Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

R26-0012

Closed
47381State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Federal
ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road
Solicitation # 69056726R000010
This contract opportunity is issued under the Idaho, Montana, and Surrounding Areas MATOC IDIQ vehicle for a federally funded transportation project along the Western Heritage Byway – Swan Falls Road, located approximately seven miles south of Kuna, Idaho. The work involves comprehensive highway improvements including shoulder widening, paving, signage installation, parking lot enhancements, and culvert replacements over a stretch of up to 8.5 miles. The project is structured with four separate bid schedules, but only one will be awarded under a Firm-Fixed-Price task order. Estimated value ranges between $5 million and $10 million, with a tentative solicitation date in summer 2026 and planned completion by summer 2027. Performance is governed by the Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges (FP-24), along with FLH Standards 619-3 and 635-1, which dictate material, construction, and traffic control requirements. Detailed plans, including permanent traffic control layouts and pavement marking details, are available as attachments. The contract will be administered by the Western Federal Lands Division of the Department of Transportation, based in Vancouver, Washington, with inquiries directed to the contracting office. Only prequalified IDIQ contractors eligible under the MATOC program may respond, and interested parties must register on SAM.gov to access the Interested Vendors List. No evaluation factors, contract clauses, representations, certifications, or detailed pricing structure beyond the estimated range have been published at this pre-solicitation stage. Notification of solicitation posting is available by following the opportunity on SAM.gov.
690567 Western Federal Lands Division

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
I-84: Emigrant Hill WIM Site Repaving Project
Solicitation # S-73000-00017767
The I-84 Emigrant Hill WIM Site Repaving Project, solicitation S-73000-00017767, is a state-funded public improvement contract issued by the Oregon Department of Transportation. The project involves replacing weight-in-motion detection at mile post 227.54 westbound, requiring full depth continually reinforced concrete pavement repair and the temporary removal of median concrete barriers to maintain two-way traffic on the eastbound side. The scope includes mobilization, traffic control, excavation, electrical systems installation, and the use of agency-furnished materials such as sensors and cameras. The project is scheduled to start no earlier than April 1, 2027, with substantial completion by June 18, 2027, and final completion by June 25, 2027. A critical performance requirement mandates that the removal, installation, and activation of the WIM system be completed within 21 consecutive calendar days once the system is taken out of service. Award will be granted to the responsible bidder submitting the lowest responsive bid. Bidders must be certified with the Confederated Tribes of the Umatilla Indian Reservation Tribal Employment Rights Office and adhere to a 15% Indian Employment Preference Goal. The contract requires compliance with BOLI prevailing wage rates, State Buy America requirements for steel and iron, and ADA standards. Submission must be made via OregonBuys, including a bid security equal to 10% of the total bid amount. Performance and payment bonds are required upon award. Quality control is emphasized through specific material packaging requirements for geosynthetics and rigorous compressive strength testing for hardened concrete.
Procurement

POSTED

about 20 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Alameda County Transportation Commission is soliciting bids for the East Bay Greenway Multimodal (Phase 1) Construction Package in San Leandro, California, under solicitation number 47381 and contract title R26-0012, with a NAICS code of 237310. The scope encompasses comprehensive roadway reconstruction including full removal of existing pavement, installation of new asphalt and concrete surfaces, construction of sidewalks, curb ramps, curbs and gutters, and pavement striping. The project further requires installation of roadside and wayfinding signs, traffic signals, warning beacons, street lighting, drainage infrastructure modifications, bioretention areas, landscaping, utility adjustments including irrigation and electrical conduit connections, and coordination with Union Pacific Railroad and BART corridors. All work must comply with the 2025 Caltrans Standard Specifications and Plans, California MUTCD Part 4, and City of San Leandro standards, and is governed by the Caltrans Encroachment Permit and BART Site Specific Workplan. The contract mandates strict adherence to quality assurance and control protocols, requiring a qualified QC manager with at least ten years of relevant experience and an alternate qualified to step in. The Department retains full rights to inspect, sample, test, photograph, and video record work at any time, with non-compliant work subject to cost deductions. All construction must follow a baseline schedule established on the first working day, with monthly progress reviews and critical path adherence; delays on critical elements extend the contract completion date defined by the Engineer’s weekly working day statement. Bidding is strictly electronic through BidExpress, with a deadline of June 29, 2026, and requires registration and a Digital ID at least 48 hours in advance. Bidders must submit a complete Bid Book with authorized digital signatures and notarized documents, along with required certifications for Small Business, Disabled Veteran Business Enterprise (DVBE), and Disadvantaged Business Enterprise (DBE) status by specified post-bid deadlines. The award is based on total bid price, adjusted through socioeconomic incentives: DVBE and Small Business bidders receive reductions up to 5% of the verified total bid or capped at $250,000 and $50,000 respectively; non-small businesses may qualify for preference by subcontracting 25% of the work to certified small businesses. A bid is nonresponsive if the Certified Small Business Listing for Non-Small Business Preference is not submitted by 4 p

General Info

Roadway improvement with new pavement, sidewalks, drainage, signs, signals, and lighting in California, due June 29, 2026.

Agency

California → Alameda County Transportation CommissionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(15)

SL_Geom - Standard.zip

ZIP

EBGW San Leandro Permit to Enter and Construct 1587103

PDFpermit-to-enter-and-construct

22-854.1 East Bay Greenway Pavement Design Report

PDFpavement-design-report

BART Site Specific Work Plan (SSWP) Sample

PDFsswp

2025 California Department of Transportation Standard Plans

PDFstandard-plans

Alameda CTC East Bay Greenway Multimodal Phase 1 San Leandro Construction Package R26-0012

PDFspecifications

22-854.1 East Bay Greenway Preliminary Site Assessment Report

PDFpreliminary-site-assessment-report

Alameda CTC East Bay Greenway Multimodal Phase 1 San Leandro Construction Project Plans

PDFproject-plans

Addendum No. 2 for East Bay Greenway Multimodal Phase 1 Construction R26-0012

PDFamendment

Addendum No. 1 for IFB R26-0012 East Bay Greenway Multimodal San Leandro Construction

PDFamendment

Utility Locating Pothole Depth Report for Mark Thomas San Leandro

PDFreport

California DOT 2025 Standard Specifications

PDFspecifications

Encroachment Permit DOT TR-0120 for Alameda County Transportation Commission

PDFpermit

Arborist Report East Bay Greenway Project Phase I E. 14th St. to San Leandro City Line

PDFarborist-report

Maintenance Consent Letter and Contractor Endorsement for Alameda County Project 0809202

PDFcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Alameda County Transportation Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Alameda County Transportation Commission
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be done consists of removal of existing roadway pavement, constructing new roadway pavement, installing concrete curb, curb ramps, sidewalks, curbs and gutters, pavement striping; installing roadside and wayfinding signs, installing landscaping and bioretention areas, drainage infrastructure modification, utility adjustments, traffic signal, warning beacon, street lighting installation and modification.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS