Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

R.M. Levy Water Treatment Plant Filter Rehabilitation Project (CIP25203)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The R.M. Levy Water Treatment Plant Filter Rehabilitation Project (CIP25203) is a forecast project for the Helix Water District located at 9550 Lake Jennings Park Road, Lakeside, California. The scope of work involves the demolition of the existing filter underdrain system and the installation of a new system comprising filter media, piping, and associated appurtenances. Additionally, the project includes concrete repairs and modifications to ancillary structures such as access manways. This effort is designed to maintain service reliability and prevent costly emergency repairs by replacing aging and failed underdrains without expanding the facility's capacity. Construction is anticipated to begin in Fall 2026 with a scheduled completion in 2028. The project is classified under NAICS code 237110 and has been filed with a Notice of Exemption under CEQA Class 1 and Class 2 for the maintenance and replacement of existing facilities. Key personnel for the project include Project Manager Sam Dillman and Senior Right of Way Agent/Environmental Analyst Debra Lundy.

General Info

Demolish and install new underdrain system at R.M. Levy Plant, Fall 2026 to 2028, CIP25203.

Agency

California → Helix Water District

Place of Performance

Lake Jennings Park Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Helix Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Helix Water District
Office AddressN/A
Contacts
Debra LundySenior Right of Way Agent/Environmental Analyst
Sam DillmanProject Manager

Full Description

Show more
The scope of work for this project consists of demolition of the existing filter underdrain system and installation of a new filter underdrain system including filter media, piping and associated appurtenances, and modifications to ancillary structures including access manways and concrete repairs involving negligible or no expansion of capacity at the Helix Water District’s R.M. Levy Water Treatment Plant site located at 9550 Lake Jennings Park Road, Lakeside, CA 92040. Project construction is anticipated to begin in Fall 2026, with a scheduled completion in 2028. This project will benefit district customers by maintaining reliability of service and avoiding costly emergency repair expenses. This facility is critical to the district's operations as it is part of the R.M. Levy Water Treatment Plant that supplies clean and filtered water to customers.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping in various diameters, the construction of standard and doghouse manholes, and the execution of trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, and the abandonment of existing pipes and manholes. Site preparation tasks encompass clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Critical project requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the procurement of railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes. Primary contact for this opportunity is John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

14 minutes ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is being solicited as a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid bond, evidence of authority to sign, and MWBE compliance documentation, including a Good Faith Efforts Form and Table A. The project is governed by EJCDC standard general and supplementary conditions, with technical requirements adhering to AWWA, NEMA, AWS, and ASTM standards. Contract administration is managed by Willis Engineers, and the contractor is required to furnish performance and payment bonds equal to the contract price, as well as insurance from companies with an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

14 minutes ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
WG Construction is seeking MBE/WBE subcontractors for the Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. Subcontracting opportunities are specifically available for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The project must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages of 1,000 dollars per day for delays. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety standards, ADA requirements for sidewalks and ramps, and the use of VDOT 2020 Road and Bridge Specifications. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount. Interested parties should contact Trish Mousavizadegan at [email hidden] or [phone hidden] for plans and specifications.
WG Construction Co., Inc.

POSTED

14 minutes ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS