This Solicitation opportunity from Department Of Agriculture was posted on June 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reconstruction of Trail of 100 Giants Boardwalk & Freeman Creek, Sequoia National Forest, California

Closed
12970224R0050Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 9 hours ago

DEADLINE

in about 19 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 10 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Porterville, CA, USA

Set-Aside

SBA

Documents

9

Attachment 1 Statement of Work - Trail of 100 Giants and Freeman Creek Trail

PDF, High priority: read this first4 pages · sow
High

Fire Plan for Construction and Service Contracts

PDF, High priority: read this first9 pages · sow
High

Pricing Worksheet - Schedule of Items: Sequoia National Forest

XLSX, High priority: read this first1 page · specifications
High

Proposed Progress Schedule - 100 Giants Boardwalk & Freeman Creek Trail Bridge Reconstruction

RTF, High priority: read this first1 page · specifications
High

Reconstruction of Trail of 100 Giants Boardwalk and Freeman Creek Trail Bridge Drawings

PDF, High priority: read this first11 pages · specifications
High

SF 1442 Solicitation and Award - 100 Giants Boardwalk & Freeman Creek

PDF, High priority: read this first38 pages · contract-document
High

Trail of 100 Giants Boardwalk and Freeman Creek Trail Bridge Supplemental Specifications

PDF, High priority: read this first38 pages · specifications
High

Wage Determination CA20240021 - Tulare County, California

PDF, High priority: read this firstwage-determination
High

Biobased Statement Letter

DOCX, Low priority2 pages · supporting-document
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
Contacts1 person available
OfficeWashington, DC, 20250, USA
Office AddressWashington, DC, 20250, USA
Contacts
Kelly Ollivant

Full Description

Show more
Title: 100 Giants Boardwalk and Freeman Creek Trail Bridge Reconstruction, Sequoia National Forest, California Description: The awarded contractor shall provide all personnel, equipment, and materials to accomplish the work under this solicitation, resulting contract, and all attachments. The 100 Giants Boardwalk project includes construction of a 100' boardwalk with glued laminated beams in five (5) 20' spans on existing concrete abutments and piers to replace a structure that burned in the 2021 Windy fire. The Freeman Creek Trail project includes construction of a new 20' long by 6' wide timber trail bridge with glued laminated beams on existing abutments to replace a structure that burned in the 2020 Castle fire. Site Visit: No pre-solicitation site visit will be scheduled for this project. Interested vendors are encouraged to scout all haul routes to this project, consult local road condition reports, and review all California State hauling regulations and requirements. For questions regarding site location, contact Pablo Baca Ceballos via email: pablo.bacaceballos.usda.gov. Magnitude of Construction Project: The price range of this project is between $25,000 and $250,000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS