This Government Contract opportunity from Department Of Defense was posted on March 11, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--56--Demolition of fifteen (15) Vault Toilets, located at various public use areas in the Harry S Truman Lake Project

Awarded
W912DQ-10-P-0049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the demolition, removal, and site restoration of fifteen vault toilets across several campgrounds and day use areas at the Harry S. Truman Dam and Reservoir, including Bledsoe Ferry, Long Shoal, Osage Bluff, Shawnee Bend, Sparrowfoot, and Thibaut Point. The contractor is responsible for providing all labor, equipment, and supervision necessary to demolish the structures and remove concrete foundations and sidewalks. While sewage pumping is handled under a separate contract, the contractor must haul lumber and shingle debris to a permitted landfill and provide weight tickets to the government. Concrete debris must be broken down and transported to designated burial sites within the park boundaries, with the exception of Bledsoe Ferry debris, which goes to the Shawnee Bend site. The contractor is required to excavate burial holes, backfill and level them for mowing, and restore the original vault toilet sites using government-furnished fill material to match surrounding ground contours. Work must be completed at one location before starting another unless government approval is granted, and the contractor must ensure all utility lines are protected during the process.

General Info

Contract Value

$12,880

NAICS

238910 - Site Preparation Contractors

Place of Performance

MO, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Kansas City
ContactsNo contacts available
OfficeKANSAS CITY, MO, 64106-2896, USA
Office AddressKANSAS CITY, MO, 64106-2896, USA
ContactsNo contact information available

Full Description

Show more
Vault Toilet Demolition, Removal, and Site Restoration HARRY S. TRUMAN DAM AND RESERVOIR Statement of Work Scope of Work: The services to be furnished under this procurement shall consist of a post-award conference, reports, meetings, daily worksheets, etc., and furnishing all labor, equipment, supplies, and supervision, as necessary to accomplish the demolition, removal, and site restoration of fifteen vault toilets located at Harry S. Truman Project. The vault toilets are located at Bledsoe Ferry, Long Shoal, Osage Bluff, Shawnee Bend, Sparrowfoot, and Thibaut Point Campgrounds and Day Use Areas. The Contractor shall perform tasks listed in Section C-5. Acceptable performance standards and current regulations are provided for each task. The Contractor shall monitor performance and ensure compliance in accordance with the terms and conditions. Contractor Furnished Equipment and Supplies The Contractor shall furnish all equipment and supplies not identified in Section C.3 of this PWS as Government-Furnished supplies and equipment and as specifically identified in this section. The Contractor shall furnish all transportation; power equipment with fuel; and all other supplies and equipment necessary to accomplish the services specified herein. All contractor furnished materials, equipment and supplies must be approved by the Contracting Officers Representative prior to initial use. Specific Tasks: The Contractor shall provide all equipment, labor, transportation and materials necessary to demolish fifteen vault toilets as listed. The square footage of concrete floors and sidewalks are estimates, not exact dimensions. The dimensions listed below for concrete do not include the vaults which also must be removed and buried as part of the demolition debris contract. Site Locations: Bledsoe Ferry Area BFE Dock ( First Parking Lot location) 17 x 26 x 6 concrete foundation in addition to vault BFE Ramp Parking Lot 17 x 26 x 6 concrete foundation in addition to vault Long Shoal Area LS - Beach 15 x 22 x 6 concrete foundation in addition to vault LS - Picnic Area 13 x 22 x 6 concrete foundation in addition to vault LS Boat Ramp 17 x 22 x 6 concrete foundation in addition to vault Osage Bluff Area OB Boat Ramp 13 x 22 x 6 concrete foundation in addition to vault OB Campground, Vault #2 13 x 22 x 6 concrete foundation in addition to vault OB Campground, Vault #3 13 x 22 x 6 concrete foundation in addition to vault Shawnee Bend Area SB Shelter #1 13 x 26 x 6 concrete foundation in addition to vault SB Shelter #2 12 x 26 x 6 concrete foundation in addition to vault Sparrowfoot Area SF Campground, Vault #11 12 x 26 x 6 concrete foundation in addition to vault SF Shelter Area, Vault #4 13 x 26 x 6 concrete foundation in addition to vault Thibaut Point Area TP Campground, Vault #15 12 x 26 x 6 concrete foundation in addition to vault TP Campground, Vault #16 12 x 26 x 6 concrete foundation in addition to vault TP Day Use Area, Vault #4 10 x 25 x 6 concrete foundation in addition to vault C.4.2 The vault toilets at the designated locations listed above shall be demolished. " The lumber and shingles from each vault toilet shall be hauled to a permitted landfill for disposal at the contractors expense. " The contractor shall provide the COR a copy of all landfill weight tickets. " All concrete vaults including approach sidewalks identified at the vault toilet site location and will buried. The removed sidewalk and vault toilet concrete debris shall be removed from the ground crushed or broken and hauled to the government designated burial site. The concrete shall only be crushed or broken small enough to be removed and hauled to the burial site. " Each campground/day use area will have its own burial site within the park boundaries for concrete burial, except Bledsoe Ferry, which shall be hauled to the Shawnee Bend burial site location. " All vault toilets will have the sewage pumped and removed under a separate contract. C.4.3 The contractor will dig the hole for the disposal of concrete vaults and sidewalks at the pre-established location within the park and cover the disturbed dig site area with the soil removed. The contractor will backfill and level the burial site, such that the excavated area can be mowed. Any vegetation or small trees that need to be removed in order to open the burial site shall be done by the contractor. C.4.4 The contractor shall remove both the demolished sidewalks and concrete vaults shall be hauled by the contractor to the designated burial sites. Trash receptacles may be required to be moved by the contractor if deemed necessary to prevent damage. The contractor shall be aware of water line and other utility lines and only disturb the ground necessary to remove the vault toilets and concrete. The government will locate and mark the utilities within the imitate location of the vaults. C.4.5 The contractor shall backfill the open vault toilet site with the government furnished material, and levels the site to match the surrounding ground contour ( backfill does not require a finish grade, nor seeding and mulching.). The Corps will provide fill material at each site for the contractor to use in restoration and compaction of the excavated hole. C.4.6 All demolition sites shall be opened and completed prior to the opening of another location. Multiple site openings must receive the governments approval prior to the commencement of work. C.5.1 MAP: Information on Truman Lake can be found on the Internet at http://www.nwk.usace.army.mil/harryst/hst_home.htm C.5.2 Memorandum Receipt, ENG 4866 (Completed Sample form) Technical Enclosure 1: Performance Requirements Summary Section (Para) Contract Requirement Performance Standard Lot Description ALP Method of Surveillance C.4.1 and C.4.2 Demolish fifteen vault toilets. All vault toilets shall be demolished and concrete vaults removed from the ground. Vault Toilet 2% 100% C.4.2 Remove and dispose of vault toilet demolition debris. The lumber and shingle debris shall be removed off-site and hauled to a permitted landfill for disposal. Vault Toilet 2% 100% C.4.3 Dig hole for burial of concrete vaults and sidewalks Dig hole at designated site locations for disposal of old concrete vaults and sidewalks at designated campgrounds and day use areas. Vault Toilet 2% 100% C.4.4 Remove and bury concrete vaults and sidewalks at designated sites. Remove old vaults and sidewalks, break small enough to move, haul and dump into designated site locations. Vault Toilet 2% 100% C.4.5 Restore vault toilet site. All vault toilet sites shall be restored back to original ground elevation contour as surrounding area. Fill shall be provided for filling and compacting excavated holes at the vault toilet sites. Vault Toilet 2% 100% C.4.6 Restore concrete burial sites. All burial sites shall be backfilled and leveled so the area can be mowed. Vault Toilet 2% 100%

More opportunities from Department Of Defense → W071 Endist Kansas City

Same awarding agency

NAICS: 332312
New
Federal
Debris Boom Supply and Install at Harry S. Truman Lake Project
Solicitation # W912DQ26QA080
Solicitation W912DQ26QA080 is a full and open competition for the design, fabrication, delivery, and optional installation of a debris boom system at Harry S. Truman Dam near Warsaw, Missouri. The primary objective is to protect the dam's tainter gates from floating debris to maintain spillway operational capacity and provide a visual barrier for boaters. The required system is approximately 2,000 feet long and must be designed to withstand site-specific hydraulic, wind, and wave conditions, including a minimum safety factor of 2.0 and the impact of a 100-foot log. All metallic components and load-bearing materials must be USA-made with manufacturer certifications. The contract is structured with three base CLINs for the supply and delivery of the boom and anchors, and one option CLIN for installation. Delivery is expected within 240 to 300 days of award, with the installation option exercisable within 270 days. Technical constraints strictly prohibit any drilling into or under the earthen dam, and all lakebed anchors require review by the Kansas City District Dam Safety Manager. Award will be based on the most advantageous offer, evaluating price, relevant experience, and past performance. Quotes must be submitted in PDF format and include a completed SF 1449, pricing, and documented project experience.
Fabricated Structural Metal Manufacturing

POSTED

about 16 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Federal
Veterans Affairs St. Louis Health Care System (VASTLHCS) John Cochran (JC) Hospital in St. Louis, Missouri
Solicitation # W912DQ26RA060
The U.S. Army Corps of Engineers Kansas City District is soliciting proposals for an Integrated Design and Construction (IDaC) contract to modernize the Veterans Affairs St. Louis Health Care System John Cochran Hospital in St. Louis, Missouri. This large-scale project involves demolishing deficient buildings and constructing several new seismically compliant facilities, including a new inpatient bed tower, a clinical expansion, an engineering building, a central utility plant, a water tank, and three parking structures. The total construction cost limit for the requirement is 1.42 billion dollars. The project is being solicited as full and open and requires offerors to submit proposals subject to Project Labor Agreement requirements. The contract is structured with a Pre-Construction Services phase (CLIN 0001) with a performance period of 820 calendar days from the Notice to Proceed, followed by various construction options. Award will be made to a single responsible offeror using a best-value tradeoff process, where non-priced factors are significantly more important than price. To be eligible, offerors must achieve at least an acceptable rating for technical factors and small business participation. Required submissions include a proposal guarantee of 20 percent of the proposed price or 3 million dollars, whichever is less, and full payment and performance bonds upon award. Technical requirements mandate compliance with USACE EM 385-1-1 safety standards, LEED v5 building design, and FGI Hospital Guidelines. The scope includes complex deliverables such as a VA swing space and a phased turnover schedule for various medical zones. Offerors must provide a detailed staffing plan, including a Site Safety and Health Officer and a QC Manager, and must utilize a third-party vendor for cybersecurity assessments. Proposals must be submitted electronically in PDF format by November 25, 2026, adhering to strict page limits and formatting guidelines.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 27 days
View Details
NAICS: 237110
Federal
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
Solicitation # W912DQ27BA002
The U.S. Army Corps of Engineers, Kansas City District, is soliciting bids for the Atchison Storm Sewer Separation Improvements project in Atchison, Kansas. This small business set-aside construction project, with an estimated value between 1 million and 5 million dollars, involves the separation of storm and sanitary sewers. The scope of work includes the installation of reinforced concrete pipe, reinforced concrete box culverts, and storm water inlets and junction boxes, as well as the removal of existing sewer structures. The contractor is responsible for providing all necessary labor, equipment, and supervision, including incidental grading and the restoration of parkways, driveways, sidewalks, and pavement to a condition equal to or better than the original state. The solicitation is issued as a sealed bid under NAICS code 237110, with a response deadline of November 13, 2026. The project is divided into two primary components: the 16th Street Alignment and an optional 15th Street Alignment. Key requirements include adherence to the City of Atchison Public Works Specifications, compliance with the Davis-Bacon Act, and the submission of a project schedule within 42 days of the notice to proceed. Contractors must provide performance and payment bonds and participate in a partnering session within 45 days of the award. Quality assurance involves inspections of precast concrete units upon delivery and mandatory approval of saddle installations by the Contracting Officer's Representative prior to backfilling.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 15 days
View Details
NAICS: 562910
Federal
SB ERS MATOC, USACE Northwestern Division and EPA Region 2
Solicitation # W912DQ26RA109
The U.S. Army Corps of Engineers, Kansas City District, is establishing a Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services (ERS) to support the USACE Northwestern Division and EPA Region 2. This total small business set-aside under NAICS 562910 has a maximum value of 245 million dollars, with a minimum guarantee of 2,500 dollars per contract. The period of performance runs from June 4, 2027, to June 3, 2032, with a six-month extension option available through December 3, 2032. The scope of work is extensive, covering in-situ thermal and chemical remediation, operations and maintenance of groundwater treatment and soil vapor extraction systems, field investigations, remedial design, risk assessments, and support for abandoned mines programs. Task orders will be executed as either Firm Fixed Price or Cost Plus Fixed Fee. This is a competitive, best-value acquisition utilizing the Highest Technically Rated Offeror with Reasonable Price methodology. Proposals are evaluated based on corporate experience and past performance, with awards granted to the highest technically rated offerors whose pricing is determined to be fair and reasonable; no price-technical tradeoffs will be performed. Offerors must submit two separate electronic PDF volumes via the PIEE Solicitation Module. Contract administration requires the use of the Wide Area WorkFlow system for invoicing and adherence to strict quality standards, including the preparation of Contractor Quality Control Plans and Quality Assurance Project Plans for each task order.
Remediation Services

POSTED

21 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS