Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on October 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RDW24086 - Livable Streets 5-9

Closed
RDW24086State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; construction and utility tasks including tunneling, boring, jacking, and cathodic protection; and surface improvements such as asphalt paving, lighting, and landscaping. Additionally, the project requires various materials and support services, including ready mix, precast concrete, traffic control, and storm water pollution prevention. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a bid submission deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract involves a comprehensive street improvement project within Salt Lake City, focusing on Zones 5 through 9, which encompass specific areas including between 1300 South and 1700 South from West Temple to State Street, between 700 North and 400 North from Morton Drive to Redwood Road, between 600 North and 300 North from 1400 West to 1000 West, between 400 South and 900 South from 300 West to 500 West, and between Pacific Avenue and 800 South from Redwood Road to Cheyenne Street. The scope of work primarily includes the removal and replacement of existing infrastructure such as concrete and asphalt pavement, curb and gutter, bulb outs, speed bumps, and street crossing enhancements to improve safety, accessibility, and livability of the streets. The project aims to implement traffic calming measures and pedestrian-friendly features, guided by detailed engineering plans, construction drawings, and technical specifications provided in the project manuals. Bidders are invited to submit sealed unit price bids by October 29, 2025, with the opportunity for a pre-bid conference scheduled for October 21, 2025. The procurement process emphasizes compliance with safety and accessibility standards, including ADA requirements, and provides multiple avenues for bid submission and inquiries. The contract size is estimated between five and ten million dollars, and the project is managed by the Salt Lake City Department of Community & Neighborhoods Engineering Division. The project documentation includes detailed technical plans, construction notes, and legal requirements to ensure proper execution of street improvements across the designated zones, ultimately aiming to enhance the urban environment through targeted infrastructure upgrades and traffic calming features.

General Info

Documents

3
PDF, High priority: read this first1 page · presolicitation
High
PDF, High priority: read this first157 pages · ifb
High
PDF, Low priority60 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → Salt Lake City Corporation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
A. The locations of the work are: Zone 5: Between 1300 South and 1700 South from West Temple to State Street, Zone 6: Between 700 North and 400 North from Morton Drive to Redwood Road, Zone 7: Between 600 North and 300 North from 1400 West to 1000 West, Zone 8: Between 400 South and 900 South from 300 West to 500 West, Zone 9: Between Pacific Avenue and 800 South from Redwood Road to Cheyenne Street in Salt Lake City. B. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances indicated in the Contract Documents. The Work generally includes but is not limited to: remove concrete and asphalt pavement, curb and gutter, asphalt paving, bulb outs, concrete flatwork, speed bumps and street crossing improvements.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS