing or replacing roofs, doors, walls, flooring, appliances, and fixtures, abating lead-based paint or asbestos, leveling mobile homes, and installing ADA-compliant ramps or repairing hazardous steps. Homeowners may receive up to $25,000 for single-family homes and $20,000 for mobile homes, with a total of $6 million allocated over five years beginning July 2026 to support approximately 225 units. Flood insurance is required for repairs in FEMA Special Flood Hazard Areas, but homeowners may still qualify for up to $5,000 in assistance without proof of insurance. The program operates under a categorical exemption under CEQA Section 15301 and complies with 24 CFR Part 58 for federal environmental review, with NEPA clearance extended through July 2031. The County of San Diego’s Housing and Community Development Services administers the program and is responsible for oversight, eligibility determination, and compliance with all regulatory requirements. No competitive procurement process exists; awards are determined solely by homeowner eligibility, property location, and alignment with approved repair categories, with no formal evaluation factors, scoring, or contract line items. All work occurs at the homeowner’s residence, and acceptance is managed administratively by the County. Public correspondence and documentation are handled through designated county offices, with no standard contract clauses, invoicing systems, or procurement forms applicable due to the program’s nature as a financial assistance initiative rather than a traditional government contract.
San Diego County

POSTED

3 days ago

DEADLINE

N/A
NAICS: 236118
New
SLED
Noise Insulation Program (NIP), Expanded Eligibility Initiative (EEI) Phase 2024, Group 1The Noise Insulation Program, Expanded Eligibility Initiative 2024 Phase, Group 1 Project aims to reduce aircraft noise exposure for up to seven residential properties in San Bruno and South San Francisco by implementing comprehensive acoustical treatments. Each eligible home will receive improvements such as window and door replacement, installation of new HVAC systems with required electrical upgrades, additional insulation, sheetrock repair or installation, finish carpentry, and painting to enhance soundproofing and overall living comfort. The initiative is part of a broader effort to address noise pollution from nearby airport operations and improve quality of life for residents in affected neighborhoods. This solicitation, identified by number 11939.61, was posted on July 23, 2026, with a response deadline of August 20, 2026. It is administered by the California Department of Design and Construction’s Procurement and Contracts Section, with the primary point of contact being the OpenGov Project Manager, reachable via phone or email for project inquiries. Brian Davidson serves as the Contract Manager and can be contacted for contractual matters. The contract is categorized under state and local government procurement, with performance located entirely within California. All work must be completed in compliance with the specified scope to ensure effective noise mitigation for participating households.
Design and Construction - Procurement and Contracts Section

POSTED

3 days ago

DEADLINE

in 25 days
NAICS: 236118
New
Federal
Residential Bathroom Renovation and Drainage UpgradesThe U.S. Embassy in Canberra is seeking a contractor to perform a comprehensive renovation of a government-owned residential property, focusing on the rehabilitation of bathroom, toilet, and powder room areas, along with associated drainage and plumbing systems. The objective is to address existing deficiencies, replace end-of-life components, and bring the wet areas up to current safety, functionality, and building standards without altering the dwelling’s structural layout or overall configuration, except where necessary to accommodate new services or fixtures. Work includes the replacement of deteriorated finishes, fixtures, and infrastructure, as well as upgrades to sub-surface drainage and slab elements affected by prior failures, aiming to improve water tightness, drainage efficiency, durability, and usability. Compliance with both Australian Standards and the National Construction Code is mandatory, as is adherence to the more stringent of local, host country, or U.S. government requirements. The project must include complete site cleanup, landscape restoration, submission of as-built documentation, warranties, and operation manuals, and strict adherence to asbestos handling protocols and dust control measures. The contract is solicited under solicitation number 19AS2026Q0025 with a response deadline of September 8, 2026, and is awarded on a Lowest Price Technically Acceptable basis to the lowest-priced, responsible offeror who meets all technical and compliance requirements. The estimated value ranges between $60,000 and $80,000 USD, with no itemized pricing structure provided. Performance must begin within 10 days of the notice to proceed and be completed within 75 calendar days. Contractors must ensure key personnel including an English-speaking supervisor are present on-site at all times, submit worker identification for U.S. government security screening within ten days of award, and comply with strict personnel identification and communication protocols to avoid organizational conflicts of interest. Contractor employees accessing DOS facilities must meet personal identification card issuance requirements, and telecommunications equipment from prohibited entities is strictly forbidden. All invoices must be submitted electronically to a designated email, clearly showing GST as a separate line item, and payments require electronic funds transfer. The contractor must maintain minimum $10 million in liability insurance with the U.S. government named as an additional insured and must indemnify the government against claims arising from performance, excluding cases of gross negligence. Proposals must be submitted electronically in PDF, Word, or Excel format, not exceeding 30MB total, and must include a completed SF-1442 form, a detailed pricing breakdown by specification divisions,
US Embassy Canberra

POSTED

3 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves a public tender issued by OMHM for the complete restoration of apartment 512, located on the 5th floor of the Habitations Albert I and II at 2355 rue Delisle, Montréal. This restoration is required following a fire that extensively damaged the unit, necessitating full reconstruction according to detailed plans and specifications, including adjoining partitions on the side of apartment 512 with the corridor and neighboring units. The building complex consists of six structures encompassing 213 units over 8 floors and serves a diverse population including families, couples, individuals, and seniors. The affected unit will remain unoccupied during the renovation period. Work is scheduled to commence immediately upon signing the engagement letter, although OMHM reserves the right to modify this start date without allowing the contractor to claim extra fees due to such changes. The entire reconstruction project must be completed within a maximum of 120 working days from the confirmed start date. The solicitation was posted in late March 2026, with a submission deadline set for early April 2026, and the contracting authority overseeing the project is Belahsen Touria from OMHM.

General Info

OMHM hires contractor to fully restore fire-damaged apartment 512 within 120 working days.

Agency

Government of Canada → OMH de Montréal

NAICS

236118 - Residential RemodelersView NAICS

Place of Performance

Montréal, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → OMH de Montréal
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → OMH de Montréal
Office AddressN/A
Contacts
Belahsen TouriaContracting Authority

Full Description

Show more
OBJET DU CONTRAT 1.1 L’OMHM procède à un appel d’offres public pour la réfection après sinistre du logement 512 des Habitations Albert I et II, situées au 2355, rue Delisle, Montréal (Québec) H3J 1K6, arrondissement Le Sud-Ouest. 1.2 Le projet consiste à réaliser tous les travaux conformément aux documents contractuels. Sans s’y limiter, la portée des travaux inclut la remise en état, à la suite d’un sinistre (incendie), de l’appartement 512 (5e étage). L’appartement ayant été complètement ravagé par les flammes, une reconstruction complète est requise conformément aux plans et devis, incluant les cloisons mitoyennes (uniquement du côté de l’appartement no 512) avec le corridor ainsi qu’avec les autres appartements. 1.3 Les travaux seront réalisés dans un immeuble faisant partie d’un lot de six bâtiments. Il comprend 213 logements répartis sur 8 étages et est destiné à une clientèle diversifiée : familles, couples, personnes seules et personnes âgées. 1.4 Durant les travaux, le logement sera vacant. 2. DURÉE DES TRAVAUX 2.1 Selon la planification actuelle, il est prévu que les travaux débuteront dès la signature de la lettre d’engagement, mais cette date pourrait être modifiée par l’OMHM. Dans tel cas, la modification ne pourra pas servir à justifier une demande d’extra de la part de l’adjudicataire. 2.2 Les travaux devront être exécutés dans un délai maximal de 120 jours ouvrables de la date confirmée du début des travaux dans la lettre d’engagement.