R.m. Levy Water Treatment Plant Filter Rehabilitation Project - Cip25203

Closed
20260723023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 8 hours ago

DEADLINE

in about 17 hours

AI Contract Overview

Show more

The R.M. Levy Water Treatment Plant Filter Rehabilitation Project involves the complete replacement of eight existing filtration systems, requiring the demolition and disposal of outdated filter media, underdrain systems, surface wash piping, and stainless-steel baffles, followed by the installation of new stainless steel lateral underdrain systems compatible with either AWI Phoenix or Roberts SST designs, new filter media, and new surface wash piping. The work also includes modifications to filter gullet and gallery access manways, alongside associated concrete repairs, all while maintaining continuous plant operations through careful phasing and coordination. The project is located at 9550 Lake Jennings Park Road in Lakeside, California, and must be completed within 375 working days from the Notice to Proceed, with additional time allocated for startup, commissioning, and punch list resolution. All materials must be delivered in original, unopened manufacturer packaging, labeled with detailed information including manufacturer name, stock number, batch, manufacture date, and expiration, and stored in compliance with ASTM D3892, CALOSHA, and manufacturer guidelines to prevent damage from moisture, freezing, or sunlight. The contract requires adherence to ANSI/NSF 61, ASTM, ACI, ASME A13.1, and AWWA C651/C652 standards for materials and performance, with inspections and final acceptance occurring at the project site by the Helix Water District. The Contractor is responsible for all tests and inspections not specifically assigned to the District, which must be documented in detailed field reports including weather conditions and compliance assessments. A performance bond and payment bond are required, and contractors must be registered under California’s public works regulations. Bids must be submitted as sealed physical packages to the District’s La Mesa office by September 1, 2026, and are evaluated on a lowest price technically acceptable basis, with no electronic submissions permitted for the bid itself. Experience requirements mandate at least $20 million in water or wastewater treatment plant construction over the past seven years with specific filter underdrain installation experience. Materials must be preserved and labeled according to strict protocols, and substitution requests for approved alternate components are permitted only with formal approval based on performance, durability, warranty, and schedule impact. No contract value, funding identifiers, or electronic invoicing systems are specified, and none of the standard Federal Acquisition Regulation clauses are used; instead, project-specific provisions govern bonding, legal compliance, and subcontractor disclosure.

General Info

Renovate eight water filters with new underdrains, media, and piping while maintaining plant operations in Lakeside, CA.

Place of Performance

Lakeside, CA, 92040, USA

Set-Aside

NONE

Documents

5

Addendum No. 1 - R.M Levy Water Treatment Plant Filter Rehabilitation Project CIP25203

PDF, High priority: read this firstamendment
High

Addendum No. 2 for R.M Levy Water Treatment Plant Filter Rehabilitation Project CIP25203

PDF, High priority: read this firstamendment
High

CIP25203 TP Filter Rehabilitation Construction Plans

PDF, High priority: read this firstspecifications
High

R.M. Levy Water Treatment Plant Filter Rehabilitation Project CIP25203 Specifications

PDF, High priority: read this firstspecifications
High

Plan Holders List for Solicitation

PDF, Low priorityplanholders-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Helix Water District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Mark Urban (Engineer of Record
Sam Dillman (Owner's Representative

Full Description

Show more
The project involves the complete rehabilitation of eight existing water treatment plant filters. The scope includes the demolition and disposal of existing filter media (anthracite and sand), underdrain systems, surface wash piping, and stainless-steel baffles. The contractor will then install a new stainless steel lateral underdrain system (either AWI Phoenix or Roberts SST), new filter media, and new surface wash piping. The work also includes modifications and replacements for filter gullet access manways and filter gallery access manways, along with associated concrete repairs. All work must be performed while the R.M. Levy Water Treatment Plant remains in operation, requiring careful phasing and coordination.

More opportunities from California → Helix Water District

Same awarding agency

NAICS: 237110
SLED
R.M. Levy Water Treatment Plant Filter Rehabilitation Project
Solicitation # CIP25203
The R.M. Levy Water Treatment Plant Filter Rehabilitation Project, solicitation number CIP25203, is a construction contract issued by the Helix Water District in Lakeside, California. The project involves the demolition of the existing filter underdrain system and the installation of a new system comprising filter media, piping, and associated appurtenances, as well as concrete repairs and modifications to access manways. Work is subject to strict operational constraints, requiring a minimum of six filter basins to remain in service at all times, with the contractor limited to working on no more than two basins simultaneously. Each basin must be completed and accepted before others are taken out of service. The project includes a final cost estimate of 1.5 million dollars and requires adherence to ACI 350.1 for tightness testing of concrete structures and DDW water quality standards. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price, with a submission deadline of November 17, 2026. Bidders must provide a bid bond, noncollusion declaration, and certifications regarding the Iran Contracting Act, public works registration, and fleet compliance. Performance and labor and material payment bonds are required upon award. The contractor must comply with San Diego County prevailing wage rates, ADA regulations, and security procedures mandated by the Department of Homeland Security due to the facility's status as critical infrastructure. Payment will be made via monthly progress payments based on the percentage of work completed. The project timeline includes specific milestones for startup, testing, and commissioning, with a requirement to begin work within ten working days of the Notice to Proceed.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS