Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on April 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rénovation de locaux pédagogiques, Phase 2 / École secondaire de la Seigneurie

Closed
20132040International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511, Project No. 7607511, is a task order for the remediation, preparation, and painting of 22 designated barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The primary objective is the complete eradication of active microbial growth using EPA-registered disinfectants or approved antimicrobial solutions. The scope of work includes preparing and painting approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces, requiring one coat of mold and mildew resistant primer followed by at least two coats of specialized paint matching the existing color and sheen. All work must be completed within 60 calendar days after the award, and the contractor is responsible for all labor, supplies, equipment, and the off-base disposal of all debris. The contract will be awarded based on the lowest price, with a project range estimated between 25,000 and 100,000 dollars. Bonding requirements are tiered based on the proposal value, with no bonds required for amounts up to 35,000 dollars, a payment bond required for amounts up to 150,000 dollars, and bid, payment, and performance bonds required for amounts exceeding 150,000 dollars. The contractor must comply with the Davis-Bacon Act under wage determination NC20260018, the Buy American Act, and FAR liability insurance requirements. A qualified individual must serve as the Superintendent, Quality Control Manager, and Site Safety and Health Officer. Proposals are due by 1200 local time on September 16, 2026.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will house a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas including electrical, mechanical, and telecommunications rooms. The scope of work encompasses the complete design and construction of the building, the provision of furniture, fixtures, and equipment, and site work consisting of sidewalks and landscaping while utilizing existing parking areas. The project requires the integration of a Siemens Building Automation System to maintain compatibility with existing installation-wide systems and must adhere to UFC 4-010-06 cybersecurity standards for facility-related control systems. The contract is issued as a task order under the DHS National Multiple Award Construction Contract III, Pool Two, with an estimated magnitude of approximately 16 million dollars and a period of performance of 719 calendar days. Award is based on best value, utilizing tradeoff procedures that weigh price against non-price factors, specifically the offeror's planning, organization, communication, and construction approach. Key requirements include the use of US citizens for all on-site personnel, adherence to Davis-Bacon wage determinations, and compliance with various environmental and historic preservation consultations, including Section 106 and Coastal Zone Management Act determinations. Quality control will be managed through a system complying with FAR 52.246-12 and specific ASTM standards for materials testing.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909, titled CP2713M Replace Runway Switches, is a task order project for the Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches (PMS-6 and PMH-9) and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. For proposals exceeding 150,000 dollars, a bid bond must be submitted with the proposal, and payment and performance bonds will be required upon award. The project is subject to the Davis-Bacon Act and the Buy American requirement for construction materials. Key deliverables include an Accident Prevention Plan, a baseline construction schedule, and the implementation of a quality control program managed by a site-based QC Manager. Invoicing is to be processed via Wide-Area Workflow in accordance with prompt payment regulations for fixed-price construction contracts.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, is for the upgrade of life health safety systems in Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 380 calendar days from the date of award. The contract will be awarded based on the lowest price, and the government intends to issue the task order without discussions. Bidders must comply with the Buy American Act and the Davis-Bacon Act, and those submitting proposals exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. Key deliverables include a facility operating plan, functional performance test reports, and manufacturer-provided training information. Quality control is a critical requirement, necessitating a government-approved Quality Control Plan and the completion of preparatory and initial phase checklists for each definable feature of work. Invoicing is managed through the Wide Area WorkFlow system, and a detailed schedule of prices must be delivered within 15 calendar days of the contract award.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources (ETR) is soliciting fee-for-service bids for bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves comprehensive renovations of Building 17, covering approximately 944 square feet across four bathroom areas, and Building 18, covering approximately 1,260 square feet across five bathroom areas. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous china toilets, high-pressure laminate countertops, non-slip flooring, and LED lighting. To maintain center operations, contractors must utilize phased sequencing, renovating one dormitory at a time. All work must adhere to ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Requirements for submission include a detailed bid sheet with an itemized cost breakdown separating labor and materials, a proposed project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must have an active Sam.gov registration and a Unique Entity ID. The contract mandates a 100% performance bond and a 100% payment bond, and requires compliance with the Davis-Bacon Act and other FAR clauses regarding small business status and anti-lobbying. Final payment is contingent upon the submission of a signed punch list and applicable warranties, with standard payment terms set at net 30 days.
Northlands Job Corps Center /ETR

POSTED

about 6 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract seeks a qualified construction contractor to perform phase 2 renovations of educational spaces at École secondaire de la Seigneurie, located in Québec City. The work involves a comprehensive range of tasks including general contracting duties such as project coordination, site safety management, demolition (including asbestos conditions), interior system upgrades, painting, various types of flooring installation, carpentry, exterior cladding, roofing, suspended ceilings, masonry, windows, and installation of manufactured products like boards and lockers. The contractor or their subcontractors must be officially authorized roofing contractors recognized by the relevant material manufacturers and maintain active membership in the Association des Maîtres Couvreurs du Québec. Additional specialized trades are also required: plumbing and heating involving demolition, installation of fixtures and piping, as well as pipe insulation; ventilation including demolition of ventilation systems, installation and insulation of air treatment ducts and replacement of cooling systems; regulation work covering removal of unused control wiring, integration and programming of new equipment controls, and data management on school servers; electrical work including relocation and connection of mechanical equipment and lighting systems plus removal of obsolete electrical supplies; and structural tasks including diverse concrete work and structural reinforcement. The solicitation was posted in late March 2026 with a response deadline in mid-April 2026, and the contracting authority can be contacted via the Centre de services scolaire des Premières Seigneuries. The project reflects a substantial, multidisciplinary renovation intended to update and improve school facilities comprehensively.

General Info

Qualified contractor needed for multidisciplinary phase 2 renovations at École secondaire de la Seigneurie.

Agency

Government of Canada → Centre de services scolaire des Premières SeigneuriesView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Capitale-Nationale (Québec), CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Centre de services scolaire des Premières Seigneuries
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Centre de services scolaire des Premières Seigneuries
View Agency Profile
Office AddressN/A
Contacts
SRM ZZZ-SecrétariatContracting Authority

Full Description

Show more
Le Centre de services scolaire des Premières-Seigneuries désire retenir les services d'un entrepreneur en construction pour des travaux de rénovation de locaux pédagogiques phase 2 à l'école secondaire de la Seigneurie, située au 645, avenue du Cénacle, Québec (Québec), G1E 6G4. Se référer au document Régie pour la date de la visite des lieux, non obligatoire. L’entrepreneur ou son sous-traitant devra, au moment des soumissions et au cours des travaux, être reconnu officiellement comme entrepreneur couvreur autorisé par le fabricant des matériaux d’étanchéité et être membre en règle de l’« Association des Maîtres Couvreurs du Québec » (AMCQ). Description sommaire des travaux · Entrepreneur général o Coordination des travaux et gestion de la sécurité sur le chantier. o Démolition et percements en condition d’amiante ou pas. o Protection, déplacement et entreposage des biens et meubles. o Travaux de systèmes intérieurs. o Travaux de peinture intérieur. o Travaux de revêtement de plancher (céramique, revêtement époxydique, souple et sportif). o Charpenterie. o Revêtements extérieurs. o Toiture. o Travaux de menuiserie. o Plafond suspendu. o Fourniture et installation de produits manufacturés (tableaux, rideau diviseur, signalisation, casiers). o Maçonnerie. o Fenêtres. o Etc. · En plomberie/chauffage : o Travaux de démolition en plomberie/chauffage o Ajout d’équipements de plomberie (toilettes, lavabo, douches, drains) o Différents travaux de tuyauterie en plomberie / chauffage o Travaux d’isolation des tuyaux de plomberie / chauffage. o Etc. · En ventilation : o Travaux de démolition en ventilation. o Démolition d’équipement en ventilation et de conduits. o Installation d’un système de traitement d’air sur. o Remplacement d’un système de refroidissement. o Travaux d’isolation des conduits de ventilation o Installation des conduits d’air o Etc. · En régulation : o Enlever tout filage de contrôle non réutilisé o Prendre en contrôle les nouveaux équipements installés dans le cadre de ce projet et les intégrer dans les séquences de contrôle existant de l’école. o Déposer les graphiques sur les serveurs du centre de services scolaire o Programmation des séquences de contrôle des nouveaux équipements. o Etc. · En électricité o Relocalisation d’équipements électriques o Branchement des nouveaux équipements de mécanique o Travaux d’éclairage. o Démantèlement o Enlèvement de l'alimentation électrique des équipements non utilisés o Etc. · Structure : o Travaux divers de béton, bases de propreté, dalle de béton. o Travaux de renforcement structural o Etc.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS