Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rebid: B617 Install Solar And Battery Sys (POM 23-035)

Closed
73411State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the engineering, design, installation, testing, and commissioning of a series of solar and battery energy storage systems at two locations, B617 and B624, within the Presidio area. The primary scope includes a 60 kW DC solar and 200 kWh battery system at B617, along with two additive alternates: a 30 kW DC solar and 100 kWh battery system at each of the B624 locations. Both sites are connected through a limited 4kV circuit that links multiple buildings, with the metering point situated near the Franklin Street Gate. The project aims to enhance renewable energy capacity and grid resilience in the specified area. The solicitation, titled "Rebid: B617 Install Solar And Battery Sys (POM 23-035)," was posted by Monterey Public Works under the California agency, with a project size estimated between $500,000 and $1.5 million. The solicitation was issued on June 3, 2025, with a response deadline of June 17, 2025. The NAICS code associated with this project is 541330, indicating engineering services. Interested vendors can contact Parker Lovett via email or phone for further details, and additional project information is available through the provided online portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Monterey Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing, and commissioning of a 60 kW DC solar and 200 kWh battery system on B617, a 30 kW DC solar and 100 kWh battery system (Additive Alternate 1), and another 30 kW DC solar and 100 kWh battery system (Additive Alternate 2) on B624. Both B617 and B624 are part of the limited 4kV circuit that interconnects several buildings in the Presidio and the meter is located near the Franklin Street Gate (See aerial map in Part IV, Page 27).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS