Rebid of Demolition & Site Restoration: Former Government Station

Active
2026-GEN-066State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

TARTA is soliciting bids for the demolition and site restoration of the former Government Station in Toledo, Ohio, with work including the complete removal of the glass-and-steel canopy and the full demolition of the restroom building, followed by the construction of a new masonry wall to restore the site. Contractors must be qualified to handle all aspects of this project, from hazardous material handling to debris removal and site grading. If the awarded contract exceeds $100,000, the successful bidder is required to execute a Project Labor Agreement prior to commencement of work. The solicitation, numbered 2026-GEN-066, was posted on July 31, 2026, and bids are due by August 14, 2026, at 7:00 PM Eastern Time. The project falls under the jurisdiction of the Ohio Facilities Maintenance agency, with primary point of contact being Spencer Eagle, Buildings and Grounds Manager, reachable at 419-277-0446 or seagle@tarta.com, and secondary contact Zach Morrison, Procurement Manager, at 734-770-2770 or zmorrison@tarta.com. All work must be performed at the site located in Toledo, Ohio, with no alternate performance locations permitted.

General Info

Demolish canopy and restroom, build masonry wall, hazardous removal, site grading, PLAG required over $100K, Toledo, Ohio.

Agency

Ohio → Facilities MaintenanceView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

OH, USA

Set-Aside

NONE

Documents

(4)

Clock.png

PNG

TARTA_Government_Station_Cost_Proposal_Schedulefinal.xlsx

XLSX

Lobbying Certification for Federal Contracts

PDFcertification

Declaration of Non-Collusion for Bid Submission

PDFdeclaration-of-non-collusion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Facilities Maintenance
Contacts2 people available
OfficeToledo, OH, 43610, US
Organization / Agency
Ohio → Facilities Maintenance
View Agency Profile
Office AddressToledo, OH, 43610, US
Contacts
Spencer EagleBuildings and Grounds Manager
Zach MorrisonProcurement Manager

Interested Companies (2)

Show more
Builders Exchange of Michigan
Grand Rpaids, MI
Builders Exchange
Valley View, OH

Full Description

Show more
TARTA seeks proposals from qualified contractors to demolish and remove the former Government Station structures and restore the site, including removal of the glass-and-steel canopy, full demolition of the restroom building, and construction of a replacement masonry wall. If the cost of the project is over $100,000, then a Project Labor Agreement (PLA) must be executed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.