Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on March 15, 2005. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

R -- Value Engineering Services

Awarded
DTFH70-05-Q-0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 16 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 17 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$79,915

NAICS

541330 - Engineering Services

Place of Performance

Federal Highway Administration610 East Fifth Street Vancouver, WA 98661, WA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts
Patricia S. MahurinSimplified Acquisition Contracting Officer

Full Description

Show more
Request For Quotation DTFH70-05-Q-0014 is being issued by Federal Highway Administration's Simplified Acquisitions Department with the intent to procure Value Engineering Services; Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is proposing to issue a Commercial Item procurement for completion of a Value Analysis of a roadway design and construction project for the Mission Ridge Road Forest Highway Project. WFLHD is developing this project in partnership with the USDA Forest Service (USFS), the Washington State Department of Transportation (WSDOT), and the Chelan County Department of Public Works; This will be a combined synopsis/solicitation for commercial items prepared in accordance with FAR Part 12 the acquisitions of commercial items in conjunction with the policies and procedures for solicitation evaluation and award as prescribed in FAR Part 13.106; this announcement constitutes the only notice and a written solicitation will not be issued; the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2001-27; it is the contractors responsibility to be familiar with applicable clauses and provisions; FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998), this contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text; Provisions and Clauses can be viewed and/or downloaded from http://www.arnet.gov.far/ Contractor will submit a completed copy of FAR 52.212-3, Offeror Representations and Certifications Commercial Items (Jan 2005) ( along with their quotation); Quotations must be received no later than 4pm Pacific Standard Time, March 31, 2005. Paper copies will not be available; you may fax your quote with any supporting data, to +1 (555) 000-0000; FAR Contract Terms that apply to this acquisition; FAR 52.212-1, Instructions to Offerors, incorporated by reference; FAR 52.212-3, Full Text, Offeror Representations and Certification, Commercial Items (Jan 2005); FAR 215-5 Facsimile Proposals; incorporated by reference; FAR 52.212-4, Contract Terms and Conditions Commercial Items (Oct 2003), incorporated by reference; FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders, Commercial Items;(Jan 2005); Contractor shall comply with the following clauses which are incorporated by reference: FAR 52.233-3, Protest after Award; FAR 52.232-33 Payments by Electronic Funds Transfer, Central Contractor Registration (Oct 2003);FAR 52.222-3, Convict Labor (June 2004); FAR 52.222-19, Child Labor-Cooperation with Authorities and Remedies, (June 2004); FAR 52.222-21, Prohibition of Segregated Facilities< (Feb 1999); FAR 52.222-26, Equal Opportunity, (Apr 2002); FAR 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (Dec 2001); FAR 52.22 2-36, Affirmative Action for Workers with Disabilities (Jun 1998); FAR 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Dec 2001); the estimated price range for the services will be > than $25,000. < $100,000; This RFQ will be 100% set-a-side for small business; all firms responding must be registered with Central Contractor Registration (CCR) (website: http://www.ccr.gov/) or be registered prior to receiving award: (+1 (555) 000-0000); Once this combined synopsis/solicitation is posted it is incumbent upon the interested parties to review this site for any updates/amendments to any and all documents; The North American Industry System Code is 541330 with a size standard $4mil; The project is located within the Wenatchee National Forest in Chelan County, in central Washington. The project begins at the beginning of Mission Ridge Road and ends at the Mission Ridge Ski Area, a total distance of 4.15 miles.The objectives of the value engineering study are: - To identify changes to the project design to better accomplish the essential functions of the project for the lowest cost. - To focus on all items or recommendations the value team considers having potential for significant cost savings and project efficiency. - To consider any issues that would provide environmental savings or improvements to the project implementation. The availability of the consulting firm to provide a SAVE-certified Value Specialist will be a minimum requirement for selection. The experience of the consultant team with similar projects will be major determinants in the selection of the consultant. The professional credentials of the