This Solicitation opportunity from Pennsylvania was posted on July 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ralpho Township Gym ADA Accessible Entrance Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Ralpho Township Gym ADA Accessible Entrance Project in Northumberland County, Pennsylvania, involves updating the rear entrance of the gym located at 206 South Market Street, Elysburg, to ensure ADA accessibility. Funded by Community Development Block Grants, the scope of work includes the demolition of existing concrete stairs, pads, handrails, roof structures, and electrical components. Subsequent construction will feature a new concrete ADA ramp, landing, stairs with stainless steel handrails, a new canopy roof with integrated gutters, concrete-filled steel bollards, and vertical siding. Additional requirements include the installation of a Norton 5740K3 Power Operator Kit for the exterior door, pavement restoration, the creation of an ADA-compliant parking space with appropriate signage and paint, and the relocation and installation of lighting and security cameras. Sealed bids are due via PennBid by 11:00 A.M. on July 28, 2025, with the award contingent upon Seda-COG approval for CDBG funding compliance. The project mandates a 10 percent bid bond, adherence to Davis-Bacon wage rates, and specific MBE/WBE and Section 3 participation goals. Work must be substantially completed within 90 calendar days of the Notice to Proceed, with liquidated damages applicable for delays. The contractor is responsible for all required permits and must comply with PennDOT Publication 408 Specifications, OSHA standards for trench shoring, and Pennsylvania environmental laws. Performance and payment bonds are required, and the contractor must name the Owner and Engineer as additional insureds.
General Info
Contract Value
$228,206Place of Performance
Northumberland County, PA, USASet-Aside
Awardee
H&P Construction, IncAward Issued Date
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (34)
See All 34 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
NOTICE IS HEREBY GIVEN that sealed Bids shall be received from qualified Bidders on PennBid for the Ralpho Township Gym - ADA Accessible Entrance Project - Ralpho Township, Northumberland County and all appurtenant Work, in strict accordance with the Contract Documents on file at the office of the Engineer, Peters Consultants, Inc., 2701 Columbia Boulevard, Bloomsburg, PA 17815.
DATE OF OPENING BIDS: Bids shall be received by Ralpho Township via PennBid at http://PennBid.Bonfirehub.com until 11:00 A.M. local time on July 28, 2025. Bids will be opened at that time at the office of the Engineer, Peters Consultants, Inc., 2701 Columbia Boulevard, Bloomsburg, PA 17815. They will be reviewed and awarded at the 6:30 P.M. Ralpho Township Special Meeting on July 28, 2025 contingent upon Seda-COG’s approval of the bid for compliance with CDBG funding regulations.
LOCATION OF THE WORK: The Work to be constructed hereunder is located at the Ralpho Township Gym, 206 South Market Street, Elysburg, PA 17824. The Contractor will be responsible for obtaining and paying for any required permits.
DESCRIPTION OF THE WORK: The Work comprises the use of Community Development Block Grant funds to update the rear entrance and make it ADA accessible. This includes the demolition of the existing concrete stairs and pad at this entrance along with handrails, the roof over the concrete stairs along with all posts, the wind block, a downspout, associated walls and foundations and removal of existing electrical outlet, wiring and conduit up to the service panel. Following the demolition, the work includes the construction of a concrete ADA ramp, foundations, concrete block walls and landing with stainless steel handrails, new concrete stairs with stainless steel handrails, sawcutting of the paved parking lot for the installation of the concrete ADA ramp and stairs, a new canopy roof and posts with built in gutter and downspouts, steel filled with concrete bollards, new vertical siding over T1-11 at three locations, installation of a Norton 5740K3 Power Operator Kit to the existing exterior door, pavement restoration where parking lot was sawcut for new structures to be installed, ADA compliant handicapped parking space with accessible way and paint, concrete tire stop and ADA signage and paint, relocate of two (2) existing lights and one (1) security camera to below new canopy roof, install one (1) new light fixture, workmanship and all appurtenances for a complete job in accordance with Manufacturer’s instructions and the Contract Documents.
COMPLETION OF WORK: Time is of the essence. The Work must be substantially signed, dated and approved on the Notice of Substantial Completion Form by the Engineer, Contractor and Owner within 90 calendar days after the commencement date stated in the Notice to Proceed. Liquidated damages will be assessed for each calendar day for failure of the Contractor to substantially complete the Work within the calendar days reserved for the Contract and/or for failure to sign and date the Notice of Substantial Completion Form.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
