Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Réfection de l'avenue Bergeron et des rues McNicoll, Morin, Harvey et Dubois (phase 1)

Closed
20146298International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 010 B1CBA2602088-0
Solicitation # B1CBA2602088-0
Solicitation B1CBA2602088-0, issued by the Georgia Department of Transportation (GADOT), involves the widening and reconstruction of 0.284 miles of SR 124 (Braselton Hwy) at Hamilton Mill Road and Hamilton Mill Parkway in Gwinnett, Georgia. The project scope requires the contractor to provide all machinery, tools, and materials necessary to add an additional lane, with a scheduled completion date of July 31, 2028. Key deliverables include an ITS Project Management Plan, staging and temporary traffic control plans, and as-built plans. The work must adhere to the 2021 Standard Specifications and 2024 Supplemental Specifications, with specific technical requirements for micropiles, asphalt mix designs, and ITS hardware. The contract is subject to various federal and state regulations, including the Davis-Bacon Act for labor standards, the Buy America preference for steel and iron, and the Americans with Disabilities Act (ADA). Compliance with nondiscrimination and equal opportunity laws is mandatory, and contractors must certify they are not debarred or suspended via SAM.gov. While the required Disadvantaged Business Enterprise (DBE) goal is set at 0%, the contract maintains strict inspection and acceptance criteria, with final acceptance contingent upon the receipt and transfer of all warranties to GADOT. Proposals must be submitted using the Proposal Schedule of Items and remain valid for thirty calendar days following the opening date.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours
NAICS: 237310
New
SLED
Call 009 B1CBA2601755-0
Solicitation # B1CBA2601755-0
Solicitation B1CBA2601755-0, issued by the Georgia Department of Transportation (GDOT), is for a construction project in Fulton County involving 3.087 miles of milling and plant mix resurfacing on SR 70, extending from east of the Cedar Branch Creek bridge to east of SR 154. The scope of work includes traffic control, recycled asphalt concrete patching and superpave, tack coat application, asphalt pavement milling, and the installation of white and yellow wet weather thermoplastic traffic stripes and various raised pavement markers. The complete contract is scheduled for completion by July 31, 2027, with a bid opening date of August 21, 2026. The contract is subject to stringent federal and state regulations, including the Davis-Bacon Act for labor standards, 49 CFR Part 26 for Disadvantaged Business Enterprise (DBE) participation, and Title VI of the Civil Rights Act of 1964. Bidders must submit a Request For Eligibility To Bid by noon the day preceding the letting to be eligible. Award eligibility is based on bidder responsibility and responsiveness, with a requirement to submit supporting documentation within three working days following the bid opening. Compliance with these certifications and the submission of weekly certified payrolls are mandatory, as breaches of these stipulations may result in the withholding of progress or final payments.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 012 B1CBA2602578-0
Solicitation # B1CBA2602578-0
The Georgia Department of Transportation (GDOT) is soliciting proposals for project M006688, which involves 4.390 miles of milling, inlay, and plant mix resurfacing on SR 31, extending from the south end of the I-16/SR 404 bridge to SR 26 in Laurens County. The scope of work includes extensive pavement activities such as recycled asphalt concrete patching and Superpave application, as well as the installation of various thermoplastic and reflective pavement markings and raised markers. Additionally, the contract incorporates Intelligent Transportation Systems (ITS) specifications, requiring the delivery of NEMA TS 4 compliant LED display matrices, IP-based CCTV cameras, wireless communication systems, and mobile Environmental Sensor Stations (ESS). The contract is scheduled for completion by July 31, 2027, with a specific 60-calendar day timeframe associated with the completion of paving operations. Compliance with federal and state regulations is mandatory, including the Davis-Bacon Act, the Americans with Disabilities Act, and Georgia's E-Verify requirements. Quality standards are strictly enforced, requiring ISO 9001 or Six Sigma certification and third-party laboratory testing for ITS equipment. Acceptance is contingent upon a field test and a minimum 30-day burn-in period. Bidders must submit eligibility forms to the GDOT Office of Construction Bidding Administration by 12:00 p.m. the day preceding the August 21, 2026, letting date to avoid being rendered non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 005 B1CBA2602556-0
Solicitation # B1CBA2602556-0
The Georgia Department of Transportation is soliciting bids for the construction of a roundabout at the intersection of US 41/SR 247 and Anthony Road (CR 5104 and CR 5481) in Bibb County, with a contract completion deadline of March 31, 2029. The project involves comprehensive roadway construction including grading, base and pavement installation with recycled asphalt concrete, curb and gutter placement, storm drainage systems, sanitary sewer and force main modifications, temporary and permanent traffic control, and installation of various traffic control devices including thermoplastic striping and raised pavement markers. Advanced transportation systems are also part of the scope, requiring installation of ESS environmental and pavement sensors, a wireless communications network supporting PtP, PtMP, and repeater configurations, and a sliding gate system with EAG mechanical components. All materials must meet strict specifications, including delivery in labeled 50-pound containers, proper preservation and handling of reinforcement steel, and end-cap protection for cable ends. The project adheres to multiple regulatory standards, including USDA, ASTM, AWWA, ANSI, GDOT Utility Accommodation Policy, and Georgia EPD guidelines, with precise acceptance criteria for micropiles, ride quality, and bridge bearing elevations. Contract compliance is governed by federal and state requirements including Davis-Bacon prevailing wage regulations, Buy America mandates for all permanently installed materials, and strict non-discrimination provisions under Title VI of the Civil Rights Act, ADA, and equal employment opportunity laws. The contractor must submit a 5% proposal guaranty and a state-approved contract bond to ensure work completion and material quality. DBE participation requirements apply if a goal is set, necessitating submission of proposed DBE participants with the bid. Prompt payment clauses mandate that subcontractors be paid within ten calendar days of the prime contractor’s receipt of payment, and all bids must include certifications addressing debarment status, lobbying activity, boycott of Israel prohibitions under Georgia law, non-collusion, and sexual harassment prevention. Payment for materials is tied to e-Ticket documentation, and as-built plans, GPS coordinates, and an ITS Project Management Plan must be submitted within 30 days of installation completion. Bids must be submitted by August 21, 2026, to the Georgia DOT bidding office in Atlanta, and failure to satisfy any certification or regulatory requirement renders a bid non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

