Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Ready-Mix Concrete Supplier

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement establishes a partnership with a ready-mix concrete supplier to provide specialized concrete mixes for prime contractors working on Glynn County BOC facility projects. The supplier is responsible for the manufacture and delivery of foundation mix ranging from 400 to 500 psi, slab mix at 300 psi, and ball stop pole concrete reaching 3000 psi at 30 days. All materials must adhere to ACI 318-19 standards and utilize 1 inch and 3/4 inch nominal max aggregate as specified. Managed by the Engineering Services Division of Georgia, the contract falls under NAICS code 327320. The solicitation was posted on October 16, 2026, with a response deadline set for November 12, 2026. The selected supplier will be tasked with the direct delivery of all ready-mix concrete to the designated project sites.

General Info

Documents

This scope was carved out of IFB27-014.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mallery Park Ballfield Renovations and Drainage Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → ENGINEERING SERVICES DIVISION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies specified concrete mixes for prime contractors on Glynn County BOC facility projects. Manufactures and delivers foundation mix (400-500 psi), slab mix (300 psi), and ball stop pole concrete (3000 PSI at 30 days) meeting ACI 318-19 standards. Utilizes 1" and 3/4" nominal max aggregate as specified. Delivers ready-mix concrete to the project site.

Similar Contracts

Same NAICS industry code

More opportunities from Georgia → ENGINEERING SERVICES DIVISION

Same awarding agency

NAICS: 237110
New
SLED
Mallery Park Ballfield Renovations and Drainage Improvements
Solicitation # IFB27-014
Solicitation IFB27-014, issued by the Glynn County Board of Commissioners through the Engineering Services Division, seeks a contractor for specific infrastructure improvements at Mallery Park on St. Simons Island, Georgia. The scope of work is strictly limited to the installation of the storm drainage system, 4-inch concrete sidewalks, and associated concrete flatwork. All other park renovations, including baseball field construction, lighting, landscaping, and demolition, are explicitly excluded from this bid package. The project aims to resolve existing drainage concerns and improve pedestrian accessibility to enhance the long-term usability of the recreational facility. The contract will be awarded based on a lump sum bid submitted via the county's e-procurement portal by November 12, 2026. A critical requirement for eligibility is pre-qualification; any bidder not pre-qualified by October 27, 2026, will be disqualified. Required submission documents include a representation affidavit, legal and character qualifications, and a bid bond of at least 5% for contracts exceeding $100,000. The successful contractor must maintain comprehensive insurance, name the owner as an additional insured, and implement a policy providing equal opportunity for small and minority-owned businesses. Performance will be measured against the provided construction plans, with final acceptance determined by the owner upon written notification that all work meets contract specifications.
Water and Sewer Line and Related Structures Construction

POSTED

about 17 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237990
SLED
East Beach Massengale Park Boardwalk
Solicitation # IFB27-011
The East Beach Massengale Park Boardwalk project, solicited by the Glynn County Board of Commissioners under solicitation IFB27-011, involves the demolition of an existing structure and the construction of a new elevated boardwalk and beach access pier in Brunswick, Georgia. The project aims to improve pedestrian access to the beach while protecting environmentally sensitive areas, including tidal pools, wetlands, and sand dunes. This is a lump sum, all-inclusive contract requiring strict adherence to environmental permits, the Georgia State Shore Protection Act, and AWPA and ASTM standards for treated timber marine pilings. The intended award date is December 17, 2026, with a response deadline of November 4, 2026. Award will be granted to the lowest responsive and responsible bidder, provided they have completed the mandatory pre-qualification process for Public Works Construction Projects. Bidders must submit several required documents, including a Representation Affidavit, Georgia Security and Immigration affidavits, and a Supplier Oath. For bids exceeding 100,000 dollars, a bid bond of at least five percent is required, and local vendor preferences are not applicable. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and maintain comprehensive insurance naming the owner as an additional insured. Contract administration includes a 30-working-day payment cycle following approval by the Contract Technical Representative, with a potential ten percent retainage. The contract stipulates liquidated damages of 300 dollars per calendar day for delays and includes a twelve-month warranty period following final acceptance. Construction activities are subject to site inspections, including daily morning monitoring by a species monitor, and all materials must be stored on wooden skids to prevent ground contact.
Other Heavy and Civil Engineering Construction

POSTED

11 days ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS