This Solicitation opportunity from South Carolina was posted on October 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Railroad Boring Services Briarwood Road
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Greenwood Metropolitan District is soliciting bids for railroad boring services at Briarwood Road in Greenwood, South Carolina, under solicitation 2026-RFB-008. The project involves the installation of approximately 180 linear feet of 18-inch steel casing and 213 linear feet of 10-inch C900 PVC force main via bore and jack under a CSX railroad crossing. The scope of work includes furnishing all necessary labor, materials, equipment, and tools, as well as performing open-cut point repairs for connections at each end, installing valves and appurtenances, and conducting all required product testing. Contractors are responsible for paying railroad inspection services, though the district will provide reimbursement up to a specified allowance. Bids must be submitted by October 27, 2026, and require a mandatory site visit on October 21, 2026. Qualified bidders must be licensed General Contractors in South Carolina and provide a bid bond of 5% or a certified check. The successful contractor will be required to provide performance and payment bonds, as well as Railroad Protective Liability Insurance. The contract stipulates a 120-day completion timeline with liquidated damages of 500 dollars per day for delays. Payment is subject to a 10 percent retainage until final acceptance, which occurs after all testing is complete, punchlist items are addressed, and as-built drawings are approved. All work must comply with CSX safety regulations and the Greenwood Metropolitan District 2024 Design Manual.
General Info
Place of Performance
Set-Aside
Documents
18AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Requisition 21MA000516 to is issued for design build water tower repairs and recertification at the Germantown Campus in accordance with the American Water Works Association AWWA for the Firm-Fixed P…Open now
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice description changed.
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (17)
See All 17 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Official Notice #1: Individual Site Visit Deadline Approaching: Reminder that the deadline to request an individual site visit is Tuesday, October 13th. Site visits thereafter will be conducted on the group site visit day/time posted. Individual site visit attendance with GMD's Engineer or Representative will be counted as attendance for the mandatory group site visit.
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #2: Site Visit Reminder: Reminder that today is the the last opportunity for a site visit for this project. All contractors should start at the Emmett F Brooks Facility location at 110 Metro Drive at 10:00 AM for a brief project summary, to be followed by the group site visit.
Addendum #2: Q1: Are Hymax couplings allowable? A1: Yes Hymax Grip couplings may be used in lieu of RJ mechanical joint couplings. Epoxy coating must be intact. Q2: Will CSX require a surveyor? A2: Yes. Refer to Item 24 on plan sheet 4 - CSX Required Notes. Q3: Will the contractor be required to restrain existing pipe upstream / downstream of tie-in? A3: The contractor must restrain any joint of existing pipe that is exposed incidental to making connections. No additional excavation to restrain existing pipe is required. Note that thrust blocking is required in addition to restrained joint pipe and fittings. Q4: Will the contractor be required to follow testing procedures? A4: Yes all testing requirements of the GMD Design Manual will be enforced. Refer to standard specifications Section 15100 - Force Main Piping and Valves. Note that the final tie in assembly will not require pressure testing after installation. Final tie-in components must be fully assembled and the integrity of all gaskets confirmed prior to interruption of the existing force main. Q5: Will GMD clearing prior to the contract work include the shoulder of McCormick Hwy (SC-10)? A5: No. GMD will ONLY clear the five (5) pine trees located on the shoulder of Briarwood Road, as indicated in the attached meeting presentation. Any additional clearing will be considered incidental to the work and must be included in the unit price bid. Q6: 18-inch casing is non-standard Will 20-inch casing be allowed in place of 18-inch casing? A6: Only upon the approval of CSX. Bidders must price the work as 18-inch casing to match existing conditions. Q7: Will GMD supply water for testing? A7: No. Bidders will need to obtain permission (and hydrant meter) from Greenwood CPW for testing. A hydrant is located at the corner of McCormick Hwy and Woodlawn Rd, within sight of the project. Confirm with CPW that this hydrant is suitable prior to use. Q8: Will GMD provide a Vac truck for the project? A8: Yes. GMD will provide our Vac truck for use that is incidental to the work. Should emergency pump and haul be required, contractors should have a contingency plan to supplement GMD's two Vac trucks. Attachments: GMD_Briarwood_Rd_RR_Bore.pdf, SCDOT_Encroachment_Permit_Files.pdf, Sign_In_Sheet_Railroad_Boring_Briarwood.pdf
Official Notice #3: Clarification on Certificate of Owner's Attorney Form: Please note that one of the Attachments provided in the bid package was not labeled as a Sample document. The Certificate of Owner's Attorney form is for informational purposes only and is not required to be submitted with your bid.