La Ville de Roberval lance un appel d’offres pour la réfection de l’avenue Bergeron ainsi que des rues McNicoll, Morin, Harvey et Dubois, dans le cadre de la phase 1 de ce projet. Les soumissions doivent être préparées exclusivement à l’aide des documents fournis par le Système électronique d’appel d’offres (SEAO), accessibles en ligne ou par téléphone, et doivent être déposées sous enveloppe scellée clairement marquée avec le numéro d’appel APP2026-001. La date limite de dépôt est fixée au 11 juin 2026 à 11 heures, heure officielle du Conseil national de recherches Canada, à l’adresse du service de l’approvisionnement de la Ville de Roberval. Les enveloppes seront ouvertes publiquement dès 11 h 01 du même jour. La Ville se réserve le droit de ne pas accepter toute soumission, même la plus avantageuse, et n’assume aucun frais ni obligation envers les soumissionnaires. Toute question doit être adressée à Mme Christina Martel, chef de l’approvisionnement et assistante-trésorière, par courriel uniquement. Le projet est classé sous le code NAICS 237310 et référencé sous le numéro 20146298 dans le système CanadaBuys, bien que l’organisme commanditaire soit une municipalité et non une entité fédérale.

General Info

Ville de Roberval seeks bids for avenue Bergeron and four street rehabilitations, deadline June 11, 2026.

Agency

Government of Canada → Ville de RobervalView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Saguenay-Lac-Saint-Jean, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Ville de Roberval
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Ville de Roberval
View Agency Profile
Office AddressN/A
Contacts
Martel ChristinaContracting Authority

Full Description

Show more
APPEL NUMÉRO : APP2026-001 PROJET : Réfection de l’avenue Bergeron et des rues McNicoll, Morin, Harvey et Dubois (phase 1) PROPRIÉTAIRE : VILLE DE ROBERVAL Téléphone : 418 275-0202 La Ville de Roberval désire recevoir des offres pour la réfection de l’avenue Bergeron et des rues McNicoll, Morin, Harvey et Dubois (phase 1). Ne seront considérés que les documents de soumission préparés par la Ville de Roberval et obtenus par le Système électronique d’appel d’offres (SEAO). Les documents de soumission sont disponibles au coût établi par le SEAO directement sur le site au https://seao.gouv.qc.caou en communiquant au numéro 1 877 336‑7326. Les soumissions sous enveloppes scellées portant la mention : « APP2026-001 – RÉFECTION DE L’AVENUE BERGERON ET DES RUES MCNICOLL, MORIN, HARVEY ET DUBOIS »doivent être déposées au plus tard à 11 h (heure officielle du Conseil national de recherches Canada correspondant à l’heure de référence pour la téléphonie cellulaire) le 11 JUIN 2026 à l’adresse suivante : VILLE DE ROBERVAL Service de l’approvisionnement 851, boulevard Saint-Joseph Roberval (Québec) G8H 2L6 Les enveloppes seront ouvertes publiquement à 11h01, à l’endroit et à la date indiqués ci‑dessus. La Ville de Roberval ne s’engage à accepter ni la plus basse, ni aucune des soumissions reçues, ni à encourir aucuns frais d’aucune sorte envers le ou les soumissionnaires. Information Toute demande d’information doit être exclusivement adressée à Mme Christina Martel, chef de l’approvisionnement et assistante-trésorière, par courriel à cmartel@roberval.ca. Christina Martel Chef de l’approvisionnement et assistante-trésorière