proposed VE team leader and the proposed VE team members will also be major determinants in the selection of the consultant. The approach to conducting the VE studies and a demonstrated understanding of WFLHD's need, will also be major determinants in the selection of the consultant, as will the consultant's and the VE team leader's past performance as confirmed by previous clients. This will be a firm fixed price project. Pricing should include all costs to complete the project Chelan County, in partnership with the USFS as part of the Forest Highway Program is proposing reconstruction of Mission Ridge Road, WA PFH 216-1(1). The project includes approximately 4.15 miles of reconstruction, realignment, overlay, widening, grading, drainage improvements, base, paving, culvert replacement, retaining wall, signing and striping. This project is located southwest of Wenatchee, WA from the beginning of Mission Ridge Road to the Mission Ridge Ski Area. The project is being designed by Western Federal Lands in cooperation with the USFS and Chelan County. Scope of work, Provide a VE team leader with the minimum qualifications specified and VE team members to plan and conduct the VE study, to assist WFLHD in decisions regarding acceptance of the VE recommendations, and to prepare the study documentation. The work will consist of the following individual tasks: - Meet with the WFLHD project manager either in person or by phone, and reach a decision about the details of the VE study. - Meet with the WFLHD project manager to review the project and the project issues and reach an agreement regarding the date for the VE workshop and the team members to be provided by the USFS and Chelan County. - Prior to the VE workshop accomplish the following activities: - Coordinate workshop logistics - Review of the design documents and other documents about the project provided by the WFLHD by the VE team leadership and by the VE team members - Using project cost estimate information provided by the WFLHD and by the design team, prepare a capital cost model - Conduct a validation of the estimated project construction costs - Provide a Certified Value Specialist VE team leader to conduct a 40-hour VE workshop. Also provide a VE team assistant to record the activities of the VE team and to provide administrative and clerical support to the VE team during the workshop. Provide VE team members needed for the review of the project, for the number of workshop days identified in the proposal. The workshop will be conducted using a job plan consistent with SAVE International guidelines for value engineering studies. The workshop is to be conducted in Wenatchee, Washington. The room in which to conduct the workshop will be provided by the VE consultant. The VE workshop will consist of the following six phases: - Information Phase - Function Analysis Phase - Creativity Phase - Evaluation Phase - Development Phase - Presentation Phase - Following the VE workshop, conduct the following activities: - Submit a preliminary VE report, consisting of the workshop work products within three (3) working days of the completion of the VE workshop. Provide the number of copies specified in the task order - Review the design team written responses to the preliminary VE report, consult with the VE team members as necessary, and prepare for the decision-making meeting. - Attend the decision-making meeting at Western Federal Lands in Vancouver, WA, and provide information to the decision-makers at the meeting relative to the pros and cons of each VE recommendation. Respond to the concerns raised by the design team and others, and assist the Western Federal Lands designer and the Western Federal Lands project manager in reaching decisions about whether to incorporate each VE recommendation into the project design. - Prepare one copy of a draft, typed final report within five (5) working days following the decision-making meeting, which documents the entire VE study, including the decisions made. - Make appropriate revisions to the typed final report based on comments from the VE project manager, and provide three copies within ten (10) working days following receipt of comments from the designer and project manager. - Materials to be supplied by WFLHD-Project Description and Project Checklist - Accident Data - Preliminary Plans and Estimate * - Preliminary Cross?sections - Estimated Pavement Design - Geotechnical Slope Recommendations in addition to a preliminary geotechnical report - Approximate Wall Locations - Project Proposal - Project Agreement - Abbreviated Project Inventory Report - Draft Final Resource Report - Historic Property Inventory Report - Preliminary Wetlands Finding Report - Preliminary Public Involvement Summary - Map of Project Location *The Preliminary Estimate is for official use only and shall not be distributed beyond the VES Team or used for purposes other than this VES. - Because of the timing issues and that the project may be under snow at the time of the study, WFLHD will provide additional photographs of the project at the request of the selected consultant. - Report Documents - The Summary Report should be submitted electronically (on CD) to WFLHD at the completion of the presentation. The CD should also contain an electronic copy of the presentation. - Schedule - the project milestone dates are - Proposals Due - March 31, 2005 - Proposal Evaluation - April 7, 2005 - Conduct the value study workshop no later than May 13, 2005 - Complete the Post VE Study deliverables - June 30, 2005 The VE team shall, as a minimum, include the following (identify based on project requirements): - VE Team Leader - Highway Engineer - Drainage Engineer - Geotechnical Engineer - Environmental Specialist - Cost Estimator In addition - The USFS and Chelan County will each provide one full-time team member. Submittal Requirements; Proposal packages shall be no more than 15 pages in length, not including covers, a one-page cover letter, or resumes and standard company brochures included in the proposal appendix. Use of Form 330 is optional but the form in its self can provide all the information requested. (disregarding the level of effort being Architect/Engineer) Proposals shall provide the following information, at a minimum: - Firm background - Approach to conducting value engineering on this project - Qualifications of value engineering team leader - Qualifications of value engineering team members - Similar previous experience - References Three (3) copies of the proposal shall be submitted to the following address no later than 4 pm, local time on March 31, 2005: Patricia Mahurin, Simplified Acquisitions Western Federal Lands 510 East Fifth Street Vancouver, WA 98661-3801 Place of Contract PerformanceAddress/City/StateFederal Highway Administration Questions regarding the submittal procedures should be directed to Patricia Mahurin at +1 (555) 000-0000. Questions about the technical aspects of the project should be directed to Kirk Loftsgaarden at 360?619?7512. No verbal information provided to proposers will in any way change the requirements or provisions of this Request For Quotation. Any changes to the RFQ will be made in writing in the form of an addendum, and will be sent to all interested firms. Proposals received after the date and time specified without required documentation may not be considered. Award will be made on a - Best Value basis considering experience, capability, past performance and price always being a factor. Award may not necessarily be made to the contractor submitting the lowest price or to the contractor with the highest past performance rating. Award will be based on the following selection criteria being the most advantageous to the Government. Payment will be made at the contract price upon receipt of a properly completed invoice for the actual work performed. An in-house committee will evaluate all proposals. The proposals will be evaluated on the basis of the following criteria: Criterion Weight Approach 25% VE Team Leader Qualifications 20% VE Team Member Qualifications 20% Applicability of Previous project Experience 15% Previous Performance (based on references) 10% Cost 10% WFLHD reserves the right to reject any and or all proposals. Project Description: Mission Ridge Road provides recreational access to the Wenatchee National Forest and residential access to a local subdivision. The road during the ski season has as many as 1500 vehicles per day. The existing roadway width ranges from 22' to 32' in width. The road would be widened, drainage structures added, replaced or repaired, guardrail would be added, slow-moving vehicle lanes evaluated and cut and fill slopes would be stabilized. The design speed for the proposed road would be 35 miles per hour, but the majority of the curves would remain as originally constructed. The preferred alternative for this project basically follows the existing alignment. Approximately 50% of the curves have a design speed of less than 35 mph, but additional safety measures would be included to improve the design over the existing conditions. The purpose of the project is to improve the safety of the roadway, provide snow storage for winter plowing operations and improve the roadway for future maintenance operations. Approximately eight crashes per year are reported, and recently there have been fatalities on the road. The road currently climbs a series of switchback curves and is narrow with steep side slopes in many locations. Many of these steep side slopes are not currently protected by guardrail. Under the preferred alternative, the road would be reconstructed to a width of 28 feet and partially realigned to achieve more of the AASHTO minimum safety standards for rural collectors in mountainous terrain. The desired design speed can be achieved on approximately 50 % of the roadway; however, appropriate design speed cannot be achieved on the remaining curves due to the steep existing grades (7 % average), cost, and physical and environmental constraints (stream crossings, switchback type curves, wetlands, and wildlife habitat). Some of the substandard curves cannot feasibly be straightened because the resulting roadway segment would have grades that exceed the AASHTO-recommended maximum of 12 %. Some would not be corrected because of the exorbitant cost of moving massive quantities of earth and rock and/or disturbing habitat, such as streams and also due to potential impacts to local landowners. All minor culverts would be replaced for this alternative. The culvert at Squilchuck Creek would be retrofit to better accommodate potential fish passage and the culverts at Miners Run Creek would also be retrofit if fish passage is necessary. As part of the culvert improvements, some of the slopes at the stream crossing would be flattened and drainage flowing into the streams would be controlled to minimize erosion and the amount of sediment flowing into the stream. For the purpose of discussion, the project corridor is divided into the two segments. One segment is restricted by homes adjacent to the roadway and the other segment is restricted by private landowners, in addition to environmental concerns. The segments are as follows: - Lower segment - from the beginning of the project to Miners Run Creek (MP 0.0 to MP 1.3) - Upper segment - from Miners Run Creek to the Mission Ridge Ski Area entrance (MP 1.3 to MP 4.15). The other difference between the two segments is that in the summer, the majority of the traffic will exit the road at or prior to Beehive Reservoir Road (MP 1.2) and the upper segment is generally used only by local traffic traveling to the ski area. Lower Segment - Beginning to Miners Run Creek (Mileposts 0.0 to 1.3) For the lower segment, the preferred alignment basically stays on the existing roadway with some minor curve realignment but generally within the framework of the existing road. The new roadway is slightly shifted one direction or another to try to improve the geometry. Near milepost 0.5, there is an existing large cut slope on the south side of the roadway. In the preferred alternative, the roadway at this location would be shifted to the north to allow additional room for rock fall. The roadway in this segment would require retaining wall on the north side to accommodate the shift, and to minimize the disturbance. The lower segment of the preferred alternative travels mostly among land with homes located immediately adjacent to the roadway. The impacts to these properties and homes were considered in the design for the roadway in this segment. Upper Segment - Miners Run Creek to End of Project (Mileposts 1.3 to 4.15) This segment of the roadway continues to travel through private property but also travels through some USFS property toward the end of the project. The private property in this segment does not contain any homes but the landowners remain a consideration in the design. For the upper segment, the alternative departs from the existing alignment in one location (MP 2.6). This curve has been modified to shift the roadway further away from Squilchuck Creek. The proposed curve realignment does not achieve the desired minimum AASHTO design speed; however, it would result in a substantial improvement over existing conditions. A design exception would be required, and the remaining curves would need improvements in super elevation rates and the installation of proper warning signs, upgraded pavement markings, and safety devices. The shift would minimize sediment plowed into the stream due to the increase in proximity of the roadway to the stream. In the upper segment there are several switchback-type curves with minimal distance between the roadways in the switchback areas. In the preferred alternative many of these locations would require retaining walls to provide sufficient room for a widened pavement surface and safety improvements. Additionally in this segment, there are slopes that have slump areas and steep rock cuts that have stabilized since the original construction. In these areas, the alignment would shift away from the existing cut slopes to minimize disturbance and the risk of future slides. The shift would result in retaining walls on the fill slope side of the roadway to avoid long fill slopes and considerable disturbance. Additional Widening: A slow moving vehicle pullout is planned near milepost 1.5 on the west side of the roadway. The pullout will be approximately 300' long and would serve as both a pullout and snow storage area. Items of concern: The currently designed alignment is 28' in width with a considerable amount of mechanically stabilized earth retaining wall. The width and the amount of retaining walls have a direct correlation to the overall cost of the project. These items should be carefully considered.

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 532490
New
Federal
Modular Buildings & Restroom Rental with Ancillary Services
Solicitation # 69056727Q000005
Solicitation number 69056727Q000005 is a combined synopsis and request for quotation issued by the Department of Transportation's Western Federal Lands Highway Division to support operations during a facility renovation in Vancouver, Washington. The requirement is for the temporary lease of prefabricated modular office buildings, including one double-wide unit of approximately 24 by 60 feet with specific office and conference room configurations, two 8 by 40 foot single-wide modular units with HVAC, and an executive restroom trailer. The scope of work encompasses the entire lifecycle of the installation, including site preparation, delivery, utility connection, weekly septic pumping, preventative maintenance, and eventual demobilization. All units must be ADA compliant and adhere to International Building Code standards for commercial occupancy. This acquisition is unrestricted and open to all qualified vendors under NAICS code 532490. The government will utilize a Lowest Price Technically Acceptable model for the award, evaluating offers based on price, requirement specifications, relevant past experience, and past performance. A 10 percent price preference is available for HUBZone small business concerns. Quotations must be submitted via the GSA eBuy Portal by November 24, 2026, at 2:00 pm PT. Invoicing will be processed through the DELPHI iSupplier system, and the contract incorporates various FAR clauses regarding labor standards, security requirements, and business ethics.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
Federal
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Solicitation # 69056726B000010
Solicitation 69056726B000010 is an Invitation for Bids for the Hurricane Ridge Rockfall Mitigation MP 9.4 project located in Olympic National Park, Clallam County, Washington. This firm fixed-price construction project, managed by the Department of Transportation's Federal Highway Administration Western Federal Lands Division, involves the installation of a rockfall mitigation system approximately 11 miles south of Port Angeles. The scope of work includes the installation of 102 linear feet of Geobrugg RXE-8000 flexible rockfall barrier fence and the treatment of 260 square yards of galvanized steel using Natina Steel weathering agent. Additional requirements include survey and staking, quality control, testing, clearing and grubbing, excavation, and the construction of retaining walls, all adhering to FP-24 standard specifications. The estimated project value ranges between 2 million and 5 million dollars, with a tentative completion date of Fall 2027. This opportunity is a total small business set-aside, and awards will be made to the responsible bidder offering the most advantageous price. Bids must be submitted in sealed envelopes by 1400 local time on November 4, 2026, and must include a valid Standard Form 24 bid bond. Contractors are required to use the Masterworks web-based system for daily reports and measurement notes, and they must comply with specific restrictions prohibiting audio/video recording or AI note-taking during government meetings. The contractor is also responsible for securing all necessary permits for any material sites or sources they identify. Payment will be processed via Electronic Funds Transfer.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 237310
Federal
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Solicitation # 69056726R000020
The project WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3, is a firm-fixed-price task order contract under a Multiple Award Task Order Contract (MATOC) for the Western Federal Lands Highway Division. Located 0.4 miles southwest of Mammoth, Wyoming, the project involves the reconstruction of a 0.7-mile roadway section and associated parking areas within Yellowstone National Park. The scope of work is comprehensive, including 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage and roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, and the installation of concrete curbs, gutters, striping, and signage. The estimated price range for the project is between 45 million and 55 million dollars, with a tentative completion date set for Fall 2028. The solicitation is structured around two primary bid schedules and one option. Schedule A focuses on mainline construction with a 22-foot typical pavement width and the reconstruction of the Norris Geyser Basin parking lot, while Schedule B specifies a 30-foot typical pavement width for the same areas. Option Z covers grading, base, pavement, major drainage, and the construction of a steel boardwalk at the Rustic Falls Boardwalk and the Osprey Pit Road Box Culvert. Only one of the two schedules will be awarded. The project is solicited to approved MATOC contractors, with the formal request for proposal anticipated in Winter 2026/2027. All work must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects for the FP-24 project area.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

N/A
View Details
NAICS: 237310
Federal
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Solicitation # 69056726R000019
Solicitation 69056726R000019 is a firm fixed-price task order request for proposals issued by the Federal Highway Administration Western Federal Lands Division for the Yellowstone Trail Road, Segment 1 project in Kootenai County, Idaho. Located in the Coeur d'Alene National Forest, the 0.20-mile project involves roadway realignment and reconstruction, the installation of a new single-span precast prestressed concrete structure, and rock-mass stabilization. The estimated price range for the work is between 2 million and 5 million dollars, with a tentative completion date in Fall 2027 and an assumed notice to proceed date of January 12, 2027. This is a restricted MATOC solicitation, meaning proposals will only be accepted from six specific prime contractors: ASCORP Inc (DBA Debco Construction), Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Award will be based on the best value, primarily focusing on the lowest price among responsible offerors. The project must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) and requires strict compliance with various Federal Acquisition Regulation clauses regarding labor standards, equal opportunity, and material workmanship.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS