Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from City of Palm Springs was posted on October 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ramon Road Bridge at Whitewater River Project -Construction Management Services.

Closed
RFP 08-25 CMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 7 hours ago

DEADLINE

in about 1 month

General Info

Place of Performance

3200 E. Tahquitz Canyon Way, Palm Springs, CA, 92262, USA

Set-Aside

NONE

Documents

4

City of Palm Springs Quality Assurance Plan (QAP) - Attachment A

PDF, High priority: read this firstspecifications
High

City Project 08-25 - Required Forms (Attachments B-F)

PDF, High priority: read this firstrfp
High

Project 08-25 - Sample Professional Services Agreement

PDF, High priority: read this firstcontract-document
High

RFP 08-25-CM: Construction Management Services - Ramon Road Bridge

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEngineering Department of City of Palm Springs
Contacts1 person available
OfficePalm Springs, CA, 92262, USA
Office AddressPalm Springs, CA, 92262, USA
Contacts

Interested Companies (82)

PsomasSanta Ana, CA
Petra GeosciencesCosta Mesa, CA
CHA ConsultingDoral, Florida

See All 82 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work on the Ramon Road Bridge at Whitewater River involves widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the Whitewater River Channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. The limits of road way widening extend from San Luis Rey Drive to Landau Boulevard. Scope of work under this RFP includes comprehensive Construction Management services for the Ramon Road Bridge at Whitewater River Project. This includes developing project staging and traffic control plans, implementing a Quality Assurance Program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach. The selected firm will provide inspection services to ensure compliance with contract documents and environmental monitoring to meet CEQA and NEPA requirements, as well as all applicable environmental permits. The firm will also manage public engagement, including a project website, hotline, and community meetings. The Selected firm will oversee material testing, ensure ADA compliance, coordinate with utilities, and manage all construction closeout services, such as final inspections and transitioning the project to City maintenance. All services must meet industry standards and applicable laws, including prevailing wage requirements.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS