Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 9, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY-CNF Wastewater Improvements

Awarded
AG-9702-S-10-0383Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The US Forest Service awarded a firm-fixed price contract for wastewater improvements at the El Cariso Hot Shot Camp and Silverado Fire Station in San Diego, California. This project was designated as a total Small Business set-aside under NAICS code 237110, with an estimated construction magnitude between 25,000 and 100,000 dollars. The contractor is responsible for providing all management, labor, equipment, and materials necessary to complete the work within 64 calendar days following the Notice to Proceed. The scope of work involves the installation of two separate septic systems at the El Cariso Hot Shot Camp, including the installation of new sewer lines, septic tanks, and leach fields, as well as the abandonment of specific existing lines. At the Silverado Fire Station, the project requires pumping and demolishing an existing septic tank and replacing it with a new traffic-rated septic tank, sewer line, and distribution box. This acquisition was processed under FAR 13 Simplified Acquisition Procedures as part of the Recovery Act.

General Info

Contract Value

$118,701

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Cleveland NF 10845 Rancho Bernado Rd Ste 200, SAN DIEGO, CA, 92127, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Jun 2, 2010. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 10:00 PM UTC to 7:00 PM UTC on Jun 2, 2010. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 10:00 PM UTC on Jun 2, 2010. The notice description changed.

Notice updated

Response deadline changed from Jun 2, 2010 to Jun 4, 2010. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
Contacts1 person available
OfficeWashington, DC, 20250, USA
Office AddressWashington, DC, 20250, USA
Contacts
Maria Yvonne CristACQUISITION ANALYST

Full Description

Show more
RECOVERY (ARRA) THIS IS NOTIFICATION THAT THE US FOREST SERVICE HAS AWARDED THIS CONTRACT TO THE ABOVE MENTIONED CONTRACTOR. This acquisition was advertised April 14, 2010 as a total Small Business set-aside, and any resultant firm-fixed price contract will be awarded pursuant to FAR 13, Simplified Acquisition Procedures. In accordance with FAR Part 36.204(b), the estimated magnitude of construction was between $25,000 and $100,000. The estimated contract period of performance is 64 calendar days after the Notice to Proceed. The applicable North American Industry Classification System (NAICS) Code is 237110. The Small Business Administration size standard is $33.5 million. Contractors were required to be actively registered with the Central Contractor Registration (CCR) system and the Online Representations and Certifications Application (ORCA). The contractor will provide all management and project administration services, quality control, logistical support, vehicles, labor, equipment and materials to complete the project on time and on schedule. The scope of work includes installation of two separate septic systems including all related appurtenances at the El Cariso Hot Shot Camp. Work includes intercepting existing lines at building and manways, and installing new sewer line to new septic tank and leach field and abandonment of some existing lines. At Silverado Fire Station, work includes replacement of existing septic tank and connection to existing leach field, pumping the existing septic tank clean of sewage, demolishing existing septic tank, installation of new traffic rated septic tank, sewer line, distribution box and all related appurtenances. The location is in Cleveland NF - El Cariso Hot Shot Camp and Silverado Fire Station in San Diego, CA. TAS::12 1102::TAS Capitol Improvement and Maintenance

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS