Radon Mitigation Gravel Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the installation of a four-inch layer of pea gravel beneath the foundation as part of a radon gas mitigation system, following specified technical requirements to ensure effective gas dispersion and building safety. This work is scoped as a subcontract under the NAICS code 238220, which categorizes it under foundation, structure, and building exterior contractors, indicating the specialized nature of the installation. The project is tied to Branch Intermediate School District in Coldwater, Michigan, with the work required to be performed at that location. The solicitation was posted on July 27, 2026, and responses are due by August 10, 2026, at 6:00 PM, leaving a clear window for qualified subcontractors to submit proposals. Although details on set-aside status and point of contact are omitted, the emphasis on compliance with technical specifications underscores the importance of precision in material placement and adherence to radon mitigation standards to meet health and safety regulations.
General Info
Agency
NAICS
Place of Performance
Coldwater, MI, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Michigan → Branch Intermediate School Dis
Same awarding agency
