Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Vermont was posted on July 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoulder Berm Removal

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves the removal of shoulder berms along 2,500 linear feet of roadway to restore proper sheet flow and drainage, requiring grading and the complete removal of accumulated soil and vegetation. This work is critical to ensuring effective water management and preventing erosion or flooding along the affected roadway segment. The project is classified as a subcontract under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and is being managed by the Vermont Department of Economic Development. Bids must be submitted by August 6, 2026, with the solicitation posted on July 31, 2026. The place of performance and contact details are not specified, and no set-aside provisions are indicated, meaning all eligible contractors may compete. Interested parties can access further details through the provided Vermont Business Registry link.

General Info

Remove shoulder berms over 2,500 linear feet for drainage, bid due August 6, 2026.

Documents

This scope was carved out of 74011.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

South Hill Ditching Grant

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Remove shoulder berms along 2,500 linear feet of roadway to restore proper sheet flow and drainage, including grading and removal of accumulated soil and vegetation.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 237110
New
SLED
Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation
Solicitation # 1697-001
The Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation project is a general construction contract issued by the Department of Economic Development for the State of Vermont. The scope of work involves comprehensive improvements to the water system at 339 Carter Street in Barnet, Vermont, including modifications to the water treatment building, component upgrades, SCADA integration, relocation of existing components, underground piping, and associated site work. The project is funded in part through the Vermont Drinking Water State Revolving Fund and is managed by MSK Engineers. Bids must be submitted by December 3, 2026, at 2:00pm local time to the Barnet Town Hall or via the specified mailing address. Awardees are required to provide bid security and both performance and payment bonds totaling 100 percent of the contract price. The contract is subject to several federal mandates, including the Davis-Bacon Act for wage rates, Disadvantaged Business Enterprise requirements, and the Build America, Buy America Act and American Iron and Steel provisions, which mandate that iron, steel, and construction materials be produced in the United States. Additionally, the project adheres to prohibitions on certain telecommunications and video surveillance services or equipment.
Water and Sewer Line and Related Structures Construction

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS