Recharge Master Plan Update (RMPU) Basin Improvements Project Montclair Basin Improvements

Active
20260922046State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Inland Empire Utilities Agency (IEUA) is soliciting bids for the Recharge Master Plan Update Basin Improvements Project, specifically focusing on the Montclair Basin Improvements (Project No. RW15003.03). Located in Montclair, California, the project aims to divert storm flows from the San Antonio Creek Channel into Montclair Basins 2 and 3 for groundwater recharge. The scope of work includes the installation of two diversion drop inlets excavated 8 to 10 feet below the channel floor, the placement of 4-foot-diameter discharge pipelines covered with 3 feet of soil, and the construction of concrete outlet structures for flow dissipation. Additionally, the contractor must integrate electrical, instrumentation, and SCADA controls to actuate the basin gates, with programming performed by approved integrators. This firm-fixed-price contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted via PlanetBids by 2:00 p.m. on October 29, 2026, and must include a bidder's bond for 10 percent of the total bid, a non-collusion affidavit, and CARB certification. The project is subject to stringent regulatory requirements, including Buy America Build America (BABA) and American Iron and Steel (AIS) preferences, State Prevailing Wage and Federal Davis-Bacon requirements, and Disadvantaged Business Enterprise (DBE) utilization goals. Compliance with the Trafficking Victims Protection Act and various federal and state non-discrimination laws is mandatory. The successful bidder must provide performance and payment bonds within ten calendar days of the notice of award.

General Info

IEUA seeks bids for Montclair Basin groundwater recharge improvements by October 29, 2026.

Documents

(2)

IFB-JV-26-015: Montclair Basin Improvements (RW15003.03)

PDF•ifb

IFB-JV-26-015_RW15003.03 Vol 2 - Plans

PDF•specifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Inland Empire Utilities Agency
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #IFB-JV-26-015 / RW15003.03: The project involves constructing improvements at Montclair Basins 2 and 3 to divert storm flows from the San Antonio Creek Channel for groundwater recharge. The work includes installing two diversion structures (drop inlets) in the San Antonio Creek Channel, constructing them across the 25-foot concrete channel, and excavating 8-10 feet below the channel floor. Steel grates will be installed over the structures to prevent debris, and wall-mounted steel gates will be provided. Four-foot-diameter discharge pipelines will be installed from each structure to Basins 2 and 3, routed across a gravel access road and basin slopes. Concrete outlet structures will be constructed in the basins for flow dissipation, and piping along basin slopes will be covered with 3 feet of soil. The project also requires all electrical, instrumentation, and SCADA controls integration to actuate the Basin 2 and Basin 3 gates, with programming to be performed by an approved controls integrator.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity targeting DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the use of consortia for larger contract portions. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors must agree to the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company. The prime contractor may require payment and performance bonds totaling 100 percent of the bid, with bond premiums reimbursed up to a maximum of 1.5 percent. The primary point of contact for this solicitation is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 6 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Inland Empire Utilities Agency

Same awarding agency

NAICS: 237110
New
SLED
DCZ-1/1 Monitoring Well Rehabilitation
Solicitation # IFB-JV-26-017
The Inland Empire Utilities Agency (IEUA) has issued Invitation for Bid IFB-JV-26-017 for the mechanical and chemical rehabilitation of Monitoring Well DCZ-1/1, located at the Declez Groundwater Recharge Basin in Jurupa Valley, California. The primary objective is to restore groundwater flow and resolve excessive drawdown to support regulatory compliance sampling. The scope of work includes mechanical cleaning using a 3.5-inch dual swab and nylon brush assembly, airlifting to remove residual muds and chemicals, and the administration of sodium hypochlorite and mud dispersant chemicals. All chemicals used must be PFAS-free and ANSI/NSF 60 certified, with Safety Data Sheets submitted three days prior to use. Performance will be verified through well video surveys, and the project is governed by technical specifications from Woodard & Curran. This is a prevailing wage contract requiring all contractors and subcontractors to be registered with the California Department of Industrial Relations. Bids must be submitted electronically via PlanetBids by October 1, 2026, and must include a fully burdened fee schedule, a non-collusion affidavit, and the offeror's Experience Modification Rate for the three most recent rating periods. Evaluation is based on cost, past performance via three references from the last five years, and safety history. Payment is handled electronically via ACH within 30 days of invoice approval by the Project Manager, with an option for expedited payment in exchange for a discount. The contract utilizes a fixed-pricing structure with a not-to-exceed total price and includes a 12,000 dollar allowance for additional development.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS