Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Reconstruction of Richmond Street from Windermere Rd to Huron St

Active
BT-RFP-2026-027Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of London is seeking proposals for the reconstruction of Richmond Street between Windermere Road and Huron Street under solicitation BT-RFP-2026-027, posted on July 10, 2026, with responses due by July 30, 2026. This federal procurement is managed by the Government of Canada through the City of London as the implementing agency, and it involves significant infrastructure upgrades to a key urban corridor. The project requires comprehensive civil engineering work including roadbed reconstruction, drainage improvements, utility upgrades, and pavement resurfacing, with specific technical standards and performance requirements outlined in the referenced documents. Proposals must be submitted by the deadline, and all bidders are expected to demonstrate qualified experience, compliance with applicable regulations, and capacity to deliver the project within the specified timeline and budget. Darren Mockler, the Contracting Authority, serves as the primary point of contact for inquiries and can be reached via email at dmockler@london.ca or by phone at 1111111111. The procurement is open to eligible vendors without a specific set-aside classification, and interested parties are directed to the official CanadaBuys portal for full solicitation details. The place of performance is clearly defined as the stretch of Richmond Street in London, Ontario, with no additional regional or jurisdictional constraints indicated. All contractors must ensure compliance with municipal, provincial, and federal regulations regarding construction, environmental protection, and public safety during project execution.

General Info

City of London seeks bids for Richmond Street reconstruction between Windermere and Huron, due July 30, 2026.

Agency

Government of Canada → City Of LondonView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City Of London
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City Of London
View Agency Profile
Office AddressN/A
Contacts
Darren MocklerContracting Authority

Full Description

Show more
Refer to Documents

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a wide range of asphalt paving, restoration, and related infrastructure services to be performed across multiple sites within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road water drainage systems. Permits may be required for certain elements of the drainage improvements. All tasks are to be executed under a unit price structure for the fiscal year 2026, with performance obligations spanning the entire Port-wide footprint. The contract is issued by the Port of Seattle through its Port Construction Services division, with primary administrative and technical contacts listed as Heather Bowden and Lesley Miles. The solicitation is posted as a forecast with a NAICS code of 237310, indicating it is classified under Highway, Street, and Bridge Construction. There is no specified set-aside type or solicitation number provided. The work is intended to maintain and enhance airport and maritime infrastructure safety, functionality, and appearance. All activities must comply with applicable regulations and site-specific requirements, and vendors are expected to handle logistics including material delivery, equipment mobilization, waste removal, and coordination with Port operations to minimize disruption.
Port Construction Services

POSTED

about 7 hours ago

DEADLINE

N/A
View Details