Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Massachusetts was posted on March 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rail System Electrification Design and Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The project necessitates a comprehensive approach including the procurement of materials, waste removal, and the integration of professional engineering and testing services for geotechnical design and roadway materials. Construction will be subject to rigorous material characterization tests, such as the California Bearing Ratio and Plate Load tests, with operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some weekend and after-hours work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

18 minutes ago

DEADLINE

in 3 months
NAICS: 237130
New
International
Pacific Science Enterprise Center (PSEC) - Power Distribution Upgrade
Solicitation # 30008413
Fisheries and Oceans Canada is soliciting the supply, installation, testing, and commissioning of new underground electrical distribution and communications infrastructure at the Pacific Science Enterprise Center in West Vancouver, British Columbia. The scope of work includes comprehensive civil works such as excavation, trenching, and surface restoration, as well as the installation of electrical cabling, access vaults, pull boxes, and outdoor electrical kiosks. Additionally, the contractor is responsible for the complete electrical infrastructure for new Electric Vehicle Supply Equipment, including feeders, wiring, and concrete bases. All project activities, including final clean-up and demobilization, must be completed by March 19, 2027. This procurement follows a two-phase selection process. Phase 1 evaluates bidder qualifications and experience, requiring at least one reference project of similar scope completed within the last five years. Pre-qualified bidders will then be invited to Phase 2 to provide a financial bid based on detailed specifications and drawings. This opportunity is a conditional set-aside under the Procurement Strategy for Indigenous Business, requiring certified Indigenous businesses to provide specific certifications. Bidders must also be in good standing with WorkSafeBC and comply with the Canada Labour Code and Canadian Occupational Health and Safety Regulations.
Department of Fisheries and Oceans

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Dalton Utilities

POSTED

4 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Massachusetts Bay Transportation Authority is seeking a subcontractor for the Rail System Electrification Design and Engineering project. This contract focuses on the comprehensive planning, design, and engineering required for the full electrification of the MBTA commuter rail network, specifically covering the implementation of overhead catenary systems and traction power substations, as well as the necessary integration with rolling stock. The solicitation was posted on March 15, 2024, with a response deadline of April 26, 2024. Classified under NAICS code 237130, this effort represents a critical infrastructure upgrade to modernize the rail network's power systems. Interested parties can find further details through the official CommBUYS procurement portal.

Documents

This scope was carved out of BD-24-1206-MBTA-MBTA-99853.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFI 63-24 Regional Rail Future Innovative Operating Contract

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts Bay Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Planning, design, and engineering for full electrification of the MBTA commuter rail network, including overhead catenary systems, traction power substations, and integration with rolling stock.

More opportunities from Massachusetts Bay Transportation Authority

Same awarding agency

NAICS: 331221
New
SLED
IFB 152C-26 Switch point stock Rail and Frogs
Solicitation # BD-27-1206-40000-40000-135159
The Massachusetts Bay Transportation Authority (MBTA) is soliciting bids for the furnishing, fabricating, and delivery of special trackwork components, specifically AREMA Railbound Manganese Frogs and AREMA Switch points and Stock rails. The scope includes the delivery of stock rails typically 39 feet straight and fully undercut, as well as No. 6 AREMA Medium Wall Railbound Manganese Frogs and specialized manganese cast frogs for the Bowdoin Loop and Government Center. All components must be delivered bolted and banded as single units to the MBTA Rail Shop in Charlestown, MA, within 120 days of the purchase order receipt. Technical requirements mandate that switch points and stock rails be heat treated to 321-388 Brinell and comply with AREMA Plans 100-08, 111-08, and Section 100-89. The contract will be awarded to the lowest priced responsive and responsible bidder based on the total amount of the itemized price sheet. Bidders must submit all documentation, including the Bid Cover Letter and pricing forms, electronically via COMMBUYS by the deadline of December 1, 2026. The contractor must maintain MBTA minimum insurance requirements and comply with various safety and data security standards, including the Massachusetts Right-to-Know law and PCI compliance. Payments are issued via EFT with standard terms of 45 days from invoice receipt, though prompt payment discounts are available for accelerated intervals.
Rolled Steel Shape Manufacturing

POSTED

5 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS