Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reconstruction of Thayer Hall at the United States Military Academy, West Point, New York

Closed
W912WJ26X0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 12 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

West Point, NY, 10996, USA

Set-Aside

NONE

Documents

2

Sources Sought Notice for Reconstruction of Thayer Hall at West Point

PDF, High priority: read this first5 pages · sources-sought
High

Sources Sought: Reconstruction of Thayer Hall (General Instruction Facility)

PDF, Low priority5 pages · sources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Dec 23, 2025 to Jan 2, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA

Full Description

Show more

Subject:  Reconstruction of Thayer Hall (General Instruction Facility)
NACIS Code:  236220 (Institutional Building Construction)
Response date: 2 January 2026
Place of Performance: United States Military Academy, West Point, New York


US Army Corps of Engineers, New England District
696 Virginia Road
Concord, MA
01742-2751 US


The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services of a Reconstruction of Thayer Hall (General Instruction Facility) at West Point, NY. This announcement is to determine interest, availability, and capability of Small Business and Large Business concerns for this project. The NAICS code for this procurement is 236220. The project is planned to be issued in the Summer of 2026 with demolition/reconstruction to begin in early in 2027. The estimated construction cost is over $500,000,000.


The project will be constructed within the access-controlled installation of West Point, NY. The impacted building will be deconstructed and reconstructed within the cadet central area of the United States Military Academy.  Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below:


1. Project Purpose and Program Context
This project is a major component of the Academic Building Upgrade Program (ABUP), which aims to modernize academic facilities and address critical instructional space shortages at the U.S. Military Academy (USMA). USMA currently faces a deficit of 412,799 square feet of general instructional space; the reconstruction of Thayer Hall will help reduce this gap while supporting a student load of 2,880 cadets.  The project will also consolidate key academic programs into a single, modernized facility. Centralizing instruction and support functions will minimize departmental fragmentation, improve operational efficiency, and foster greater cross-disciplinary collaboration. This design approach aligns with current educational trends that prioritize flexible, multi-purpose spaces to support interactive and innovative learning environments.
________________________________________
2. Existing Conditions and Demolition Scope
Thayer Hall consists of an original 1911 structure and a later addition constructed in 1955. The project requires demolition of the 1955 portion, totaling 321,012 square feet. This demolition will involve careful coordination due to significant impacts to the granite and stone exterior façade, requiring a combination of deconstruction, repair, and preservation.  The surviving features of the 1911 structure will be rehabilitated and preserved wherever feasible to maintain the historical integrity of the building. The reconstructed facility will remain compatible with the original building’s historic materials, architectural features, scale, massing, and proportions.
________________________________________
3. Reconstruction Scope and Facility Capabilities
The project includes the deconstruction and reconstruction of the General Instruction Building to create a modern, expanded academic facility. The new building will house a comprehensive set of academic, administrative, and support functions, including:
•    Academic Spaces: general instruction classrooms, lecture halls, labs, collaboration areas, and a library with a mock courtroom.
•    Administrative Areas: private and open offices, conference rooms, and departmental support rooms.
•    Support and Specialty Areas: auditorium, arms vault, reception areas, staff break rooms, copy rooms, storage areas, lactation rooms, showers and restrooms, vending areas, and a café.
•    Vertical Transportation: freight and passenger elevators.
Original 1911 features will be rehabilitated and integrated into the new design wherever feasible.
________________________________________
4. Building Systems, Utilities, and Site Improvements
The facility will be equipped with modern building systems including cybersecurity features, Electronic Security Systems (PACS and IDS), Energy Measurement and Control System (EMCS) integration, building information systems, and fire alarm and suppression systems.
Supporting site work will include new utility connections for water, sanitary sewer, and electrical systems; storm drainage improvements; walkways; curbs and gutters; landscaping; and general site enhancements. Heating will be supplied through the district heat system, and cooling will be provided via a steam-powered absorptive chiller.  Utility connections will tie into privatized electric, water, and wastewater systems. The respective Utilities Privatization System Owners—American Water and City Light & Power—will construct and own the utilities up to the facility service disconnect or other defined demarcation point.
________________________________________
5. Design Standards and Performance Requirements
The facility will be fully designed for accessibility and usability by individuals with disabilities.  All work will meet the DoD Unified Facilities Criteria (UFC 1-200-02), ensuring compliance with performance requirements for sustainability, energy efficiency, building envelope integrity, and integrated systems. The facility will be designed for a minimum service life of 40 years.
________________________________________
6. Acquisition Strategy and Contracting Approach
The acquisition approach incorporates early contractor involvement utilizing the federal government’s Integrated Design and Construction (IDaC) framework to support design completion and ensure constructability. The solicitation will be issued at approximately 15% design.
The base contract will include construction management services, providing design reviews at the 60%, 90%, and 100% stages. Two options will be included:
•    Demolition Option: awarded immediately after the base contract is issued.
•    Construction Option: negotiated within an agreed-upon ceiling price after completion of the 100% design, aligned with the end of the demolition phase.


Another proposed procurement method is Design-Build to Budget.  This approach utilizes early contractor involvement between a designer and constructor to ensure design completion and constructability within a fixed budget.  Firms are invited to comment on the use of Design-Build to Budget as the proposed procurement method.  Areas of particular interest to the government are responses to the following questions:  


1. How would utilizing the Design-Build to Budget procurement method affect your decision to propose on this effort?
2. What qualifications would you expect for a designer on a project of this magnitude?
3. If this procurement method was utilized, how do you think it would affect the procurement and construction schedules?
 



USACE is specifically assessing the capability and interest of:
•    Small Businesses under the applicable size standard
•    8(a) Small Business Development Program participants (with an SBA approved district office)
•    Historically Underutilized Business Zone (HUBZone) Small Businesses
•    Service-Disabled Veteran-Owned Small Businesses (SDVOSB)


Other Than Small Businesses (OTSB’s): If you choose to respond, please include recommended subcontracting goals (percentages of total contract value) for each applicable socio-economic category (e.g., Small Business, Small Disadvantaged Business, WOSB/EDWOSB, HUBZone, SDVOSB, VOSB). These recommendations are for planning purposes only and will inform the Government’s goal development.


Small Businesses do NOT need to submit subcontracting goals.


Interested firms should submit a capabilities package to include the following:  business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include up to three specific examples of the firm’s experience performing the work requirements stated above. The projects must have been performed within the last seven years.  Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, which will be used to support the offeror’s effort and their experience must also have been performed within the last seven years. Proof of bonding capability is required. 


Additionally, please comment on the use of a Project Labor Agreement (PLA). A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Agencies may use PLAs to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14063, Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, agencies are required to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects, unless waived by a senior official.


The use of a PLA applies to both small and large businesses and is appropriate if the use of project labor agreements will:
1.    Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and
2.    Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement.


Some of the factors that may be considered regarding PLA use are:
a)    The involvement of multiple contractors and/or subcontractors working in multiple crafts or trades.
b)    The complexity of the project.
c)    Shortage of skilled labor in the region.
d)    Completion of the project will require an extended period of time.
e)    The use of PLAs on other comparable projects in this geographic area.
f)    The promotion of the Governments long term programs interests such as training of skilled workforce for future projects.
g)    The possibility of labor disputes that threaten timely completion.
h)    Additional costs from use of PLAs may be cost prohibitive.


In consideration of the above factors, and any others which may be deemed appropriate, firms are invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions:
a)    Should a PLA be executed on the above project? What benefits do you believe a PLA could achieve? What other factors should the Corps consider before deciding to include PLA provisions for the construction project?
b)    Will the use of a PLA be effective in achieving economy and efficiency? If so, how? What is the estimated relative cost impact, or any other economies or efficiencies derived by the Federal Government, if using a PLA? Will a PLA impact the cost of submitting an offer?
c)    Are there any concerns regarding labor-management stability related to this project? Will the use of a PLA produce labor-management stability on this project? Have labor disputes or other labor issues contributed to project delays in the local area? Are you aware of examples of labor-management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve? What market share does union labor in construction trades have in the geographic area? Which existing Collective Bargaining Agreements will expire during construction of this project?
d)    Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts?
e)    This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades; do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade?
f)    Are there any concerns by prime contractors on the availability of skilled construction labor? Are there large scale construction projects in the area (over $25M, within 50 miles) which could impact availability of skilled labor for this project? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Are existing apprentice programs providing sufficient numbers of skilled workers for future requirements?
g)    Is the proposed schedule/completion time one which would benefit from a PLA - if so, how? Will a PLA impact the completion time? Would a PLA benefit a project which contains a unique and compelling mission-critical schedule?
h)    Are you aware of comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of this project? For each project, please indicate if a PLA was used, the initial and final cost, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc...
i)    Will the use of PLAs impact the ability of potential offerors and subcontractors to meet small-business utilization goals?
j)    Will inclusion of PLA requirements affect your decision to submit a proposal for this project? If so, please detail how it will affect your decision.


k)    Would the use of either Integrated Design and Construction (IDaC) or Design-Build to Budget approaches influence your support or lack of support of the use of a Project Labor Agreement (PLA) for this project?


Respondents to this Sources Sought are advised that any/all documents related to the use of a project labor agreement for the subject contract become records of the Government and the Freedom of Information Act (FOIA) requirements may apply to the release of PLA market research results.


Responses are limited to twenty pages. Responses are due by January 2, 2026. Responses should be emailed to:


Brian Mannion:  Brian.T.Mannion@usace.army.mil


Interested firms shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.  


Government Agency URL: www.nae.usace.army.mil 
Government Agency URL Description: New England District, US Army Corps of Engineers
 

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a Request for Quotations issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. This firm-fixed-price contract is a total small business set-aside under NAICS code 237310, with an estimated construction magnitude between $25,000 and $100,000. The project requires the contractor to provide all equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The period of performance is 210 calendar days from the notice to proceed, with work hours restricted to Monday through Friday, 7:00 AM to 3:30 PM. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit a comprehensive quote including technical documentation, price, and past performance from the last three years. Key safety and compliance requirements include adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer designation letter within 21 days of the notice to proceed. Fieldwork cannot commence until all submittals are approved. Award will be based on the most advantageous offer considering price, technical capability, and past performance. Payments will be processed electronically through the Wide Area WorkFlow system.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Solicitation # W912WJ26RA008
Solicitation W912WJ26RA008 is a firm-fixed-price construction project for the Phase A2 Chilled Water Plant Replacement and Site Utility Upgrades at the VA Medical Center in West Haven, Connecticut. The scope includes the demolition of the existing chilled water plant and the construction of a new multi-story facility featuring chillers, cooling towers, pumps, and a new fuel tank farm. Site utility upgrades involve replacing fire protection and domestic water mains, creating utility main loops for chilled water, steam, condensate, and fire protection, and installing redundant electrical feeders and new water storage tanks. The project must adhere to DVA Physical Security Resiliency Design Requirements and is expected to achieve USGBC LEED Silver certification. Because the work occurs within an active medical campus, strict coordination is required to minimize operational impacts. The estimated contract value ranges from 75 million to 150 million dollars. Award is based on a best-value tradeoff process, with non-price factors—Past Performance, Management Approach, and Small Business Participation—combined being significantly more important than price. A minimum small business participation rate of 10 percent is mandatory for eligibility. Due to campus integration needs, the government has issued several justifications for other than full and open competition to require brand-name products from Johnson Controls, Siemens, and Assa Abloy, as well as specific SCADA programming services from AMAZ Consulting. Proposals must be submitted electronically via the PIEE solicitation module in both native and PDF formats.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bid invitation for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. This 100 percent small business set-aside project, under NAICS 237990, has an estimated value between 1 million and 3 million dollars. The scope of work involves the mechanical removal of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders to achieve a depth of -7 feet Mean Lower Low Water, with an allowable overdepth bringing the maximum depth to -8 feet. All dredged material must be transported and disposed of at the Flake Island Ocean Disposal Site, located approximately 0.9 nautical miles northwest of the project site. Performance is restricted to an environmental window between September 15, 2026, and March 1, 2027, to protect benthic resources and federally managed species. The contractor is required to maintain a production rate of at least 4,000 cubic yards every 30 calendar days, operating 24 hours a day and seven days a week. Award will be based on the lowest price for the total estimated amount of mobilization and dredging line items, with a 10 percent price evaluation preference for HUBZone small business concerns. Key requirements include the provision of performance and payment bonds, the submission of a Contractor Quality Control Plan, and the hosting of a partnering session within 45 days of award. All proposals must be submitted electronically via the Procurement Integrity Enterprise Environment portal.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 238290
New
Federal
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT
Solicitation # W912WJ27QA001
The U.S. Army Corps of Engineers New England District is soliciting quotes for the installation and commissioning of a new power system for the Dike B Operator unit at Mansfield Hollow Dam in Mansfield Center, Connecticut. This fixed-price project, estimated between $25,000 and $100,000, is a total set-aside for small businesses under NAICS code 238290. The scope of work includes site preparation, the construction of a reinforced concrete generator pad, installation of secure perimeter fencing, and the procurement and installation of a standalone propane-powered generator and fuel storage tank. Additionally, the contractor must perform final electrical integration into the existing sluice gate operator unit and control panel, including the installation of a 100 Amp NEMA 3R pedestal-mount panelboard and a 480V to 120/240V step-down transformer. The period of performance is 300 days from the Notice to Proceed, with work restricted to weekdays from 7:00 AM to 3:30 PM. All work must comply with the National Electric Code and the USACE Safety and Health Requirements Manual EM 385-1-1. To be considered responsive, vendors must have an active SAM.gov registration and submit a completed solicitation survey detailing their experience, certifications, and past performance from the last three years. Quotes are due by November 5, 2026, and will be evaluated based on technical capability, price, and past performance. Payment will be processed electronically through the Wide Area WorkFlow system.
Other Building Equipment Contractors

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS